Florida Building Code Update

Slides:



Advertisements
Similar presentations
ROOFS.
Advertisements

Unit 55 Roof Finish Roof Overhangs and Cornices • Open Cornices • Closed Cornices • Cornice Soffit Systems • Covering Roofs • Asphalt Shingles • Wood Shingles.
ROOF SLOPES.
Roofs are one of a building’s primary elements and play a major part in giving a building its character. There are several different types of roof in.
Chapter 16 Roofing. First line of defense against the weather Precipitation (Rain, snow) Sun Thermal Transmission Subjected to extreme heat and cold Surface.
Finishes many options Walls wood shakes, shingles, board & batten (vertical), plank lap (horizontal), T1-11 ply, vinyl, fiber cement, aluminum, stucco.&
Carpentry Skilled Trades Ceiling and Roof Framing The most commonly used types of residential roof and ceiling construction are: Joist and Rafter.
Showroom and Design Center 5300 E Arrowhead Parkway Sioux Falls, SD
Competency: Draw Wall Sections
Building Code – Flashing Changes & Challenges Builder Breakfast and Luncheon Series Presented by:
10 Steps to Performing a Roof Inspection
CHAPTER 9 Thermal & Moisture Protection
Unit A3-10 Roofing Agricultural Structures Problem Area 3 Construction Systems.
© 2006 ITT Educational Services Inc. CD230 Architectural Design & Drafting: Unit 5 Slide 1 Unit 5 Roofs.
PERMITS & INSPECTIONS DEPARTMENT 2003 INTERNATIONAL RESIDENTIAL CODE IRC.
J157 Today’s Presentation: Codes & Approvals. J157 RPM Building Solutions Group is a Registered Provider with The American Institute of Architects Continuing.
New Approaches to Minimizing Water Intrusion in Attics Coastal Contractor Summit May 12-14, 2008 Tim Reinhold Director of Engineering & VP Institute for.
State of Virginia’s Adoption Uniform Statewide Building Code –Adopts model codes by reference Family of I Codes 2003 edition NEC 2002 edition –Statewide.
ROOF DESIGNS 1. TYPES OF ROOFS The roof greatly affects the overall appearance of a home. There are many standard styles from which to choose. Choose.
EXTERIORS FOR WOOD LIGHT FRAME CONSTRUCTION
1 | WEATHERIZATION ASSISTANCE PROGRAM STANDARDIZED CURRICULUM – July 2012eere.energy.gov Moisture Barriers WEATHERIZATION INSTALLER/TECHNICIAN FUNDAMENTALS.
Oklahoma Uniform Building Code Commission IRC Building Subcommittee Presentation to Commission November 17, 2010.
INSTALLATION INSTRUCTIONS FOR GERARD METAL SHINGLES
Chapter 20 Roof Plan Components.
EDT Cabin Design Project - Roofs1 Weekend Cabin Retreat Project Roofs Sacramento City College EDT 300 Kenneth Fitzpatrick, P.E.
Chapter 20 Roof Plan Components.
© 2006 ITT Educational Services Inc. CD230 Architectural Design & Drafting: Unit 1 Slide 1 Unit 1 CADD Part III.
Competency: Draw roof plans
Residential Roofing Systems
Wall and Ceiling Construction Vocabulary
Protection From the Weather
Chapter 22 Roof Plan Components.
Chapter 23 Plumbing Systems. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Identify several.
CON 4003 Construction Estimating Prof R. V. Locurcio.
Common Components of a Traditional Wood Framed Building
State of Virginia’s Adoption Uniform Statewide Building Code –Adopts model codes by reference Family of I Codes 2003 edition NEC 2002 edition –Statewide.
ET 201 – Architectural Drafting Dr. Dan Trent September 28, 2015
Chapter 28 Structural Components of Framed Construction.
Residential Roof Types
Fire Resistance Rated Truss Assemblies Educational Overview.
ARMA Spring Committees Steep-Slope Committee March 25, 2009 Codes Steering Group Report Aaron R. Phillips, CSG Chair Staff: Michael Fischer ARMA Consultant:
Roof types. Roofs are part of the external envelope that spans the building at high level. They also have structural, weathering and insulation functions.
Unit 6: Building Technology in Construction Learning Outcome Understand the techniques used in the construction of superstructures for low-rise domestic.
Steep Slope Roofing Systems. Based on the 2007 C.B.C. Presented by Oscar Davalos.
APPLICATIONS OF TECHNOLOGY
Common Components of a Traditional Wood Framed Building
Warm-up 9/20/16 What is the underlayment called below the shingles?
Common Components of a Traditional Wood Framed Building
OBJ: SWBAT create a CAD Rendering of a Utility shed.
APPLICATIONS OF TECHNOLOGY
Competency: Draw roof plans
FRT Lumber Use in Type III-A Buildings
The Elastizell Advantage For Quality Low Density
Competency: Draw Wall Sections
Commercial Roof Systems
Competency: Draw roof plans
Commercial Roof Systems
Warm-up 9/19/16 What template are we using?
Educational Overview Revised 6/13/2017
Common Components of a Traditional Wood Framed Building
II REVIEW.
Commercial Roof Systems
Water-Resistive Barriers: Assuring Consistent Assembly Water Penetration Resistance Educational Overview Revised August 31, 2018.
Common Components of a Traditional Wood Framed Building
Competency: Draw roof plans
Competency: Draw roof plans
Competency: Draw Wall Sections
Common Components of a Traditional Wood Framed Building
© OnCourse Learning.
Common Components of a Traditional Wood Framed Building
Presentation transcript:

