PlanPlus (http://planningonline.gov.in) A tool for Decentralized, Participatory & Integrated District Planning
Planning As Is TFC BRGF NREGS Plan Gram Panchayat Planning currently done in silos (scheme-based) May not match with the local needs (not demand driven) Convergence of funds not happening. Ineffective Utilization of funds Lack of collaboration among planning units – Resulting in duplication and ineffective planning Gram Panchayat NREGS TFC BRGF Own Funds Funding NREGS Plan TFC BRGF Plans
Objective Facilitates the Decentralized Planning process in Local Language by Supporting Need Based Planning rather than Scheme-based planning Facilitating convergence of funds from different central and state sponsored schemes to address the needs of the people Facilitating integration of plans prepared by various planning units into a single district plan document Helping in monitoring the execution of the plan Generating various graphs for analysis and decision support Helping in the preparation of Perspective Plans and deriving the annual draft and action plans from perspective plans
Stakeholders Rural Local Bodies Urban Local Bodies District / State Level Line Departments DPCs / Planning board Citizens State Government Departments Central Government Departments
National Informatics Centre
PlanPlus Sections Requirement Section Resource Envelope Section Capturing Information on Wish List, Works(location, proposed cost, proposed duration, asset/beneficiary, output) and Projects Resource Envelope Section Information about Resource Envelope Available with Planning Unit (Perspective Allocation/ Expected Allocation / Actual Allocation) Planning Section Creating Perspective, Annual Draft Plan and Annual Action Plan, Allocating available resources to Prioritized works
PlanPlus Sections Technical Appraisal Section Scrutinize Plans submitted by Planning Units and offer comments on cost, duration and methodology Administrative Approval Section Scrutinize Plans for administrative approval DPC Approval Scrutinize Plans cleared by TAC and accord/endorse approval and integrate it with District Annual Plan – DPC Plan Execution Monitoring Record Execution Details of Works Approved in the Action Plan – Planning Unit Report Section Generate various reports that reflect Plan-Unit wise Plans, Scheme Plans, Physical & Financial Progress etc.
Requirement Section Stakeholder – Planning Unit
Suggestion Box PlanPlus captures the needs identified through SWOT analysis/Gram Sabha/Ward Sabha or even by individual citizen. These suggestions are forwarded to the planning units The planning units can decide if there is a need to take up the suggested need as a work in any of the Plans National Informatics Centre
Suggestion from Citizen
Suggestion From a Planning Unit
Work Category PlanPlus allows each State to define categories of works Egs. Include Construction of CC Road, Laying of water pipeline etc. Each work category is associated with a specific work focus area such as roads, drinking water etc. Each work category is mapped to specific outputs
National Informatics Centre
Mapping of Assets to Work Category National Informatics Centre
Works Planning Process begins with the structuring of unstructured wish-list into structured works by each Planning Unit Work Details include among other parameters the following: Work For - Whether the work is for specific section of the population such as SC, ST, Women etc. Work Focus Area – What is the focus area of the work? The list includes the 29 and 18 functions allocated to Panchayats and urban local bodies under the Constitution. This will help in generating the sectoral plan Estimated Cost Estimated Duration Proposed Output – Asset, Training, Staff Augmentation etc.
Asset Details
National Informatics Centre
Capacity Building National Informatics Centre
Staff Augmentation National Informatics Centre
Project A project is a logical collection of related works, possibly belonging to different sectors A project may have two or more works It is not mandatory for every work to be included in a project Helps in bringing about sectoral integration and ensures maximum impact of the interventions in different sectors National Informatics Centre
National Informatics Centre
Sources of Funding Stakeholder – Central Govt. /State Govt Sources of Funding Stakeholder – Central Govt./State Govt. / Local Govt.
