Globally Interoperable Systems and Data

Slides:



Advertisements
Similar presentations
ASBU Methodology Summary of Block 1 Modules Saulo Da Silva
Advertisements

ASBU Methodology Summary of Block 2 and 3 Modules Saulo Da Silva
Block 1 Overview Rubén Oscar González Air Navigation Commissioner
Industry Viewpoint – Block 0 Carlos Cirilo Assistant Director Infrastructure Strategy 16 November 2012.
Template created by Giorgio Camilleri, March 2006 June 2006 TRANSITION ICAO Air Navigation Bureau Radio Spectrum Seminar Cairo, Egypt.
Blocks 2 & 3 Overview Samuli Vuokila Air Navigation Commissioner
ICAO Aviation System Block Upgrades (ASBU) and SWIM/AMHS
Presented by United Arab Emirates MID ATM ENHANCEMENT PROGRAM (MAEP) TECHNICAL PROPOSAL.
FF-ICE/1 and ASBU- Block 1
International Civil Aviation Organization Creating Operational Improvements Through Aviation System Block Upgrades Nancy Graham Director, Air Navigation.
Basket of Measures ICAO Secretariat.
ICAO Aviation System Block Upgrade Executive Briefing:
International Civil Aviation Organization 5-6 MARCH 2012 AMHS/SWIM SEMINAR/WORKSHOP SP/13.
ICAO: Global Harmonization Plan
Information Management Panel Update
© 2013 The MITRE Corporation. All rights reserved. Stéphane Mondoloni, Ph.D. FF-ICE/1 and ASBU- Block 1.
Information Management The ICAO Perspective
Continuous Climb Operations (CCO) Saulo Da Silva
1 Augmenting Path Algorithm s t G: Flow value = 0 0 flow capacity.
SESAR and ASAS Opportunity
GO PLAY WITH MICKEY. COOK PAINT SURF RUN SLEEP WALK DRIVE SWIM Mickey is painting.
International Civil Aviation Organization Block Upgrades Next Steps & AN-Conf/12 Alexander Korsakov Air Navigation Commissioner International Civil Aviation.
1 Augmenting Path Algorithm s t G: Flow value = 0 0 flow capacity.
International Civil Aviation Organization Aviation System Block Upgrade (ASBU) Methodology Introduction and Navigation Roadmap GNSS Workshop 26 March 2012.
International Civil Aviation Organization ASBU Methodology Summary of Block 0 Modules H. Sudarshan SIP/2012/ASBU/Nairobi -WP/8 Workshop on preparations.
International Civil Aviation Organization Block 0 Overview Halidou Moussa Air Navigation Commissioner International Civil Aviation Organization.
The SESAR Target Concept of Operations ASAS Related Aspects
ASBUs Block 1 Overview The CANSO Viewpoint Eugene Hoeven Director ICAO Affairs ICAO Liaison Office Pre-AN-Conf/12 Workshop Montreal, November 2012.
APAC Cross Border ATFM Initiatives
International Civil Aviation Organization Airspace Allocation and Use Mitchell A. Fox Chief Flight Operations Section, ANB 10 April 2012 IAOPA World Assembly.
1 The model of integrated use of information for provision of aircraft flights Completed by: Kolosok A. Supervisor: Luppo O.E. Модель інтегративного використання.
NATIONAL AVIATION UNIVERSITY Institute of Air navigation Air Navigation Systems Department Graduate work MASTER’S DEGREE THESIS «Modeling of flight using.
International Civil Aviation Organization Overview of the Block Upgrades Concept Tai Feng Air Navigation Commissioner International Civil Aviation Organization.
Larry Ley | Digital Aviation | Boeing Commercial Airplanes
ASBUs Block 1 Overview The CANSO Viewpoint Eugene Hoeven
Block 0 Overview Halidou Moussa Air Navigation Commissioner
Performance Framework for Efficiency H. Sudarshan
Aviation System Block Upgrades and NAV CANADA Planning
ASBU Methodology Summary of Block 2 and 3 Modules Saulo Da Silva
AMHS/SWIM SEMINAR/WORKSHOP
GNSS IMPLEMENTATION SEMINAR
AVIATION SYSTEM BLOCK UPGRADES (ASBU)
SWIM in NSS CONOPs 2023 Wellington 29 September 2016.
ASBU Methodology Summary of Block 1 Modules Saulo Da Silva
Industry Viewpoint – Block 0
A brief on APIRG Eng. John Tusubira Kagoro
Communication (Reviewed by CRV TF/2)
Continuous Climb Operations (CCO) Saulo Da Silva
Performance Framework for Efficiency H. Sudarshan
Overview of the Block Upgrades Concept
ASBU Methodology Summary of Block 0 Modules H. Sudarshan
Blocks 2 & 3 Overview Samuli Vuokila Air Navigation Commissioner
Proposed communication
Block Upgrades Next Steps & AN-Conf/12
Hands-on Exercises Performance Based Planning and use of IFSET
ANConf/12 – Agenda H. Sudarshan
ATFM IMPLEMENATION IN INDIA – FUTURE PLANS
Delivering NATS ATM CO2 Targets
ASBU Methodology Summary of Block 0 Modules H. Sudarshan
Continuous Climb Operations (CCO) Saulo Da Silva
Trajectory-Based Operations(TBO) Saulo Da Silva
ANConf/12 – Agenda H. Sudarshan
Global Air Navigation Plan (GANP) Aviation System Block Upgrade (ASBU)
ICAO Air Navigation Bureau
Team 1 Design Team 4 Inc Team 3 LLC Team 7 Global Team 11 Design
Hands-on Exercises Performance Based Planning and use of IFSET
State ANP Workshop November 5-10, 2018
ASBU Methodology Summary of Block 1 Modules Saulo Da Silva
Continuous Climb Operations ( CCO )
Block 1 Overview Rubén Oscar González Air Navigation Commissioner
Presentation transcript:

Globally Interoperable Systems and Data B0-APTA B1-APTA B0-WAKE B1-WAKE B2-WAKE Greener Airports B0-SURF B1-SURF B2-SURF B0-ACDM B1-ACDM B0-RSEQ B1-RSEQ B2-RSEQ B3-RSEQ B1-RATS B0-FICE B1-FICE B2-FICE B3-FICE Globally Interoperable Systems and Data B0-DAIM B1-DAIM B1-SWIM B2-SWIM B0-AMET B1-AMET B3-AMET B0-FRTO B1-FRTO B3-FRTO Optimum Capacity and Flexible Flights B0-NOPS B1-NOPS B2-NOPS B0-OPFL B0-ASUR B0-ASEP B1-ASEP B2-ASEP B0-SNET B1-SNET B0-ACAS B2-ACAS B0-CDO B1-CDO B2-CDO B3-TBO Efficient Flight Path B0-CCO B0-TBO B1-TBO B1-RPAS B2-RPAS B3-RPAS

Globally Interoperable Systems and Data Greener Airports B0-75 B1-75 B2-75 B0-80 B1-80 B0-15 B1-15 B2-15 B3-15 B1-81 B0-25 B1-25 B2-25 B3-25 Globally Interoperable Systems and Data B0-30 B1-30 B1-31 B2-31 B0-105 B1-105 B3-105 B0-10 B1-10 B3-10 Optimum Capacity and Flexible Flights B0-35 B1-35 B2-35 B0-84 B0-86 B0-85 B1-85 B2-85 B3-85 B0-102 B1-102 B0-101 B2-101 B0-05 B1-05 B2-05 B3-05 Efficient Flight Path B0-20 B0-40 B1-40 B1-90 B2-90 B3-90