Florida Building Code Update ARMA Summer 2005 Committee Meetings August 22 – 25, 2005 Toronto, Canada

2004 Florida Building Codes Effective date: October 1, 2005 2004 Florida Building Code 2004 Florida Building Code, Residential (New volume) 2004 Florida Existing Building Code (New code) Effective date of the 2004 Florida codes is set for October 1, 2005. Although there are rumors of a delay to January, the October date was set by the Florida Legislature. Any delay would be the result of an injunction – a challenge to the Rulemaking procedures used to adopt the 2004 versions.

Important Info All 2004 Florida Codes are based on the 2003 versions of the corresponding International code. Except: ASCE 7-98 is the reference standard for wind loads Many “glitches” have been found to date, especially in the Residential Code Process to correct these is expected to be addressed at this week’s Florida Building Commission meeting On the first bullet, the Commission did not have the authority to update the ASCE 7 standard. All of the Florida-specific modifications were supposed to be carried over into the Code, in many cases this has not occurred. For example, the protection against decay and termites is missing; a code modification allowing “L” flashing was not included although it is in the Building code volume. The Commission is expected to outline a process on fixing the errors and omissions.

Expedited Amendments The Legislature directed the Commission to adopt amendments related to the 2004 hurricane investigations on an expedited basis. The Process: Language enacting these amendments will be developed at this week’s Commission meeting The amendments will be finalized at the October Commission meeting The amendments will take effect November 1, 2005

Expedited Amendments: Sealed Attics Provide an option in the Code for “ventless” attics Language is proposed to be based on the IRC model I intend to add the use of ventilated nail base (polyiso, spacers, OSB or plywood) as an alternate. The ventless attic concept was promoted by Icynene – hired a Florida lobbyist who inserted this language. It was characterized as a step to prevent moisture intrusion – because many soffits failed and wind driven rain entered the attic and caused extensive interior damage.