Sources of Funding Stakeholder Central Government Departments (CSSs, ACAs etc.) State Government Departments (state government schemes)
Sources of Funding The software captures details about various Sources of Funding in the form of Centrally Sponsored Schemes/State Government Schemes Details include inter-alia, Scheme Active Period Geographical Coverage Target Group Component Focus Component Funding Pattern (State-wise and year-wise) Permissible/Non Permissible Activities
National Informatics Centre
National Informatics Centre
National Informatics Centre
National Informatics Centre
Resource Envelope Stakeholder –State Govt.
Resource Envelope Plan-unit wise resource envelope can be defined for each Source of Funding Resource envelope corresponds to Allocation under various Central and State Government Schemes (Perspective, Expected and Actual budgetary Allocation) Plan unit’s own funds through taxation and various services
Funding Sources Own Funds State Line Department Parastatal Bodies PSUs BRGF NREGS TFC Funding Sources Parastatal Bodies State Line Department PSUs Central Govt. NREGS BRGF TFC Grants State Govt. SFC Grants-in-aid Assigned Revenues Own Funds Tax Revenues Non-tax revenues Service Delivery
Tied & Untied Funds Tied Funds Available through schemes/programmes Can be used only for purposes for which intended Untied Funds Own Funds Untied grants from Central & State Governments such as Central & State Finance Commission Grants, State Budgetary Allocation and schemes of Central & State Governments (eg., BRGF) Can be used for any purpose Can be used for gap filling along with tied funds and used alone where no funding is available through any schemes
Planning Process Stakeholder - Planning Units Facilitates preparation of Perspective Plan, Draft Annual Plan and Annual Action Plan
Planning Cycle Five Year Plan Long Term Perspective Annual Perspective Plan Five Year Plan Long Term Perspective Draft Annual Plan Annual Based on expected allocation Action Plan Based on budgetary allocation Execution Physical & Financial Progress Details Execution status and learnings
Street lighting in Gram Panchayat Identify Resources Street lighting in Gram Panchayat NRWSP TFC BRGF Own Funds
Construction of Water Pipeline Identify Resources Construction of Water Pipeline NRWSP TFC BRGF
Planning A plan would consist of one or more works. PlanPlus automatically includes all works which have been created for the Plan Year. In addition, it also includes spill-over, on-going and resumed works from previous years’ plans in the current Plan. Based on the sector of the work and that of the component, the software automatically shows the amount of expected allocation under different components of different schemes. The Planning unit can allocate funds from different schemes/components to different works One work may be funded by more than one Source of Funding, thereby converging the funds from different funding sources If any permissible activity is defined under a component, then the planner will have to indicate the activity of the component under which the work is being undertaken.
Planning (contd.) Works may be included or excluded from the plan as per availability of funds. However, works which are on-going or spill-over cannot be excluded. Works funding can be shared by multiple Planning Units Priority can be set for each work; fund availability is automatically re- calculated A Planning unit has to answer defined Process Checklist based on scheme components from funds are proposed to be taken up The software also informs the planner about fund availability under different schemes under different sectors thereby ensuring maximum utilization of funds
Create Plan
Allocation of Funds to Works
Collaborative Planning
Who is doing what in my Gram Panchayat What are other planning units planning for my GP? Am I duplicating their efforts? Gram Panchayat District Panchayat Block Panchayat Line Departments Urban Local Bodies Parastatal Bodies Others
Can I Collaborate? Can I add value to what others are planning in my GP? Is the other planning unit short of funds? Can I contribute? Am I short of funds? Is any other planning unit willing to contribute? Gram Panchayat Zilla Parishad Panchayat Block Line Department Urban Local Bodies Parastatal Bodies
Sharing of Work Funding Provision to share the cost of Work among different Planning Units Planning Unit can demand the amount from multiple planning units Planning Unit giving the amount can accept/reject the demand Mandatory to freeze the amount if the request for demand is accepted.
National Informatics Centre
National Informatics Centre
Standing Committees Provision to define Plan Unit wise Standing Committees Planning Unit can assign works to the Standing Committee’s Mandatory to assign works to Standing Committee (for both Draft Action Plan and Annual Action Plan) if Standing Committee exist for the Plan Unit.
