RTCA Display for Increased Situational Awareness

Slides:



Advertisements
Similar presentations
Arizona Corporation Commission 2008 Biennial Transmission Assessment Workshop I CATS-EHV 2007 Studies Ten Year Snapshot and N-1-1 Jose Silva Salt River.
Advertisements

David H. Wiggs General Manager Los Angeles Department of Water and Power September 24, 2003.
Reliability Software1 Reliability Software Minimum requirements & Best practices Frank Macedo - FERC Technical Conference July 14, 2004.
TOTAL CASES FILED IN MAINE PER 1,000 POPULATION CALENDAR YEARS FILINGS PER 1,000 POPULATION This chart shows bankruptcy filings relative to.
EVAZ Stakeholders September 16, 2014 Tucson Electric Power 88 E. Broadway Tucson, AZ EVAZ Electric Vehicle Arizona.
Arizona Transmission System Overview November 18, 2014 Tribal Solar Working Group 1.
California Independent System Operator Soumen Ghosh CAISO CONFIDENTIAL Created: 06/15/2008 State Estimator for CA ISO Market - Relevance and Readiness.

ECE 530 – Analysis Techniques for Large-Scale Electrical Systems Prof. Hao Zhu Dept. of Electrical and Computer Engineering University of Illinois at Urbana-Champaign.
Major Mountain Ranges and Rivers of the United States
By Kathy Estrada Tucson Electric Power.  Location  System Description  TOLS Background.
Arizona Power Authority Transmission Workshop August 7, 2015 APA Offices/On-line Webinar.
NW Transmission System Bottlenecks and Impacts of 2005 Summer Operation BPA Transmission Business Line Mike Viles January 2006.
Arizona Renewable Transmission Task Force BTA Response Chairman of SWAT RTTF Peter Krzykos Peter Krzykos BTA Workshop May
Recommendations from 2011 Southwest Outage Heather Polzin, FERC Office of Enforcement Dave Nevius, Senior Vice President, NERC Member Representatives Committee.
PHAAUG – Peak Reliability
Introduction Peak Hosted Advanced Applications. 2 What is this project all about? Enhanced TOP situational awareness and ability to perform real-time.
Peak RCCo Performance Metrics Draft –November 2013.
2009 SOUTHEAST ARIZONA TRANSMISSION SYSTEM STUDY REPORT 6 th BTA Workshop Carnegie Library, Phoenix, AZ By TEP on behalf of SATS Participants June 3-4,
National Code & Number Change Update All the Phone Companies Together September 2000.
March 11, 2011 RPG Meeting Lower Rio Grande Valley (LRGV) Import.
© Property of ERCOT /17/20041 RTCA, CAM, and SFT Presented by: John Adams November 17, 2004.
Announcements Please read Chapters 1 and 2
STATE ESTIMATOR QUALITY TRACKING IN BC Hydro EMS IMPLEMENTATION Dr. DJORDJE ATANACKOVIC, P.Eng. Engineering Team Leader, Power system Applications, Grid.
Computer System Support   The costs of installing, operating and maintaining computer systems are called total costs o ownership or TCO  TCO includes.
State Estimator (SE) and Simultaneous Feasibility Test (SFT) Status Report Steve Myers Manager of System Operations.
Voltage Support Service (VSS) for CREZ Region Advanced Network Applications ERCOT.
Electric Circuit Types Series and Parallel Circuits.
09/20/20061 RTCA, CAM, and SFT Presented by: John Dumas September 20, 2006.
Section Objectives  Describe how current divides in a parallel circuit.  Determine the voltage across and current through each branch of a parallel.
Where does the water go? Flow diagrams of U.S. and Western water use 1/2/2013.
TEP RMR Workshop Presentation1 Workshop on ACC RMR study submitted with 2004 ten year plan Tucson Electric Power January 15, 2004 Ed Beck Supervisor Transmission.
ELECTRICAL CIRCUIT DIAGRAMS
Hoover Dam.
Test Results in the Online Reporting System (ORS)
Operation of CSC DCS Ryan Carroll Carnegie Mellon 29-Sept-2009.
Delivery the TPG Way The TPG is the Dutch Post Office who are in a joint venture with TNT.
Conserving Energy SNC1P1 Findlay.
Western Electricity Coordinating Council
Load flow solutions Chapter (3).
ELECTRICAL CIRCUIT DIAGRAMS
Peak online TSAT Implementation Update
Welcome to our first session!
Southwest Gas Corporation Chris Sohus, Vice President/Operations
“TOP-010-1: Data Quality, Analysis Quality, and Alarm Process Monitor”
التدريب الرياضى إعداد الدكتور طارق صلاح.
ECE 333 Green Electric Energy
ELECTRICAL CIRCUIT DIAGRAMS
ELECTRICAL CIRCUIT DIAGRAMS
Delivery the TPG Way The TPG is the Dutch Post Office who are in a joint venture with TNT.
PEAK’s RMTNET Tool Sarma (NDR) Nuthalapati, Principal NetApps Engineer
PacifiCorp-CAISO-NVE EIM Initiative Overview
Electricity and Circuits
PowerChart Overview Tab New Feature for Physicians
ECE 576 Power System Dynamics and Stability
PacifiCorp Overview Choose from three different title slide designs by selecting “New Slide.” These slides are suitable for business and community presentations.
Electricity Review.
Indistar Upgrades January 2019 ®.
Palo Verde-COI RAS Retirement
2.2 Find Slope and Rate of Change
Palo Verde-COI RAS Retirement
The global implications of water management
Conserving Energy.
ELECTRICAL CIRCUIT DIAGRAMS
2.2 Slope and Rate of Change
Electricity Review.
ELECTRICAL CIRCUIT DIAGRAMS
TEP’S RAS MODELING for POWER WORLD
CORDLESS PHASING TESTER
Banking Business challenge
Presentation transcript:

RTCA Display for Increased Situational Awareness Presented by Cory Fisher September 2015

Agenda SRP System Model SRP Real Time Sequence (RTS) Current Operator Control Page New Operator Control Page (New Features) Examples (Illustrations of New Control Page) Current Status Questions

SRP System Model EMS Model - 2200 BUSES Voltage Levels - 500kV down to the 12kV Level Neighbors Arizona Public Service Company (APS) Western Area Power Administration (WAPA) Tucson Electric Company (TEP) Full Arizona footprint (BES) with some lower voltage parallel Neighboring Systems (APS) Network Model reaches several Buses into… South California Nevada Utah Colorado New Mexico

SRP REAL TIME SEQUENCE (RTS) RTS Cycles Every 6 seconds. State Estimator Runs every 30 seconds Real-Time-Contingency Analysis runs every 5 minutes Total of 850 Contingencies (and growing) All SRP 69kV to 500kV (N-1) Creditable BES (N-N) Neighbor’s BES Open-End Line Contingencies (Closing Angle Exceedances)

Current Control Page All Results from RTCA for both SRP and Non SRP Contingency are displayed on the same page. No way to sort between SRP and Non SRP exceedances. No way to sort between (N-1) and (N-N) exceedances. Results sorted by severity resulting in all the (N-N) contingency dominating the page.

New Operator Control Page New Features Contingency Categories for: (N-1) and (N-N) SRP Contingencies/SRP Exceedances. Foreign Contingencies/SRP Exceedances. SRP Contingencies/Foreign Exceedances. Foreign Contingencies/Foreign Exceedances. Open-Ended Line Contingencies Load Drop Contingencies

New Operator Control Page New Features (Continued) Power-Flow Solutions Quality Indices. Up And Down Arrows (Indication more items below or above) Minutes since last CA Run (successful run)

New Operator Control Page Status Currently running in Production in parallel with the Old Page. All Shifts have received training on the New Page. Old Page will be turned off by the end of the Month (September).

Questions?