Mo morning set up 228 bunch injection (36 bunch trains), ramp, squeeze, collisions h luminosity (depending on experiments) ATLAS length scale calibration.
Advertisements

LHC Status Sat Morning 18-June Bernhard Holzer, Gianluigi Arduini et al Tentative Planning: Luminosity 1092 x 1092 Access: installing low pass filter at.
Thursday 21/4 07:30: End of fill #1727. Beam dumped. ALICE compensator magnet fault. Delivered ~6.7 pb -1 in 7.5 h. 11:30 Stable beam # bunches/beam.
Saturday 25/11/10 & Night 12:24 Dump fill #1523 after more than 8 hours in physics It takes some time to get back:  Parallel sequences: Fewer clicks to.
LHC Status Mo Morning 20-June Bernhard Holzer, Gianluigi Arduini et al 7 runs The Week.
LHC 8:30 meetingEBH 11 Thursday 24 November 2011.
LHC Status Sat Morning 30-June Bernhard Holzer, Jan Uythoven Status Friday Late: preparing restart some issues... LHCb dipole tripped / router problem.
LHC Status Tue Morning 22-Aug
Wednesday :06 Dump fill 3533: interlock BPMS in IP6
Machine Coordinators: G. Arduini, J. Wenninger
Monday :00 Stable beams 9_6_6_6 13:40 Access.
Friday 07:00 Power glitch on the EDF network. Point 8 affected.
LHC Status Wed Morning 13-April R. Assmann, B. Holzer et al
LHC summary week 32 Coordination: Mike Lamont & Jan Uythoven
Week 46 Week 46: Machine coordinators: Roger Bailey – Gianluigi Arduini Main aims of the week: Stable beams with ions Scheduled stop for ion source refill.
Fill 1410 revisited Peak luminosity 1.4e32 Beam current 2.68/2.65 e13
LHC Morning Meeting - G. Arduini
Monday 6th August & night
Summary of Week 11: 14 – 21 March
LHC Status Su Morning 17-April R. Assmann, B. Holzer et al
Thursday 17th May 01:11 Fill #2633 dump in squeeze arc circulator load channel Ad1B 03:16 Fill #2644 Stable beams, lumi 5.2e33 cm-2s-1 04:38 Dumped by.
LHC Morning Meeting - G. Arduini
Friday 31st August & night
Wednesday 8th August & night
LHC Status Sun Morning 20-Mai
LHC Morning Meeting - G. Arduini
Friday Morning 3:44 – 15:04 stable beams Fill (dumped by operator)
Summary of Week 26 Main aims: G. Arduini, B. Holzer, M. Lamont
Tuesday 28th September Fill 1375 ongoing 09:00 Move in Roman Pots
Friday :00 machine setup for luminosity run. Better b-to-b stability from injectors. 01:58 stable run with 228 bunches 11:00 luminosity leveling.
Saturday – Morning 7:36 beams dumped
Finally.... We had to wait a long time.... We had many problems....
Friday Morning 7:30 injection for fill 2908
Summary Thursday h21: Stable beams fill #1303.
Sunday/Monday & :30 Stable beams. Fill #1851.
Rocky last 24 hours Losses Q6.R5 Orbit SIS TCDQ OK! Power converters
MD#2 News & Plan Tue – Wed (19. – 20.6.)
Friday 25 bunch fill dumped just before (BLM in 5)
Thursday 04/11 - Morning Access until ~13:00 Pre-cycle Proton checks:
Saturday 3rd November - morning
Saturday Nov Stop proton operation. Switch back to ions
Thursday 26th July 13:21 Fill 2880 beam dumped
Friday 07:00 Fill 1729 dumped. Movement device allowed flag switching to FALSE. From the logs, it seems the energy went to FFFF/7860 GeV. To be confirmed.
Fill 1743 Peak luminosity ~6.7 e32 Integratated lumi ~20 pb-1
Monday 6th 07:39 Dump fill #1854, RQ6.L2 tripped, followed by access
Monday morning 09:40 Dump fill 2838, integrated ~130 pb-1.
LHC Status Tue Morning 22-Aug
Thursday 22 September 2011.
Summary for LPC (March 7th, Ralph Assmann)
Saturday :42 stable beams fill 3541
Monday Fill 1803 into stable beams at 9:30. Dump at 19:45.
LHC Morning Meeting - G. Arduini
LHC Status Fro Morning 9-Sep
Saturday 06/11 Triplet R8 tripped during ramp for collision setup.
Wednesday h18: 228b fill lost just before start of ramp.
Monday 26th September 7:30 Beam dump, QSP on RQX.R1, lost cryo in ITR1, 91 pb-1. Cryo recovery, needed about 1.5 h. Setting of TI2 collimators to 5 sigma.
Friday h55 Stable beams. Fill #1841. Lumi ~1.2e33.
Another Immortal Fill….
Tuesday 24/5 Fill # :00 Stable beam fill # bunches
Monday 27th August & night
Wednesday 26 October 2011.
Thu :00 Dumped beams, refill for Pb-Pb physics. No more protons in 2011… Some changes: Increase of flat top total voltage to 14 MV. Feed-forward.
Wednesday morning / afternoon
Monday 14th May 00:03UFO at BLMQI.06R8.B2E10_MQML. Beam dump Re-steering required for TI2 03:28 STABLE BEAMS # e11 ppb, 4.11e33 cm-2s-1 13:36.
Saturday 28th 08:17 Fill #1812: Stable beams, peak luminosity ~1.1x1033 cm-2s-1 19:00 Go to adjust for RF-checks; Record fill lumi of 31.7 pb-1 for CMS.
Saturday Luminosity production 1380 bunches
Tuesday End of fill 1393 Movement of suspicious Roman pots OK
LS 1 start date 12th June Schedule Extension 2012 run Extension of 2012 run approved by the DG on 3rd July 2012.
Friday During the night from Thursday to Friday: by mistake, SPS longitudinal blow-up was not active  Smaller transverse emittance from the.
Monday 152 bunch operation summary
Presentation transcript:

LHC Status Fri Morning 3-June Bernhard Holzer, Ralph Assmann et al Tentative Planning Luminosity Goal: Produce > 250 pb-1 in one week (- 9 min)

Wed Night / Thu Morning 00:31h BEAM MODE > Injection Probe Beam 2. June Wed Night / Thu Morning 00:31h BEAM MODE > Injection Probe Beam 02:03h BEAM MODE changed to STABLE BEAMS, Luminosity 15 hours run

Thu morning 05:00h Emittances during the fill ... comme il faut ! 2. June Thu morning 05:00h Emittances during the fill ... comme il faut !

2. June Thu Morning 06:52h UFO at ~50%!

Thu Morning 10:04h Bunch length observations: Blow-Up during ramp: 2. June 10:04h Bunch length observations: Blow-Up during ramp: end-up with 1.12 ns B1 and 1.15 ns B2 Bunch lengthening during Physics: ~8 ps/hour OK 1.2 ns 1.15 ns

Thu Morning For the fun of it ... 15:00 h Shift Summary 2. June For the fun of it ... 15:00 h Shift Summary Did few orbit corrections (mostly to follow the tides) and lumi scans.

Thu Late 17:00 h integrated Luminosity in this run: 46 pb -1 2. June Shift Summary: Dumped fill 1837 after about 15 h of stable beams......and should not have dumped it.

Thu Late 17:50 h INJECTION PHYSICS BEAM 2. June 17:50 h INJECTION PHYSICS BEAM ... a bit problematic this time bad orbit in the LHC find negative chroma at start injection. 2mm --- -2mm ---

Thu Late 2. June 18:50 h We lost all of a sudden lots on a couple of bunches... dump & refill 19:50 h ...we are again blown up - beam 2 V beam 2 h beam 1 h beam 1 v beam 2 v dump & refill

Thu Late 21:06 h new injection, ramp, squeeze, 21:40 h luminosity 2. June 21:06 h new injection, ramp, squeeze, 21:40 h luminosity bunch emittances ok now 21:46 h Dump: LHCb triggered. We detected a UFO in the triplet before the dump time. Length of lumi fill = 4 minutes

Thu Night 23:06 h new injection, ramp, squeeze, ... 2.-3. June 23:06 h new injection, ramp, squeeze, ... 00:28 h QPS trigger RQTF.A23B2, dump could it be a problem of u_RES passing the threshold. To be confirmed... 01:17 h ...no beam from booster 04:05 h new injection nicely distributed bunch intensities 05:55 h lumi

Thu Night / Fri Morning last 24 hours: 2-3.. June Beam size evolution (as given by BSRT w/o correction) last 24 hours: scheduled dump dump: ufo lumi beam losses at injection dump: qps