Meeting Standards and Expectations in the Water Industry

Slides:



Advertisements
Similar presentations
1 Water Services Training Group 16 th Annual Conference Water Sector Reform Programme Implementation INEC, Killarney, 8 th November 2012.
Advertisements

UK WIR The UK Experience Christopher Royce Anglian Water Services.
Shaping the Future of Water Services
The Impact of Economic Regulation Cathy Mannion Director Water Commission for Energy Regulation Local Authority Services National Training Group Conference.
Shaping the Future of Water Services Annual Service Plans – Addressing risks in the short-term Mr. Gerry Duane Operational Planning and Control Centre.
1 Water Services Training Group 17 th Annual Conference Creating a new Irish Water Industry INEC, Killarney, 5 th September 2013.
National Investment in Water and Waste Water Infrastructure, Funding & Pricing Mid-West Regional Authority Annual Conference 2009.
New Decade - New Challenges Annual Conference September 2010 Water Services Training Group 14 th Annual Conference New Decade – New Challenges 9 th September.
1 Burns Beach near Brighton, Western Australia RPS has won a series of awards from the Urban Development Institute of Australia - including the Water Sensitive.
1 EPA Advice Note on Water Safety Plans in Ireland Derval Devaney EPA 28/29 February 2012.
1 Water Services Training Group 19 th Annual Conference Optimising Services Delivery in the Water Industry Radisson Blue Hotel Sligo, 3 rd. September 2015.
Dominique Poulin Environmental Health First Nations and Inuit Health Branch Health Canada Health Canada’s Implementation of the Drinking Water Safety Program:
Audit Advisory Committee Public health transition update 22 January 2013.
Private & Confidential1 (SIA) 13 Enterprise Risk Management The Standard should be read in the conjunction with the "Preface to the Standards on Internal.
1 Water Services Training Group 17 th Annual Conference Creating a new Irish Water Industry INEC, Killarney, 5 th September 2013.
Chemistry making a world of difference Responsible Care ® - Thrusts in Europe Dr Richard Robson Cefic Director APRCC, Manila, Philippines 17 th November.
MORRIS MILL PROPOSED URBAN SERVICES DISTRICT Presentation to County Council September 17, 2013.
Annual Conference October 2011 Water Services Training Group 15 th Annual Conference Water Services in Ireland – Organisational modernisation and new challenges.
FLOOD RISK MANAGEMENT The next steps. The National Technical Advisory Group On Flooding Issues An Overview and the Future.
Dublin City Council Environment SPC: Lead Briefing 24 th June 2015.
Meeting the Challenges of the Changed Economic Environment Annual Conference September 2009 Water Services Training Group 13 th Annual Conference 10 th.
RER/9/111: Establishing a Sustainable National Regulatory Infrastructure for Nuclear and Radiation Safety TCEU School of Drafting Regulations November.
1 AGRICULTURAL POLLUTION REDUCTION ACTIVITY Financed by USAID APRA ROMANIA PROJECT Project implemented by: Assistance project for MAFWE International Resources.
1 Water Services Training Group 20 th Annual Conference Meeting Standards and Expectations in the Water Industry Lyrath Estate Hotel, Kilkenny.
Asset Degradation Modelling at Townsville Water
Local buffer support Program
EPA Role in Lead Strategy
John Hynes Capital Programmes Manager 28th February 2017
Meeting Standards and Expectations in the Water Industry
Meeting Standards and Expectations in the Water Industry
The National Lead Strategy - an overview
Environmental Services Training Group
Prioritising Capital Investment Achieving a Balance
Safeguarding Drinking Water Supplies Environmental Protection Agency
Economic Regulation of Irish Water
ISO 14001: 2004 Environmental Management Review Presentation
Progressing a Single Water Utility Approach
Lead and Copper Rule (LCR)
Fair Go Rates System Dr Ron Ben-David Chairperson
Developments in our water sector policy
Danube Water Conference, Vienna, May 2017
Meeting Standards and Expectations in the Water Industry
Climate Change & Health
Water Services Training Group
Irish Water’s Revised Business Plan and Capital Outlook
INAC Water and Wastewater: Discussion on Current Policies and Processes Presented at: Circuit Rider Trainer Professional Association’s Annual General Meeting.
Delivering Capital Investment to meet Priority Objectives
Business environment in the EU Prepared by Dr. Endre Domonkos (PhD)
9/16/2018 The ACT Government’s commitment to Performance and Accountability – the role of Evaluation Presentation to the Canberra Evaluation Forum Thursday,
Challenges in a Changing World
Economic Regulation of Irish Water
Outcross Resources - Services Overview
Outcome TFCS-11// February Washington DC
Kentucky Lead Workgroup Recommendations
CP3 GP6 Regional Planning Guidelines PP3 – Mid-West Regional Authority
Communication and Consultation with Interested Parties by the RB
Local buffer support Program
IS&T Project Reviews September 9, 2004.
Sustainability Plan 2015 Summary RAG Report
Fair Go Rates System Dr Ron Ben-David Chairperson
Slaughden SMP Policy Review
Briefing to the Portfolio Committee on Water and Sanitation on the
Considerations in Development of the SBSTA Five Year Programme of Work on Adaptation Thank Mr. Chairman. Canada appreciates this opportunity to share.
ISO management systems
Key Value Indicators (KVIs)
Portfolio, Programme and Project
A Blueprint to safeguard Europe’s Water Resources
Creating a new Irish Water Industry
Challenges in a Changing World
Assessment of Member States‘ 2nd River Basin Management Plans
Presentation transcript:

Meeting Standards and Expectations in the Water Industry Responding to Regulation & Key Public Health Challenges (BWNs, Lead, THMs) Elizabeth Arnett, Head of Corporate Affairs & Environmental Regulation, Irish Water John Hynes, Project Manager – National Lead Strategy, Irish Water

Water Services Strategic Plan

Compliance – From a distance 973 water supply zones 2000 abstractions 99.9% microbiological compliance 99.4% chemical compliance

Compliance – Close Up! 400 Open Files 117 schemes on the RAL serving over 800,000 people Almost 80,000 Boil Water Notices in place today 180,000 households with lead services/plumbing New emerging challenges

External Advisory Body Public Water Forum Expert Commission

Drinking Water - The IW Approach Risk Based: WHO Drinking Water Safety Plan assesses risk for Catchment (WFD, abstraction) Raw Water Treatment (THM, Crypto) Distribution (Leakage, Lead, THM) Customer (lead) Management (Telemetry, training, SOP, PM) Key risks to be mitigated through rationalisation, design, investment and management 37% WTP with Inadequate Protozoa barrier 67% - WTP to be assessed or at THM risk 44% - Abstraction/production capacity deficit 12% - Properties with lead risk 49% - Leakage

Risk Based Approach Key risks to be mitigated through rationalisation, design, investment and management 37% WTP with Inadequate Protozoa barrier 67% - WTP to be assessed or at THM risk 44% - Abstraction/production capacity deficit 12% - Properties with lead risk 49% - Leakage

One Team Approach to Achieving Environmental Compliance Longer term infrastructure planning Water Services Strategic Plan 2015-2040 Asset Management Approach Data and performance information driving the decision making Policy-based, with full life cycle cost assessments Operations and Maintenance Practices Standard procedures to operate and maintain assets in the field Modern systems to collect asset, cost and performance data Delivery of Capital Infrastructure Best practice project and construction management Standardised Designs and optimised Procurement approaches

Responding to Challenges Customer expectations Boil Water Notices THMs Lead

Key Objective for Irish Water - Change how people think and act in relation to water… IRISH CITIZEN WATER CONSUMER Citizens need to understand that they are consumers IRISH WATER CUSTOMER Consumers need to appreciate that they are customers 1 2

Irish Water Case Study - Lead in Drinking Water Mitigation Plan Contents Background to the Lead Issue Overview of draft Lead in Drinking Water Mitigation Plan Next Steps in the implementation of the Plan How to identify Lead? Lead is dull grey in colour If you scrape the surface you will see the shiny silver coloured metal beneath

View Video on IW Website Introduction (Public Supplies) 140,000 individual lead service connections; 40,000 common lead (backyard) shared services. View Video on IW Website

Background to the Lead Issue Drinking Water Regulations limit for lead has been lowered to 10 µg/l in December 2013 No safe level of lead in drinking water (WHO/HSE) Key Irish Water Objective: Protection of public health through limiting exposure to lead in drinking water Government’s National Lead Strategy published June 2015 by DoECLG and DoH Responsibilities of water suppliers, public bodies and property owners in relation to exceedances Irish Water published a draft Lead in Drinking Water Mitigation Plan for Public Consultation in July 2016. Consultation Period runs to 21st September 2016 Developed in consultation to DHPCLG, EPA, HSE and other stakeholders

What is Irish Water’s Responsibility? The Drinking Water Regulations specifically state that: the water supplier will not be in breach of its obligations where the non-compliance is due to the domestic distribution system; Nevertheless, Irish Water shall ensure that appropriate measures are taken including advising premises’ owners affected, or other measures such as application of appropriate treatment techniques