Proposed “ventless” attic language R806.4 Conditioned attic assemblies: Unvented conditioned attic assemblies (spaces between the ceiling joists of the top story and the roof rafters) are permitted under the following conditions: 1. No interior vapor retarders are installed on the ceiling side (attic floor) of the unvented attic assembly. 2. An air-impermeable insulation is applied in direct contact to the underside/interior of the structural roof deck. “Air impermeable” shall be defined by ASTM E 283. 3. Shingles shall be installed as follows: a. For asphalt roofing shingles: A 1-perm (57.4 mg/s . m2.Pa) or less vapor retarder (determined using Procedure B of ASTM E 96) is placed to the exterior of the structural roof deck; i.e. just above the roof structural sheathing. b. For wood shingles and shakes: a minimum continuous ¼ inch (6 mm) vented air space separates the shingles/shakes and the roofing felt placed over the structural sheathing. The ventless attic concept was promoted by Icynene – hired a Florida lobbyist who inserted this language. It was characterized as a step to prevent moisture intrusion – because many soffits failed and wind driven rain entered the attic and caused extensive interior damage.

Expedited Amendments: Tile Require wood, metal or other structural support “ridge board” for tile attachment methods 1, 2 and 4A.of the FRSA Tile Manual. Require FBC approved pre-bagged mortar to attach hip and ridge tiles attachment methods 3 and 4B Prohibit component substitution without proper laboratory testing and FBC Product Approval Allow hip and ridge attachment systems with demonstrated performance equal or superior to that required by the identified systems. These were recommended by FRSA in response to the “Spanish missiles” - tile flying off the roof in Hurricane Charlie and causing significant wind borne debris damage.

Expedited Amendments: FEMA Require compliance with ANSI/SPRI ES-1 for edge flashings and copings. Require compliance with ASTM E-1592 for testing the uplift resistance of metal panel roof systems. (Note: Require ASTM E – 1592 for structural metal panel roof systems and UL 580 for non-structural metal panel roof systems) These were recommended by FEMA for better roof performance.

Expedited Amendments: FEMA Require asphalt shingles to comply with UL 2390. Require removal of existing roof covering down to the deck and replacement of deteriorated sheathing in areas where basic wind speed is 110mph or greater. If existing sheathing attachment does not comply with loads derived from Chapter 16, require installation of additional fasteners to meet the loads. These were recommended by FEMA for better roof performance. FEMA has confidence in UL 2390! The prohibition against installing the “second layer” is causing a great deal of discussion. It is unclear if this is for steep slope only, what percentage of the roof has to be damaged before this section would be triggered, who will determine the structural condition of the roof deck, etc.

Commission Action Lorraine Ross will send a report by the end of this week on Commission decisions. Phone: 727-510-1941 Email: intech@tampabay.rr.com

Chapter 15 Roof Assemblies Rooftop Structures

2004 FBC Chapter 15: Significantly Re-Formatted §1501 General Requirements Scope §1502 Definitions §1503 Weather Protection §1504 Performance Requirements Wind resistance Physical Properties – UV §1505 Fire Classification §1506 Materials §1507 Requirements for Roof Coverings This was steep slope requirements in 2001 FBC §1508 Roof Insulation This was low slope requirements in 2001 FBC §1509 Rooftop Structures §1510 Reroofing

1503.2 Flashing 1503.2.1 Locations. Flashing shall be installed at wall and roof intersections, at gutters, wherever there is a change in roof slope or direction, this requirement does not apply to hip and ridge junctions and around roof openings. Where flashing is of metal, the metal shall be corrosion resistant with a thickness not less than provided in Table 1503.2.2. Section 1503.2.1

§ 1503 Weather Protection: TABLE 1503.2.2 Metal Flashing Material Min Thickness (inches) Gage Weight (lbs per sq. ft.) Copper 1 (16 oz) Aluminum 0.024 Stainless Steel 28 Galvanized steel 0.0179 26 (zinc coated G90) Aluminum Zinc Coated Steel Zinc Alloy 0.027 Lead 2.5 Painted Terne 1.25 1.25 (20 oz.)

§ 1503.3 Coping 1503.3 Coping. Parapet walls shall be properly coped or sealed with noncombustible, weatherproof materials of a width no less than the thickness of the parapet wall.

