Recycled Water Project Basis of Design Report

Slides:



Advertisements
Similar presentations
Paul Cook Irvine Ranch Water District General Manager February 21, 2013 Shared Services: Baker Water Treatment Plant.
Advertisements

The CSO Abatement Project Presented by: Paul Nordstrom Director of Operations and Engineering.
Presented by: Ronald O. Nichols LADWP General Manager
Anne Arundel County Department of Public Works
The Town of Discovery Bay Community Services District Wastewater Treatment Plant Master Plan NOVEMBER 9, 2011.
The Idaho Department of Environmental Quality Mark Mason, P.E., Engineering Manager Idaho DEQ - Boise Regional Office 1445 North Orchard Boise, ID
WelcomeWelcome BURT PROCESS EQUIPMENT “Harvesting The Rain” Rainwater Reclamation.
TEXAS COMMISSION on ENVIRONMENTAL QUALITY. PROPOSED STUCTURE FOR CHAPTER 217 < Subchapter A Administrative Provisions < Subchapter B Design Bases < Subchapter.
Energy Efficient Design Low Cost State Loan Low-Impact Construction Novato Sanitary District Wastewater Facilities Upgrade Presenter: Beverly James, Manager-Engineer.
SESSION: DEICER MANAGEMENT SOLUTIONS Salt Management Research in Virginia Jimmy White, Virginia Center for Transportation Innovation & Research The Virginia.
City of Oshkosh Water System. Public Works Utility Division Water Filtration Plant Water Distribution System Wastewater Collection System Pumping Stations.
Desalination & Clean Water Technology Industry-Government Forum August 23, 2012 Roger Bailey Public Utilities Director.
California’s New Onsite Wastewater Treatment System Policy Richard Sanchez, REHS, MPH President California Conference of Directors of Environmental Health.
Presented by Fred Barker, P.E., MassDEP Boston Massachusetts Department of Environmental Protection Drinking.
Wastewater Treatment & Collection System Improvements.
11 City of Hallandale Beach Water, Wastewater and Stormwater Facilities Plan Public Meeting.
Cornerstone Engineering Group The Foundation for Your Civil Engineering Needs Camanche Reservoir Water Treatment Plant Project Cecilia Zamora Evangelina.
Cornerstone Engineering Group The Foundation for Your Civil Engineering Needs Camanche Reservoir Water Treatment Plant Project Cecilia Zamora Evangelina.
Key Elements of a Safe Water Supply An Adequate and Protected Water Source A Secondary Supply A Quality Treatment System An Adequate Finished Water Storage.
 UAB Vilniaus waters - the largest water company in Lithuania, which operates not only in the city of Vilnius, but also the district, Svencionys and.
1 Investing in your water … investing in your future California American Water General Rate & Conservation Case Applications.
Chicago Department of Water Management Thomas H. Powers, P.E. Commissioner Leadership Summit June 2, 2015.
Buckhorn Disinfection Byproducts / Backwash Disposal Project Board of Directors Meeting June 14, 2012.
City of Polson April 5, 2010 PUBLIC HEARING Water System Improvements PRESENTATION ON PRELIMINARY ENGINEERING REPORT.
Volvo Group North America, LLC Reuse of Wastewater - A Manufacturer’s Experience Steve Pierett, Env.Mgr. CEM, CRM, CP EnMS-Industrial.
SPWSTAC 2006 From POU to Centralized Arsenic Treatment: A Small Water System Case Study 2006 NGWA Naturally Occurring Contaminants Conference J. Mitchell.
Biological Aerated Filtration (BAF) at the Denver Water Recycling Plant 2006 Water Reuse Workshop Golden, CO Russell Plakke, Denver Water.
Water for Monterey County Regional Project Capital and O&M Cost Description 1 Lyndel Melton, P.E. RMC Water and Environment.
Rapid Assessment Process Project Strategic Plan City of Marfa Water and Wastewater System Improvements Marfa, Texas Presented to: Stakeholders and Project.
