SOFIA Program Status Bob Meyer January 10, 2010 Program Manager.

Slides:



Advertisements
Similar presentations
SOFIA SOFIA Science Steering Committee Meeting Palmdale, Feb 18, 2010 Dietmar Lilienthal / Alois Himmes.
Advertisements

SOFIA SSSC Program Status Robert Meyer Program Manager February 18, 2010.
GOES-R Ground Segment Project Update American Meteorological Society Annual Meeting Atlanta, Georgia January 20, 2010 Vanessa Griffin Project Manager,
SOFIA SSSC Program Status Robert Meyer Program Manager September 29, 2009.
1 Universities Space Research Association SOFIA Program Options SSSC 18 February 2010 Mina Cappuccio SOFIA Science Project Manager NASA Ames Research Center.
SOFIA Program Overview CSTA Eddie Zavala Deputy Program Manager October 21, 2011 SS1 Orion Image.
Server Virtualization: Navy Network Operations Centers
Nova Labs - RhinoHawk Introduction Meeting March 20 th, 2014.
MCCS Status Update SOFIA SITR Kendall Mauldin SOFIA Platform Project Flight Systems Lead SOFIA Stratospheric Observatory for Infrared Astronomy.
1 R. D. Gehrz 66th International Symposium on Molecular Spectroscopy, Columbus, OH, June 23, 2011 The Stratospheric Observatory for Infrared Astronomy.
TA Testing Plans Walter E. Miller OSC/ARC SSSC 29 September 2009.
SSSC 02/18/2010 P. Marcum Science Utilization Policies SOFIA SCIENCE UTILIZATION POLICIES Pamela M. Marcum SOFIA Project Scientist SSSC Feb 19, 2010.
Mars 2020 Project Matt Wallace Deputy Project Manager August 3, 2015.
1 INSTITUTE OF SPACE SYSTEMS Universität Stuttgart Universities Space Research Association Deutsches SOFIA Institut American-German.
WMC Guidance Department Junior Planning Night December 5, :00 p.m.
Cycle 1 Planning Process B-G Andersson (SOFIA Science Operations Manager) & Ravi Sankrit (User Support Scientist) SSSC, May 11, 2011 Mountain View.
WMC Guidance Department Junior Planning Night December 6, :00 p.m.
1/11/2011AAS SOFIA splinter (Seattle, WA) 1. 1/11/2011AAS SOFIA splinter (Seattle, WA) 2 SOFIA Stratospheric Observatory for Infrared Astronomy 2.7-meter.
1 R. D. Gehrz 64th International Symposium on Molecular Spectroscopy, Columbus, OH, June 23, 2009 The Stratospheric Observatory for Infrared Astronomy.
1 1 SOFIA: Progress and Initial Science Flights Erick Young SOFIA Science Mission Operations Space Telescope Science Center March 30, 2011.
Folie 1 > SSSC/SITR Meeting, NASA-ARC > September 28/29, 2009 > D. Lilienthal SSSC/SITR Meeting NASA-ARC, September 28/29, 2009 Dietmar Lilienthal, DLR.
1 R. D. Gehrz 67th International Symposium on Molecular Spectroscopy, Columbus, OH, June 21, 2012 The Stratospheric Observatory for Infrared Astronomy.
GLAST LAT Project DOE/NASA Review, March 31, GLAST Large Area Telescope: Lowell A. Klaisner Stanford Linear Accelerator Center Project Manager
Solar Probe Plus A NASA Mission to Touch the Sun March 2015 Instrument Suite Name Presenter's Name.
Update to NLAG board 22 nd December Sep Jan MCE Workforce and OD Oct Nov Dec IM&T Estates Finance In hospital Model Out of hospital Model Progress.
1 FLITECAM December 11, 2008 Ian McLean (Principal Investigator) UCLA Infrared Laboratory University of California, Los Angeles.
1 HIPO Trimester Review Status Report Ted Dunham Lowell Observatory 28 April, 2009.
JWST Mission CDR Northrop Grumman Space Systems Redondo Beach (CA) April 10-16, 2010.
23-Nov-1999STScI Projects Monthly Status Review1 of 8 SpaceTelescopeScienceInstitute COS Status Report for period December, 1998 to November, 1999 Tony.
1 Universities Space Research Association Science Instrument Pipeline Requirements SSSC 2009 September 29 Erick Young Director SOFIA Science Mission Operat.
Near-term schedule Scott Horner. Background MCCS software engineering build #3 was delivered in June and tested by the SIL team in early July A number.
Update to Proposition 1E – Early Implementation Project (EIP) Application and Local Share Reclamation Board Sub-Committee Meeting September 11, 2007.
GLAST Science Support Center May 8, 2006 GUC Meeting AI#28. SAE Release Schedule David Band (GSSC/JCA-UMBC) Julie McEnery (GSFC)
Schedule and Milestones Roy Preece STFC RAL FAC 17 th April 2015.
Commissioning Planning
SOFIA--The Next Generation Airborne Observatory
Effectiveness of Contingency Flights
Preparing for a successful upgrade
Jim Fast Pacific Northwest National Laboratory
The Importance of Solar Car Project Management
SOFIA — The Observatory
JSOC Status at SDO PSR-1 January 21-22, 2009 GSFC
I&T&C Organization Chart
GLAST Large Area Telescope:
Senior Staff Meeting November 12, 2008
Development Test Overview
Agency SFY IT Strategic Plans: Training
Z2 Crediting Project Update RTWG
Management Breakout: MREFC Budget Summary Victor L
SMEAL MENTORING PROGRAM EVENT CALENDAR
Faculty Champion Meeting
Update to NLAG board 24th November 2015
Project Status: [Project Name]
Click to add title Planning for LSST Verification George Angeli LSST All Hands Meeting Tucson August 15, 2016.
Executive Steering Committee Meeting May 6, 2009
<<Project Name>> – Engagement Status
GLAST Large Area Telescope:
Incorporating Risk Quantitative Software Management:
CBP Principals’ Staff Committee Briefing May 14, 2012 Meeting
Incorporating Risk Quantitative Software Management:
EVLA Construction Status
The Importance of Solar Car Project Management
Ctclink executive leadership committee May 31, 2018
Overview Cost to Complete
Integration & Test Instrument Operations Coordination
Session 4: Finalize Project Working Arrangements
IKCA CEA Technical ANNEXES Follow up 18th DECEMBER 2015.
Student Growth Measures
ESHAC #8 Safety Readiness Review Thomas Hansson, ESH
Brief introduction to the activities of the ETIP-DG Fausto Batini – President ETIP-DG Co-funded by the European Union's Horizon 2020 Research and Innovation.
Presentation transcript:

SOFIA Program Status Bob Meyer January 10, 2010 Program Manager

Agenda Executive Summary Recent and Upcoming Events Program Status Schedule (Bar chart and Lego chart) Risks Concerns / Issues Program Summary 11/10/2009

Executive Summary Other status JSPP II signed Program has made significant progress Cavity Door Drive System (CDDS) final flight test controller and software installed and working Mission Control & Communication System (MCCS) open door software and hardware checked and working Cavity Environmental Control System (CECS) experiencing failures, but is repaired and working Provides drying and some heating to cavity prior to and during descent 100% door open flight accomplished December 18th Science preparation on track for first science (instruments, labs, etc) Other status JSPP II signed Agreement on German workforce for operations German Science Data archiving agreement is TBD Segment 3 planning underway FIFI lost funding Limited slack to ISF milestone Program and Center’s working recovery strategies 11/10/2009

Door Full Open Flight, Dec 18, 2009 11/10/2009

Recent and Upcoming Events AFSRB part 2 at DAOF; November 19, 2009 Combined Systems Test; November 16-20, 2009 Mission Readiness Brief at HQ; November 30, 2009 SSPC at DSI in Stuttgart, Germany; December 3-4, 2009 Functional Check Flight; December 4, 2009 10% Door Open Flight; December 11, 2009 100% Door Open Flight; December 17, 2009 American Astronomical Society Meeting in Washington D.C.; January 3-7, 2010 SOFIA Splinter Session; January 4, 2010 SRB; Late-March 2010 DPMC; Mid-April 2010 APMC; Late-April 2010 TA Characterization/First light; spring 2010 Instrument workshop, June 2010, Asilomar, CA First science; fall 2010 11/10/2009