Roof Drainage: Scuppers The scupper locations in 2004 FBC have been separated into two sections: Where required for roof drainage, scuppers to be placed in a wall or parapet at the roof surface level Overflow scuppers location Section 1503.4.2

§1503.4.2 Scupper for Roof Drainage 1503.4.2 Scupper. Where required for roof drainage, a scupper shall be placed level with the roof surface in a wall or parapet. The scupper shall be located as determined by the slope and the contributing area of the roof. The exterior facing or lining of a scupper, if metal, shall be the same as flashing material required by 1503 through 1510 for the particular type of covering specified for the building. For other type materials, follow manufacturer’s specifications.

§1503.4.3 Overflow Scuppers 1503.4.3 When other means of drainage of overflow water is not provided, overflow scuppers shall be placed in walls or parapets not less than 2 inches (51 mm) nor more than 4 inches (102 mm) above the finished roof covering and shall be located as close as practical to required vertical leaders or downspouts or wall and parapet scuppers. An overflow scupper shall be sized in accordance with the Florida Building Code, Plumbing.

§1503.5 Roof Ventilation – New Section 1503.5 Roof ventilation. Intake and exhaust vents shall be provided in accordance with Section 1203.2 and the manufacturer’s installation instructions. Note: This is not marked as a new section in Chapter 15. SB 442 directs Commission to adopt option for “ventless” attics by November 1, 2005.

Wind Resistance of Asphalt Shingles 1504.1.1 Wind resistance of asphalt shingles. Asphalt shingles shall be designed for wind speeds in accordance with Section 1507.2.7. this is the attachment section that refers to number of nails per each shingle Section 1504.1.1

Fasteners – This section was deleted in the 2004 FBC – folded into specific roof covering section Provides uniform requirements for corrosion resistance of roofing fasteners Nails (s.1506.5.1) Wood screws (s.1506.5.2) Clips (s.1506.5.3)

Section 1507 Requirements for Roof Coverings

Florida Building Code §1507.2 Asphalt Shingles Section 1507.2

Note: Table 1507.2 This table attempts to summarize asphalt shingle requirements. There are some conflicts with the text – notably in attachment portion of the table. Rely on text Table 1507.2

Asphalt Shingles: Underlayments #15 (ASTM D 226 Type I or Type II ) #15 (Organic Felt ASTM D 4869 Type I or Type II) 1507.2.4 Self-adhering polymer modified bitumen sheet – ASTM D 1970 Section 1507.2.3 & 1507.2.4

Asphalt Shingles: Fasteners ASTM F 1667 (corrosion resistance) Galvanized, stainless steel, aluminum or copper roofing nails Minimum 12 gauge (.015 inch) shank, minimum 3/8” diameter head Penetration: ¾” into roof sheathing; if sheathing is less than ¾”, nails shall penetrate through the sheathing Section 1507.2.6

§1507.2 Asphalt Shingles - Fasteners New section addressing plastic cap nails: 1507.2.6.1 The nail component of plastic cap nails shall meet the corrosion resistance requirements of 1507.2.6.

§1507.2.8 Underlayment Application Number of layers depends on roof slope Fastened sufficiently to remain in place Note new section –not marked as such: §1507.2.8.1 High wind attachment 110 mph or greater (most of FL) Corrosion resistant fasteners At overlap: maximum spacing of 36” o.c.

Asphalt Shingles – Flashing 1507.2.9.1 Base and counter flashing. Base and counter flashing shall be installed as follows: 1. In accordance with manufacturer’s installation instructions, or 2. A continuous metal “L” flashing shall be set in approved flashing cement and set flush to base of wall and over the underlayment. Both horizontal and vertical metal flanges shall be fastened 6 inches on center with approved fasteners. All laps shall be a minimum of 4 inches fully sealed in approved flashing cement. Flashing shall start at the lower portion of roof to insure water-shedding capabilities of all metal laps. The entire edge of the horizontal flange shall be sealed covering all nail penetrations with approved flashing cement and membrane. Shingles will overlap the horizontal flange and shall be set in approved flashing cement.