ELK MEADOWS HOA Water Master Plan (Supply, Treatment, Distribution, and Storage) May 2005.
Southeast Energy/Water Interdependence Exercise Basic Drinking Water Treatment EPA-R4 Drinking Water Section April 25, 2007.
Wet Weather Improvements Project November 2, 2007 North Bay Watershed Association Board Meeting.
Aerojet Environmental Update Carmichael Town Hall Meeting March 12, 2008 Michael Girard Aerojet Environmental Site Remediation (916)
Rapid Assessment Process Project Strategic Plan Village of Columbus Water Supply and System Improvements Luna County, New Mexico Presented to: Stakeholders.
Considerations for Brackish Groundwater Use as a Water Supply for Small Water Systems and Municipalities Eddie C. Livingston, MSCE, P.E. Livingston Associates,
Anaerobic Digestion at Wastewater Treatment Plants Regulatory Issues Bureau of Resource Protection April 2011.
Public Information Meeting Wastewater Treatment January 26, 2016.
March 3, 2016 Discovery Sewer/RWQCB LSM Vallecitos Water District Regional Water Quality Control Board (RWQCB) Lake San Marcos February 10, 2010.
TMDL for Diazinon in Chollas Creek Watershed TMDL for Diazinon in Chollas Creek Watershed Linda Pardy (858) Jimmy.
Silicon Valley Advanced Water Purification Center And Future of Purified Water Use Tour Guides: Miguel Silva Tour Coordinators: Amy Fry, Michelle Pelayo-Osorio.
1 EASTERN MUNICIPAL WATER DISTRICT Temecula Valley Recycled Water Pipeline Joe Mouawad Sr. Director of Engineering September 2, 2015.
Wastewater Department Staff Report Gravity Thickener and pumps  Replacement of both thickener pumps, valves, controls, grinder and electrical system.
Phase II and Compost Facility Upgrade Projects February 16, 2012.
Operating Efficiencies Costs to operate and maintain the water and sewer system have not varied significantly during the first 5 years of operation.
1 Highland Water District CAPITAL IMPROVEMENT PLAN.
Miami-Dade Water & Sewer Department Miami-Dade Water and Sewer Department |  1   Reuse, Every Drop Has Value Seminar FPL JPA.
1 | emwd.org AquaSel Brine Concentration Demonstration Project Khos Ghaderi, P.E. May 18, 2016.
City of Farmersville Wastewater Project January 26, 2016 Kimley-Horn and Associates, Inc.
GWRS Final Expansion Project and SP-173 Update GWRS Steering Committee Meeting April 11, 2016.
1 | emwd.org Indirect Potable Reuse (IPR) Public Outreach and Preliminary Design Services Joe Mouawad, P.E. and Jolene Walsh August 11, 2016.
STOCKTON DELTA WATER SUPPLY PROJECT (DWSP) Final Environmental Impact Report (EIR) Certification Hearing November 8, 2005 Mark J. Madison, Director Municipal.
Grey Owl Municipal Water feasibility study
RUSSELL - ROSSBURN WATER SUPPLY
Chromium 6 Regulation Corrective Action Plan October 6, 2015
Recycled Water Project – Sharon Heights GCC
Flow Equalization Jae K. (Jim) Park Dept. of Civil and Environmental Engineering University of Wisconsin-Madison.
CITY OF MARSHALL CHLORIDE ISSUES September 26, 2017
City of Noblesville Wastewater Utility
Pinole-Hercules Water Pollution Control Plant Upgrade Project
Class III Estimate for Regional Consolidation
CITY OF MARSHALL CHLORIDE ISSUES NOVEMBER 22, 2016
Wastewater Facilities Upgrade Project
SBSA.
Managing urban watersheds
Capital Improvement Plan April 9, 2018 Status Update
Change Order 5, Contract S03003D01 Engineering Services for SSWRF Post-Secondary Capacity Improvements and Restore ED’s Original Delegated Authority.
SWAC – Agenda 10/23/18 Chapter 6 – Alternative Technology – Draft Findings 2. Chapter 7 – Draft Landfill Disposal Existing Disposal System Disposal Options.
Is the Bay Area Ready for Potable Reuse?
TAPPING THE WORLD OF POSSIBILITIES
Dollars and Cents: Ways to Save and be More Resourceful
Presentation transcript:

Recycled Water Project Basis of Design Report Board Meeting April 10, 2017

Purpose of Basis of Design Report (BODR) Develop 25% Design Present Design Criteria Describe Facilities Present Opinion of Probable Cost Develop Implementation Schedule April 10, 2017

Recycled Water Demand CCWD quantity and quality requirements Peak Day = 800,000 gpd Average Day = 550,000 gpd 48% Reverse Osmosis Blend April 10, 2017

RWP Facilities Secondary Effluent Diversion 8 inch pipeline from Secondary Clarifiers to Equalization Basin Secondary Effluent Equalization Basin Modified Primary Clarifier to 160,000 gallon capacity UF/RO Treatment System Universal Skid-Mounted Design 2 treatment trains Accommodates different membrane module suppliers 48% RO Blend Additional space for future membrane vessels April 10, 2017

RWP Facilities RO Concentrate Disposal UV Treatment 8-inch pipeline to effluent pump station UV Treatment Disinfection per Title 22 Closed Vessel Chlorine Disinfection Residual Sodium Hypochlorite Recycled Water Treatment Structure Partially Enclosed Steel Framed Fabric Covering Structural fiberglass grating April 10, 2017

RWP Facilities Recycled Water Storage Recycled Water Distribution Modified Aeration Basin No. 2 260,000 gallon capacity Recycled Water Distribution 560 gpm pump capacity 6 inch diameter pipeline to OCP Wells HDD Construction under Pilarcitos Creek April 10, 2017

9/24/2007 Proposed Project January 23, 2017

Regulatory and Permitting Jurisdictional Entities SWRCB Division of Drinking Water San Francisco RWQCB San Mateo county Department of Environmental Health CCWD City of Half Moon Bay SAM April 10, 2017

Regulatory and Permitting Regulatory Requirements Title 22 of California Water Code Recycled Water Requirements UV Disinfection Guidelines Permitting CDP Waste Discharge Requirements/Water Recycling Requirements Construction Related Permits Environmental Compliance CCWD CEQA Lead Agency April 10, 2017

Opinion of Probable Cost Planning Level Cost Estimate Based on quotes for equipment suppliers 25% Contingency O&M Energy Chemicals Replacement Costs Labor April 10, 2017

Opinion of Probable Cost Sewer Authority Mid-Coastside Recycled Water Project - 25% Design Engineer's Opinion of Probable Capital Cost Description Quantity Unit Unit Cost ($) Total Cost ($) Mobilization/Demobilization/General Conditions 1 LS 10,000 Secondary Effluent Diversion 2 20,000 Secondary Effluent Diversion Pipeline 110 LF 120 13,200 Existing Primary Clarifier No. 4 Rehabilitation to Equalization Basin 200,000 Ancillary Equipment (valves, fittings, chemical dosing systems, bulk storage) 50,000 Recycled Water Treatment (UF/RO) 1,560,000 Treatment Structure 70,000 Ultraviolet Disinfection 285,000 Brine Discharge HDPE Pipeline 320 38,400 Backwash/CIP HDPE Pipeline 6 720 Recycled Water HDPE Pipeline to Storage 35 4,200 Existing Aeration Basin Rehabilitation to Recycled Water Storage 150,000 Electrical/Instrumentation 25,000 Site Modifications Subtotal 2,476,520 25% Contingency 619,130 Total Probable Construction Cost 3,095,650 Administrative, Legal, Planning, Design, Project and Construction Management @ 30% 928,700 Total Probable Project Cost (SAM Facilities Only) 4,024,350 Recycled Water Conveyance System * 1,181,000 Total Recycled Water Treatment and Conveyance System 5,205,350 April 10, 2017

Opinion of Probable Cost Sewer Authority Mid-Coastside Recycled Water Project - 25% Design Engineer's Opinion of Annual O&M Cost Description Annual Cost ($) Energy 74,620 Chemicals 16,100 Labor 115,000 Filter Replacement 12,600 UV Lamp, Sleeve, Ballast, Wiper Replacement 5,210 Pump Replacement 10,000 Recycled Water Conveyance 36,000 Monitoring and Reporting 3,500 Total Probable Annual O&M Project Cost 273,030 April 10, 2017

Opinion of Probable Cost RWP Cost (including Conveyance*) Interest Rate 4.0% 3.5% 3.0% 2.5% 2.0% Annualized Capital Cost ($) 301,030 283,020 265,570 248,700 232,420 Annual O&M ($) 273,030 Total Annual Cost ($) 574,060 556,050 538,600 521,730 505,450 Total Annual $/AF (616 AFY) 930 900 870 850 820 April 10, 2017

Current SRF Interest Rates April 10, 2017

END OF PRESENTATION Questions? June 29, 2015