Schedule Overview (Bar Represents Tracking Schedule and red triangles represent our commitment) We are here! Instrument Commissioning Inst 1 Inst 2 Inst 3 Inst 4 First in-flight Light Inst 5 Door open Flight Inst 6 Arrival at Dryden First Door closed flight HIPO Line Ops Backup Basic Science TA V&V SS FIFI-LS D-Check Downtime CY07 CY08 CY09 CY10 CY11 CY12 CY13 CY14 1 2 3 4 ISF LOC FOC Avionics Upgrade Cavity Insulation Segment 3 Downtime Elements CECS Upgrade ISF = Initiation of Science Flights LOC = Limited Operational Capability FOC = Full Operational Capability SS = Short Science MCCS Upgrade Observatory Upgrades Science Flight activity Imager Improvements Engineering & Inst. Comm Flight activity A/C Testing/Work

Segment 2 – Tracking dates TA Misalignment (daytime) TA Activation 2010 TA Characterization/First Light attempt TA Characterization ISF   Science Flight Platform Flight TA Flight Ground Testing Data Analysis Contingency Flight IMS:SOFIA_IMS100112Araw.mpp Created 1/12/2010

Segment 2 – Tracking dates 2011   Science Flight Platform Flight TA Flight Ground Testing Data Analysis Contingency Flight IMS:SOFIA_IMS100112Araw.mpp Created 1/12/2010

Segment 3 – Tracking 2012 LOC 2012 2013 2013 FOC 2014 2014   Observing Flights Instrument Commissioning Aircraft maintenance/Observatory upgrade Platform flights IMS:SOFIA_IMS100112Araw.mpp Created 1/12/2010

Program Key Milestones Program ID Tracking Dates 70% JCL Risk Current PCA Milestone 1st Flight (Aircraft Functional Checks) L1-032 12/4/09 11/19/09   Segment 3 SRR L1-107 2/16/10 12/16/09 1st Open Door Flight L1-101 12/18/09 1/28/10 FORCAST Line Ops L1-102 4/2/10 3/30/10 First Light Opportunity L1-103 4/8/10 4/29/10 ISF – Short Science 1 Flights L1-037 8/17/10 10/26/10 8/2009 Envelope Expansion #2 L1-106 9/29/10 12/17/10 Segment 3 Progress Review L1-108 11/30/10 3/31/11 GREAT Line Ops L1-104 12/8/10 4/12/11 Short Science 2 Flights L1-105 1/11/11 5/11/11 Basic Science Flights L1-046 2/9/11 6/10/11 FIFI-LS Line Ops L1-110 4/26/11 8/30/11 FIFI-LS Science Flights L1-109 5/10/11 9/14/11 TA V&V / Aircraft Performance Flights L1-047 6/2/11 10/6/11 Open Door Flight Test Complete L1-052 6/29/11 11/10/11 9/2010 Limited Operation Capability (LOC) L1-055 8/31/12 3/18/13 Full Operational Capability (FOC) L1-056 6/19/14 12/16/14 12/2014 11/23/2009

Program Risk Management Matrix Criticality L x C Trend Decreasing (Improving) Increasing (Worsening) Unchanged New Since Last Period Approach M - Mitigate W - Watch A - Accept R - Research High  p Med [Risks are identified and trended from last review to current review]  Low  11/10/2009

SOFIA Program Risk Waterfall * RAC as averaged over the 12 open Program Risks * Segment 3 SRR Mitigations Open Door V&V/FCF/Open Door Flight Mitigations 12/10/2009

Program Summary Program has made significant progress Achieved 100% door open flight on December 18th Program successfully implemented recovery plan to achieve FCF and 100% door open flight prior to end of calendar year On-track to ship FORCAST soon Integration and line ops late winter TA characterization (door open and TA unlocked) and first light expected early April. Program has a concern with limited slack to Initiation of Science (ISF) Working recovery options 11/10/2009

Back-up 11/10/2009

CURRENT PLAN, per FRR slides