Metal Flashing Step flashing OR “L” flashing with proper installation and sealing is acceptable NRCA Roofing and Waterproofing Manual, 5th Edition

§1507.2.9 Asphalt Shingles – Flashing (cont.) 1507.2.9.1 Base and counter flashing. Base and counter flashing shall be installed as follows: Base flashing shall be of either corrosion resistant metal with a minimum thickness provided in section 1503.2.2 or mineral surface roll roofing weighing a minimum of 77 lb per 100 sq ft (3.76 kg/m2). Counter flashing shall be corrosion resistant metal with a minimum thickness provided in Table 1503.2.2.

§1507 Asphalt Shingles – Drip Edge 1507.2.9.3 Drip edge. Provide drip edge at eaves and gables of shingle roofs. Overlap to be a minimum of 2 inches (51 mm). Eave drip edges shall extend 0.25 inch (6.4 mm) below sheathing and extend back on the roof a minimum of 2 inches (51 mm). Drip edge shall be mechanically fastened a maximum of 12 inches (305 mm) o.c. Drip edge at eaves shall be permitted to be installed either over or under the underlayment. If installed over the underlayment, there shall be a minimum 2 inch width of roof cement installed over the drip edge flange.

Underlayment – Single Layer (Slopes 4:12 and greater) Drip edge can be applied under or over underlayment NRCA Roofing and Waterproofing Manual, 5th Edition

Underlayment – Double Layer (slope 2:12 up to 4:12) Drip edge can be applied under or over underlayment NRCA Roofing and Waterproofing Manual, 5th Edition

§1507 Asphalt Shingles – Crickets or Saddles – this is marked new but it isn’t 1507.2.9.10 Crickets or Saddles. Crickets or saddles shall be installed on the ridge side of any chimney greater than 30 inches (762 mm) wide. Cricket or saddle coverings shall be sheet metal or of the same material as the roof covering.

§1510 Reroofing

Reroofing: Recovering vs Replacement 1510.3 Recovering versus replacement. New roof coverings shall not be installed without first removing all existing roof coverings where any of the following conditions occur: Water soaked or deteriorated surface Wood shake, slate, clay, cement or asbestos cement tile Two or more applications of any type of roof materials When blisters exist in any roofing, unless blisters are cut or scraped open and remaining materials secured down before applying additional roofing. Exceptions on next page

Reroofing: Recovering vs Replacement 1510.3 Recovering versus replacement. New roof coverings shall not be installed without first removing all existing roof coverings where any of the following conditions occur: Exceptions 1. Complete and separate roofing systems, such as standing-seam metal roof systems, that are designed to transmit the roof loads directly to the building’s structural system and that do not rely on existing roofs and roof coverings for support, shall not require the removal of existing roof coverings. 2. Metal panel, metal shingle, and concrete and clay tile roof coverings shall be permitted to be installed over existing wood shake roofs when applied in accordance with Section 1510.4.

2004 Florida Building Code, Residential Chapter 9 in Residential Code mirrors Florida Building Code Chapter 15 -

§ 101.2 Scope R101.2 Scope. The provisions of the Florida Building Code, Residential shall apply to the construction, alteration, movement, enlargement, replacement, repair, equipment, use and occupancy, location, removal and demolition of detached one and two-family dwellings and multiple single-family dwellings (townhouses) not more than three stories in height with a separate means of egress and their accessory structures. Exception: Existing buildings undergoing repair, alteration or additions, and change of occupancy shall be permitted to comply with the Florida Existing Building Code. R101.2.1 “The provisions of Chapter 1, Florida Building Code, Building shall govern the administration and enforcement of the Florida Residential Code for One-and Two-Family Dwellings”.