Kerala Planning Workflow
Kerala Planning Workflow Citizens/ NGOs/ Suggest CBOs / Needs/Expectations GramSabhas / Area Sabhas / Planning Units Unstructured wish - list SORs Planning Unit Assign Formulate Projects Prepare Annual Plan ( ULBs & RLBs ) Works to Projects (Prioritization & (Sectoral Integration) (Estimates,time, location etc) source of funding) Forward to TAC Technical Approval Committee Evaluate for Review Technical Scrutiny/ All works approved? (BTAC/DTAC/STAC) Sanction Yes Evaluate for Review DPC All works approved? Administrative Approval Approved Plan Yes National Informatics Centre
prepare cost estimates Administrative & Financial Approval Karnataka Local Body Planning Work Flow Suggest GramSabhas/ Ward Sabhas Needs/Expectations Prioritize RLB/ULB (Standing Committee) Prepare Shelf of works Allocate Funds Line Deptt. Yes Identify More Works Technical Scrutiny Forward (for technical scrutiny & preparation of cost estimates) (AE/EE/CE) Review Evaluate work s & prepare cost estimates All works OK? ZP (General Body) Review Evaluate for Administrative & Financial Approval All works approved? Accord Final Approval DPC Approved Draft Plan
General Administrative prepare cost estimates Examine Lower Tier Plan Rural Local Body WorkFlow – Madhya Pradesh Suggest GramSabhas/ Ward Sabhas Needs/Expectations RLB (Standing Committee / General Administrative Committee) Prioritize Prepare Shelf of works Allocate Funds Forward (for technical scrutiny & preparation of cost estimates) Technical Scrutiny Review Evaluate work s & prepare cost estimates All works OK? Forward Own Plan along with lower tier Plan, if any Higher Tier (JP/ZP) Examine Lower Tier Plan Prepare Own Plan Forward all RLB Plans Accord Final Approval DPC Approved Draft Plan
prepare cost estimates Urban Local Body WorkFlow – Madhya Pradesh Suggest GramSabhas/ Ward Sabhas Needs/Expectations ULB (Standing Committee) Prioritize Prepare Shelf of works Allocate Funds Forward (for technical scrutiny & preparation of cost estimates) Technical Scrutiny Review Evaluate work s & prepare cost estimates All works OK? Accord Final Approval DPC Approved Draft Plan
Gram Panchayat WorkFlow – Orissa Suggest Needs/ Expectations Palli Sabhas Gram Panchayat Prepare Shelf of works Prioritize Allocate Funds Forward (for technical scrutiny & preparation of cost estimates) JE(Block)/ AE(Block) (Technical Approval) Evaluate work s & prepare cost estimates OK Sarpanch/Gram Panchayat (Administrative Approval) Accord Adm. Approval) Review All works OK? Forward Panchayat Samiti Forward GP Plan Zilla Parishad Forward GP Plan DPC Accord Final Approval Approved Draft Plan
Panchayat Samiti WorkFlow – Orissa Suggest Needs/ Expectations Citizen Body Panchayat Samiti Prepare Shelf of works Prioritize Allocate Funds Forward (for technical scrutiny & preparation of cost estimates) JE(Block)/ AE(Block) / EE(DRDA)/ SE(PR Dept.) (Technical Approval) Evaluate work s & prepare cost estimates OK BDO/ PS, Chairman/ Collector Accord Adm. Approval) Review All works OK? Forward Zilla Parishad Forward PS Plan DPC Accord Final Approval Approved Draft Plan
Zilla Parishad WorkFlow – Orissa Suggest Needs/ Expectations Citizen Body Zilla Parishad Prepare Shelf of works Prioritize Allocate Funds Forward (for technical scrutiny & preparation of cost estimates) JE/ AE/ EE/ SE(PR Dept.) (Technical Approval) Evaluate work s & prepare cost estimates OK Secretary, ZP/ Exec. Officer, ZP/ CEO, ZP (Administrative Approval) Accord Adm. Approval) Review All works OK? DPC Accord Final Approval Approved Draft Plan
Planning Workflow in PlanPlus Captures the plan unit wise, state-specific work flows as defined by the State Planning Department. The Plan is routed to various stakeholders as per the defined workflow. Different Workflows can be defined for Draft Annual Plan and Annual Action Plan Versions of the workflow are maintained to ensure consistency in legacy plans.