Background: Lead Study Dublin City Council conducted a detailed study in Raheny for compliance with lead limit: Key findings: 15 of the 16 properties failing the 10µg/L limit had no public side lead Flushing reduced lead concentrations but did not achieve compliance Conclusion: Both private and public lead services should be replaced at the same time if possible (longer term) Government Grant for householders since February 2016, administered by LAs Irish Water Opt In Lead Service Replacement Scheme Available since July 2015 Corrective Water Treatment required in the short term

Irish Water’s Lead Communications Direct customer communication and advice Where lead has been physically identified through IW metering programme ~ 36,000 to date, and Lead exceedance observed in national lead sampling programme (>36,000 RDT Samples) or regulatory monitoring Integrated media and stakeholder communications Creates/raises awareness and understanding of the impact that lead pipes have on our drinking water Highlights the responsibility on householders to check their own plumbing for lead In summary…. The Irish Water Lead Communications Plan is delivered via a multifaceted approach. In order to communicate to the widest possible audience media channels are leveraged to create awareness and understanding of the impact that lead pipes have on our drinking water, the mitigation measures that Irish Water are implementing to eliminate the risk associated with lead in drinking water and to highlight the responsibility on householders to check their own plumbing for lead. Irish Water have identified elected representatives as important conduits for the dissemination of information to the public and within communities and so are proactively engaged with on the issue of lead in drinking water and proposed Ortho-P treatment when relevant. The Irish Water website acts as a support for Lead communications and is reviewed and developed on an ongoing basis. To maximise the opportunity for the public to be informed and aware of the impact that lead pipes have on our drinking water, Irish Water are utilising a combination of communication channels and tools which are widely accessible to the public and interested parties. The communications channels are as follows: Communications delivered through a multifaceted approach to reach the widest possible audience

Roadmap – Where are we now? June 2015 – present: 36,000 advice letters issued based on data from metering programme. June 2015: Government published a national strategy to reduce exposure to lead in drinking water June 2015: Irish Water published Lead in Drinking Water Mitigation Plan – Issues Paper Sept. 2015 – July 2016: Developing Environmental Assessment Methodology, SEA, NIS in consultation with EPA and other environmental Stakeholders. July 2016: National Lead Monitoring Programme kicks off July – September 2016: 8 week Public Consultation Period on draft Lead Mitigation Plan October 2016 propose to commence OP Treatment in Limerick after Public Consultation and subject to Statutory approvals We are here Customer advice (36,000) (2015 Q2 to date) Government Strategy (2015 Q2) IW Issues Paper& Public Consultation (2015 Q3) CER Engagement (2015 Q4) Develop EAM, SEA, NIS Publish draft Plan, SEA, NIS for Public Consultation (Q3 2016) Kick Off National Lead Monitoring Programme (Q2 2016) Limerick Priority Project (Q4 2016) CER Decision (Q4 2016) Finalisation of Plan & implementation of Measures (Q4 2016)

Background – French Lead Mitigation Plan Overall Lead Strategy of lead pipe and service connection replacement In the past 15 years, 2.7M public lead service connections have been replaced at an estimated cost of €5B. Estimated 1.2M public lead service connections yet to be replaced Replacement of Private Side lead supply pipes by homeowners has been very low Corrective Water Treatment: Basic pH adjustment Orthophosphate has been introduced at small number of plants and French Government has recommended to extend OP treatment to other regions Overview - Despite the significant investment, the compliance level with the lead limit remains unchanged at around 94%

Background– Northern Ireland Water Lead Mitigation Plan Orthophosphate treatment Introduced OP as corrosion inhibitor in 2006 at all 25 Water Treatment Plants (Plant sizes ranging from 0.5 MLD to 160 MLD) Random Daytime Sampling and analysis shows ~98% compliance level with lead limit 25 Year Programme to identify and replace public side lead service pipes Customer opt-in lead pipe replacement scheme available

Draft Lead in Drinking Water Mitigation Plan Options assessed within mitigation plan to achieve compliance and public health benefits e.g. complexity, compliance achieved, cost, delivery time…. pH Adjustment; Point of use filters; Lining of lead services; Lead service replacement; Corrective Water Treatment for the protection of public health. SEA, AA process in parallel with preparation of the Plan…. Factors affecting concentration of lead: Length of lead pipe Temperature – winter vs summer (1:2) pH <7 high, 7-8 moderate Alkalinity <50 mg/l CaCO3(high) Contact time (stagnation) Source: EPA Handbook (2010) Virtually all water is sufficiently plumbosolvent to cause a lead exceedance

