Thank you for your interest in our company! Founded as a small commissioning company, today COTES is one of the leading Russian engineering groups in the power industry. We have combined long-term experience in mastering the largest domestic thermal power plants and designing large modern power units based on state-of-the-art equipment, using high-efficiency, environmentally friendly solutions and high- performance technologies for the combustion of different fuels. In close cooperation with one of the key manufacturers of power- generating equipment — the Machine Building Factory of Podolsk, as well as industry research institutes and academic institutions, COTES has competences to promptly and effectively investigate and apply both manufacturers’ and in-house engineering innovations which contribute to the reliability, environmental performance and cost efficiency of modern power plants. The wisdom and experience of the older generation combined with the energy and ambition of young engineers ensures the constant development and, hence, the future of COTES. And I believe that, for many years to come, our fair partners and new customers will gratefully note our high skills, effectiveness and the engineering level of all the services provided by our team. Founder of COTES, Doctor of Science (Engineering), Laureate of the Russian Federation Government Prize in Science and Technology Feliks A. Serant
COTES Competences
COTES Key Production Departments
History
History
COTES in Figures and Facts
Global Reach COTES’ business map includes about 25 countries. The quality of the design and commissioning services of COTES has been highly appreciated both in Russia and in such countries as Bulgaria, Poland, Serbia, Bosnia and Herzegovina, Estonia, Macedonia, China, Mongolia, Kyrgyzstan, Kazakhstan, Vietnam, Turkey, India, Cuba, Guinea, Morocco, etc.
Innovations The company logo is a new design coal-fired boiler with a circular furnace developed for large power units by the team of engineers under leadership of Feliks Serant, Adviser for New Technologies in COTES. In April 2015, at InterRAO Scientific and Technical Council the boiler design was recommended for consideration to all coal-fired power plants under construction and upgrade. The circular furnace enables our clients to: Reduce boiler height (by 30-40%); Ensure slag-free cost efficient combustion of decker coals; Reduce NOx emissions through more intensive mixture formation and in-furnace gas circulation; Facilitate design of boiler building and supporting structures through the installation of a large central pylon inside the inner shaft. F.A. Serant, Adviser for New Technologies, COTES
Large On-Going Projects Client: ООО Kaliningrad Generation Project: Construction project for the Primorskaya TPP (Kaliningrad region) for 150-195 MW(e) Type of work: Design and site investigation Period: 2015-2017 Client: Fortum Project: Development of design for the construction of power units Nos.1,2,3 CCPP-247.5 MW at the Chelyabinskaya GRES Type of work: Design and site investigation Period: 2011-2017 Source: www.ieport.ru
Large On-Going Projects Client: ООО Kaskad-Energo Project: Development of detailed design for CCGT at Zatonskaya CHP 440 MW (Ufa) Type of work: Design and site investigation Period: 2012-2017 Client: POYRY Finland Oy Project: Owner Engineer Consulting Services for the Management of the new 2 x 300 MW(e) Oil Shale Fired CFB Thermal Power Plant Project in Narva, Estonia Type of work: Owner’s Engineer Period: 2014-2017
Large On-Going Projects Client: PAO Unipro Project: Rehabilitation of power unit 3 of the Berezovskaya power plant, putting online fuel receiving station and pumping foam station Type of work: design and commissioning Period: 2016-2017 Client: OOO Sibirenergoengineering Project: Commissioning of equipment for gas facilities and fuel handling facilities for the power unit of CCPP-425 No.12 of the Verkhnetagilskaya power plant Period: 2015-2017
Completed Projects Client : PAO T Plus Project: Development of design and estimate documentation for the rehabilitation of apron of the concrete dam of the Penzenskaya CHP-1 plant Period: 2015-2016 Client: SAMSUNG C&T CORPORATION Project: Adaptation of Detailed Design for it to comply with the technical codes and standards of the Republic of Kazakhstan for 1320 MW Balkhash TPP project Type of work: design and site investigation Period: 2015-2020
Completed Projects Client: Novosibirsk HPP, a branch of OAO RusHydro Project: Development of the design for construction of the administrative building at Novosibirsk hydro power plant Type of work: Commissioning Period: 2014-2016 Client : China Machinery Engineering Corporation Project: Commissioning of mechanical equipment of turbine No.6 and boiler No.8 at the Karagandinskaya CHP-3 plant owned by TOO Karaganda Energocentr Type of work: Commissioning Period: 2014-2016