Technical Scrutiny Scrutinize Plans submitted by Planning Units and offer comments on cost, duration and methodology Once an optimal Plan has been prepared by a planning unit, it may get forwarded for technical clearance At the time of technical clearance, the Plan may be forwarded to more than one approving entity based on the sector and cost of the work. The Plan is returned back to the Planning Unit if any work requires modification to meet technical (for eg., revision of cost estimates) The Planning Unit must modify as per the clearance requirement and forward it back for clearance If all works are cleared, the Plan is forwarded to the next level as defined in the process flow of the planning unit.
Administrative Approval At different stages of planning process, administrative approval may be required at different levels. The privilege for administrative approval can be given to a user for one or more planning units Based on the workflow, the plan of the planning unit will be automatically forwarded to the approving authority
National Informatics Centre
DPC Approval Review and Consolidate the plans of local bodies in view of district priorities Accord clearance for the plans of each planning unit in the district after examining the plans in a holistic manner Generate the District plan - DPC
Plan Review/Consolidation by DPC The DPC can generate sectoral views of the Plan (to be reviewed by sectoral committees) and take decisions (scrutinise, review and approve) on each work included in the Plan The DPC can either approve a Plan (if all works are approved) or return the Plan to the planning unit for review/modification The DPC can look at the plan unit wise plan report which provides a detailed analysis of the Plan of the selected planning unit
Records Execution of Works Approved in the Plan Planning Execution Records Execution of Works Approved in the Plan National Informatics Centre
Plan Execution Planning Unit can Record Execution of Works Approved in the Action Plan Frequency of Recording is event-based Expenditure on the Work can be recorded Component Wise Work-wise outputs to be Achieved can recorded
Fund Receipt Details
Work Execution Status
Expenditure Details
Physical Progress
Reports Annual Plan of respective Plan Units Integrated District Plan History of the Plan as it goes through the cycle of revisions Status of approval of different works Expected Fund utilization Sectoral Plan Scheme Plan Sectorwise Scheme plan and vice versa Sectorwise BRGF allocation Gap filling by BRGF
National Informatics Centre
National Informatics Centre
National Informatics Centre
Plan Unit Report
District Plan Report Template National Informatics Centre
District Plan Report National Informatics Centre
District Plan Document Anatapur, Andhra Pradesh Dhenkanal, Orissa
Customizing PlanPlus PlanPlus is a highly generic software making it easy to customize it to specific requirements Provides complete local language support in UNICODE Captures the state-specific workflows as defined by the State Planning Department Can be easily extended to facilitate the preparation of state and central government plans. Is web-based but can be installed locally also Based on Open source tools and technologies National Informatics Centre
Capacity Building No. of trainings – 4 No. of people trained - 172 National Workshops No. of trainings – 4 No. of people trained - 172 State Level No. of trainings – 88 No. of people trained - 2534 District Level Trainings No. of trainings – 292 No. of people trained – 7820 Total Trainings No. of trainings – 386 No. of people trained – 10526
Capacity Building Workshops No. of Workshops Total No. of People Trained National Level 4 172 State Level 88 2534 District Level 292 7820 Total 386 10526 Training Details available at http://panchayat.gov.in/priprofiler Demo Site for hands-on available at http://panchayat.gov.in/planplus Computer Based Tutorial (CBT) available both online as well as for download from both demo as well as actual site
Implementation Status Plan Year No. of District Plans Total No. of Approved Plans No. of BRGF Planning Units adopted Planplus. 2007-2008 37 21344 34612 2008 - 2009 66 35512 53952 2009 - 2010 63 38583 57249
Thank You