Implementation Plan Overview Plumbosolvency Risk Assessment A 1 Treated water quality risk analysis 2 Plumbosolvency Map 3 Prioritisation of WTP Sampling and Monitoring B Customer 4 Inventory Monitoring 5 Operational Monitoring Corrective Water Treatment C 6 Plumbosolvency Control Plan 7 Orthophosphate Treatment Provides a detailed framework of measures to effectively address lead in drinking water on a risk prioritisation basis Two primary elements: Risk Prioritisation – national sampling programme, customer advice, identification & mapping Mitigation Identification and Implementation - lead service replacement programme (longer term) & Corrective Water Treatment for the protection of human health where environmentally viable (short – medium term) Lead Service Replacement D Lead Replacement is the ultimate objective both private and public side need to be replaced at same time (longer term proposal) Replacement plumbing fittings to be of suitable quality 8 Targeted Public Side Service Replacement 9 Private Lead Supply Pipes – Targeted Communications 10 Customer Opt-in Lead Service Replacement

Our Preferred Approach: Treatment & Removal in parallel Public Side Lead Service Replacement, subject to CER approvals 98% lead compliance via orthophosphate treatment by the end of 2021, subject to environmental approvals. To be installed by end of 2019. 2019 2021 2026 ??? Lead Removal Most Sensitive (Schools, etc) Lead and backyard service replacement Irish Water Lead Mitigation Plan Scope Irish Water “Opt-in” programme (ad-hoc) Domestic / Private / Government / Commercial lead removal (Gov. Strategy) Corrective Water Treatment Orthophosphate Treatment

Lead Service Replacement - Map of Individual lead services identified and notified to date Legend: Focus on Risk: High Risk supplies Most Sensitive Customers (Schools, crèches etc.) Backyard shared services & Public side service connections Longer term solution – 10 year

Lead Service Replacement – Map of individual lead services by Local Authority Legend: Estimated No. of Lead Services 180,000 Identifed to date:   Individual Lead Services through Metering 36,000 Pre-metering surveys - Backyards 40,000 Yet to be identified 104,000 Data gap – Need to identify unknown lead? Via National Sampling Programme, Watermain rehab programmes, LA knowledge on the ground. Over next 6 months, request for LAs to submit GIS maps identifying suspected lead in areas not metered via GIS Digitisation Process Data will be used for risk prioritisation of individual water supplies and lead replacement programmes

Corrective Water Treatment - Ortho-Phosphate in Drinking Water Ortho-Phosphate as a food grade additive: Naturally occurring in milk, cheese, apples, potatoes, fish Addition to Water is 0.5-2.0 parts per million Levels in Soft Drinks is 150 parts per milllion (100 + times) Levels in Beer is 250 parts per million (200 + times) Typical adult daily intake of P is about 1,300 mg of which water would be 4.5 mg Over 90% of Water Supplies in Britain (61 Million people) All public Water supplies in Northern Ireland since 2006 Widely used in Canada & United States Ortho-Phosphate delivering 99% compliance with lead limit A lead pipe, a corroded pipe, and a pipe with protective orthophosphate coating. Photo: USEPA

Corrective Water Treatment Develop Plumbosolvency Control Implementation Plans in consultation with Local Authorities Complete environmental assessment for each proposed supply (assess up to 400 “high risk” water supplies) Install orthophosphate treatment systems where technically, economically and environmentally viable Takes 6-24 months to form protective coating throughout the network, thereafter a maintenance dose is required Standardised design / modular construction Associated upgrade works may be required: Upgrade pH control Phosphorus Removal at WWTPs Monitor Water at tap and Phosphorus in wastewater A Typical orthophosphate treatment unit

Step 6 of Plan : Corrective Water Treatment - WSZ Plumbosolvency Control Plan WSZ Health Assessment Submit Summary to DHPCLG, HSE & EPA for decision Customer Start Step 8 Public Lead Service Replacement Step 8 Public Lead Service Replacement N Est No. of lead services < 50* Proceed with implementation of corrective treatment option? Y Amber /Red Green 6d) Prepare Plumbosolvency Control Plan RAG Status N 6a) Optimum Dosing testing Y Step 7 Next 12 months: Continue with WTP Optimum pH & OP testing Commence Limerick Priority Project Undertake EAMs, health assessments at up to 400 WTPs Development of Plumbosolvency Control Plans in consultation with Local Authorities. 6c) Undertake Environmental Assessment & NIS 6b) Determine fluorapatite formation risk

Next Steps Finalise the Lead in Drinking Water Mitigation Plan Limerick Priority Project Lead Replacement - Identify unknown lead services through updating GIS; and prioritise lead service replacement Corrective Water Treatment - Complete WSZ Environmental Assessment & Health Assessments at up to 400 WTPs Find out more information? Visit: www.water.ie/lead for infographics, videos and other additional information