Aluminium Available in 1000mm wide

Slides:



Advertisements
Similar presentations
SECTION DRAWINGS.
Advertisements

Dr. Ruth Collins TrinityHaus
NGfL CYMRU GCaD LIGHTING APPLICATIONS.
ULTIMATE PORTABLE WORKSTATION Produced by Gavin Weyrich.
GRP Service Riser Systems PULTRUDED STRUCTURAL PROFILE SUPPORTS WITH GRP MOULDED ANTI SLIP GRATING FOR OPEN RISERS AND CUT OUTS FOR SERVICES.
Assembly Instructions DucoSlide Luxframe Controllable TOP BOTTOM L.H. R.H. Control side FRONT SIDE in open position REAR SIDE in open position 1.
Expand Media Wall & Podium Case Training Video’s & Instructions.
STAGES OF PAPER MANUFACTURE
Installation of Peripherals. I. Backup Battery.
CONSTRUCTION OF A “LITTLE FREE LIBRARY” Gary Mehlum, pressed into service by wife and UHLS employee Mary Fellows (“When you marry a librarian, you marry.
1 STEPMILL 7000 PT ASSEMBLY INSTRUCTIONS PART NUMBER
[[Click on topic to view page]]
-From back of computer, remove screws holding right side of case -Keep track of the screws you remove! -Take off case wall by pulling back, then away from.
ICRA Panel System Installation Instructions
Typical Walk-in Closet with elfa® décor
Living with the lab Prototyping with Sheet Metal.
SLITTER / REWINDER for Woven-non-Woven MOVIEINDEX.
QUINN TRUSS OPEN WEB JOIST SYSTEM TECHNICAL DETAILS.
Installation Guidelines. Items 1.Cutting Tools 2.Fixing Tools 3.Fixing Systems 4.Off-Shore cutting & installations 5.Previous Projects.
Sawing – An Introduction
Steel Mild steel Medium carbon steel High carbon steel or hard steel
Case Study – St Clair Park Village, Auckland, NZ
Health and Safety Training Standards in Design and Technology
Sawing. Reciprocating saws (power hack saw) being replaced by horiz band saws only cuts in one direction up to 24” x 24”
Production Plan Introduction / Aim To effectively plan out each stage of manufacturing in detail before actually developing your chosen product.
Lesson No. 11 Week No. 07 Name of lesson Marking Tools
VC Training Table Setup and Floating Agenda General –Air Supply Requirements Assembly –Assembling the System –Leveling the Table –Isolating.
Manufacturing Processes
Setting Out Joiners Rods “extracts from Practical Australian Carpentry” M. S. Martin Original 2005 Revised 2008.
‘The MUSU’. The MUSU was designed from basic concepts to a final design starting with simple sketches.
F. 1 Design and Technology
Extrusion and Drawing of Metals
Wood Construction CTC-375.
9.8 FK SERIES FK Series Characteristic Beam Width: 45mm Product Width: Refer to Guide Rail Assembly Accessories Needed Slide Rail Required: FASR-25K OR.
Proposed answers to lesson 2 calculations. Walls – 13mm Aqualine,fixed to timber, stopped to level 4 (m2) Materials - 13mm Aqualine (1.20 x 2.70) = $48.60.
Does (x+4) 2 = x ?. A square tabletop has side lengths of (4x – 6) units. Write a polynomial that represents the area of the tabletop.
Anyway Clip Hinges and Baseplates
Preparing a Cutting List. A cutting list is an accurate and very detailed list of the different parts that will make up your project/product. Your cutting.
Name: Unit21 A01 - Research. Website 1 Name: Website: Target Audience:
Level 1 Diploma in Plumbing Studies © 2013 City and Guilds of London Institute. All rights reserved. 1 of 23 PowerPoint presentation Preparation techniques.
The first step is to measure the depth of your box.
Making a spectroscope? Oleg Gontar. Do You Recall The Properties of Light? What is absorbance? What is transmittance?
Carpentry & Joinery Diploma Level 1 Flash Cards.
VIEW SERIES with Sliding Door
H, I & PLUS BEAM FABRICATION LINE WITH MATERIAL HANDLING
Can you identify and name the different materials in the table?
Installation Walkthrough Image Guide
Tracing Paper Transparent, hard and strong. Its translucency makes it suitable for tracing fine details drawn with fine lines. Used for working drawings.
Metal-Cutting Saws 1.
Electrical Diagrams.
Board Replacement for Floating Floors
Flash penetrations through roofs and walls.
Die Cutting!.
Unit 6.05 and 6.06-Learning about blueprints
SOMESHWAR METAL PVT LTD
Types of Blades used on Cutoff Saws and Tips on using Saws
DOOR &WINDOW DEPT. OF CIVIL ENGINEERING By Mr. M. M. MASKE.
Area of Triangles.
Pritesh h prajapati Arvind g prajapati Arvind m prajapati Arvind khata.
MECHANICAL ENGINEERING
HCAL Modules -First Ideas
Construction of running moulds
NEMA RV 3 Application & Installation Guidelines For Flexible & Liquid Tight Flexible Metal Conduits
Roller Shade system from Hunter Douglas
Cabover Camper Priyanka Chand Tyler Croissant Nik Roetemeyer
KAT Flat Roof Light.
Practical Metalworking
Direct Bond – Dry Lining to Masonry Backgrounds
DucoSlide Luxframe F Fitting instructions L.H. R.H.
Making a 2-crate Plant Light Box, PLB
Presentation transcript:

Aluminium Available in 1000mm wide Available in Standard and Bold Profile Silver or Off-white Bonded colour Lightweight Suitable for use in Swimming pools

Steel Available in 940mm width Available in Bold Profile Zincalume or Off-white Bonded colour Superior Strength Commonly used in Gymnasiums and Multi Purpose halls where impact is possible.

Foil Supplied in Rolls Foil supplied in Rolls up to 25lm in Aluminium Foil supplied in Rolls up to 15lm in Steel

Foil Packaging Sampal Pallet Foil Box Export Sampal Pallet Box

Support Bar Packaging Renhurst FasTrack Support Bar Packaged 4 lm

Set Out First determine Ceiling Layout Material width 1000mm (940mm Steel) Support Bar centers at 1005mm (945mm Steel)

Ceiling Set out

Set Out – Example 1

Set Out – Example 2 These set outs are examples only. Ceiling can be installed to meet Architects or Clients requirements.

End Wall Angle Determine Ceiling Height. Fix 20 x 20mm Aluminum angle to end walls

Starter Bar Attach Starter Bar to Support Bar Use Aluminum Pop Rivets

Position Support Bar Fix Support Bar to suspension clips Insert Support Bar Joiners Fix with Pop Rivet Close Suspension clip tab

Renhurst have a fixing clip to suit all applications

Close Support Bar Clip

Support Bar Joiner

Support Bar Detail Starter Bar supplied 300mm long including all components Can be used in any position Can be supplied in various lengths

Prepare Foil Determine length of material required Cut to length using sharp knife Ensure cut is made on the high side of the corrugation

Non Standard Width Determine width required. Roll Foil out onto a suitable Bench. Cut Foil using a high speed electric circular saw with an Aluminum cutting blade.

Lubricate Support Bar

Feed Foil into Support Bar

Feed Foil into Support Bar

Gently Pull Foil into Lubricated Support Bar.

Finishing off your ceiling Clip bottom section of starter bar into position