Completed Projects Client: SDEPCI Project: Pre-feasibility study of different construction options for 8 GW Erkovetskaya TPP Type of work: Design and site investigation Period: 2013-2014 Client: Verkhne-Volzhskaya Generating Company Project: Development of basic and detail design for two combined-cycle cogeneration plants, 450 MW each, in Nizhny Novgorod Type of work: Design and site investigation Period: 2012-2016
Completed Projects Client: First Energy Company Project: Development of the pre-feasibility study for greenfield construction of Rubtsovskaya CHP plant 200-450 MW Type of work: design and site investigation Period: 2015 Источник: www.ieport.ru Client: E.ON Engineering (Unipro Engineering) Project: Commissioning of turbine equipment for 800 MW unit No. 3 at Berezovskaya GRES Type of work: Commissioning and start-up Period: 2013-2015 Source: www.eon-russia.ru
Completed Projects Client: RAO ES of East Project : Development of basic design and detailed design documentation for the 2-nd 110 MW stage of the Blagoveshchenskaya CHP plant Type of work: Design and site investigation Period: 2011-2015 Client: RAO ES of East Project: A complex of FEED activities for Construction of Ussuriyskaya CHP plant project Type of work: Design and site investigation Period: 2012-2015
Completed Projects Client: ООО Bashkir Generating Company Project: Installation of Continuous Emission Monitoring System (CEMS) on the discharge flue gas ducts of steam boilers at the Karmanovskaya GRES Period: 2015-2016 Client : ООО Kaskad-Energo Project: Design and engineering for foundations with vibration control for turbine units and supply of equipment (GERB vibration control systems) for Combined-Cycle Cogeneration Plant-5 in Ufa Period: 2015
Completed Projects Client: Samruk-Energo, Inter RAO Client: Kazakhmys Corporation Project: Development of a retrofit project for a 500 MW power unit No.8; development of a rehabilitation project for a 500 MW power unit No.2; Design works for upgrading of 500 kV outdoor switchgear at Ekibastuzskaya GRES-1 Type of work: Design and site investigation Period: 2010-2015 Source: www.gres1-ekibastuz.kz Client: Samruk-Energo, Inter RAO Project: Expansion and retrofit project for Ekibastuzskaya GRES-2 through construction of a 636 MW power unit No.3 Type of work: Design and site investigation Period: 2010-2013 Source: www. thenews.kz
Cutting Edge IT-solutions To implement all engineering activities — from design to commissioning— COTES applies the most up-to-date internationally recognized software and equipment. Software for 3D PDMS by AVEVA allows us to dramatically cut the time needed for drawing development, calculations, and enhance documentation quality avoiding errors and collisions. In 2015, COTES representative took the first prize in AVEVA MAGISTER competition. The competitions is aimed to find the most advanced user of the software. E3.Series allows us to decrease period required for development and issue of drawing packages for electric and automation; it ensures possibility for user groups to work simultaneously on a real-time basis. ElectriCS 3D is used for automated (automatic and interactive) routing the cables of different types during design, rehabilitation and maintenance of buildings, structures, and open areas. Software for project management enables management of design activities, online control and monitoring of business processes, and creating of project reporting system.
Commissioning Equipment COTES possesses a complete fleet of the required equipment and measuring tools for equipment testing and instrument inspection: pressure transmitters; pressure difference transmitters; resistance temperature detectors; gas analyzers, micropressure gauges, pyrometers, temperature transducers, etc. A special measuring system (mibile DCS) for thermal testing of equipment was designed and constructed upon our request; using this system the engineers are able to monitor and record over 130 parameters every second.
Engineering Company C&S is a joint Russian-Chinese venture set up by two large engineering companies from Russia and China: COTES and SDEPCI. By combining the expertise and competences of the two companies, C&S is able to offer its clients high professional and technical level of services, international experience and expert knowledge of characteristics of both Russian and Chinese equipment and power systems, application of new high-performance environmentally friendly innovations while strictly observing relevant national regulations and standards. The expertise and competences of a joint team is the key to successful implementation of integrated projects for turn-key construction of energy facilities under EPC and EPCM contracts.