Technical Standards: Paving the Way to NG9-1-1

Slides:



Advertisements
Similar presentations
© 2006 AT&T. All rights Reserved. AT&T Southwest VDB and ERDB Systems AT&T Southwest VDB and ERDB Systems.
Advertisements

VoIP i2 Architecture Part II
The current System Landline caller The emergency call process starts with a caller dialing (highly simplified) © 2011 Colorado Resource.
Next Generation Emergency Services Christian Militeau Intrado,Inc. March 21, 2006.
Brian Rosen Chair, Long Term Definition WG.  i1 = document older strategies for VoIP into  i2 = standard way to support VoIP on current E9-1-1.
What’s Next for i3? Dan Mongrain, Senior Solutions Consultant Bell Canada Terry Reese NENA NG9-1-1 Architecture Evolution Subcommittee Chair Senior Consultant,
NENA Development Conference | October 2014 | Orlando, Florida Local PSAP IP Network Infrastructure and NG9-1-1 Michael Smith, DSS Nate Wilcox, Emergicom.
What Makes It Work? A Panel Discussion on Next Generation 9-1-1
NENA Development Conference | October 2014 | Orlando, Florida NG9-1-1 PSAP Requirements and Standards Michael Smith, DSS Mike Vislocky, Network Orange.
NENA Development Conference | October 2014 | Orlando, Florida Committee Status Overview Pete Eggimann, DSC Co-Chair Jim Shepard, DSC Co-Chair NENA: The.
NENA’s 11 th Annual Technical Development Conference A proposal to support E911 calls on Voice over IP Networks Martin Dawson – Nortel Networks.
North American Emergency Services Brian Rosen Emergicom.
NENA Development Conference | October 2014 | Orlando, Florida ESIND working group Jim Lockard, Joel McCamley Co-Chairs.
The Next Generation Proof-of-Concept System.
An SAIC Company Telcordia View of NENA Progress on VoIP Migration Plan Telcordia Contacts: Nadine Abbott (732) An SAIC Company.
Alternatives for Providing Routing and Location Information to support Emergency Calling from IP Enterprises Prepared For: NENA VoIP Meeting on behalf.
Jason Horning, ENP NDACo 6/3/2015 Next Generation Update.
North American Emergency Services Brian Rosen Emergicom.
ESW – May 2010 UK Architecture for VoIP 999/112s John Medland – BT 999/112 Policy Manager.
December 5, 2003FG3 Report FOCUS GROUP 3 Interoperability Report to NRIC VI Council December 5, 2003 Cliff Naughton (Boeing)
ESW 7 – NENA ICE Testing NG9-1-1 Interoperability Testing −Background -Need -Response: NENA-sponsored NG9-1-1 Interop Testing −NENA Industry Collaboration.
NENA Development Conference | October 2014 | Orlando, Florida Emergency Incident Data Document (EIDD) Transfer Protocols Jerry Schlesinger, PMP – City.
© Copyright 2007 Arbinet-thexchange, Inc. All Rights Reserved. Voice Peering Steve Heap Chief Technology Officer.
FGDC Address Standard Update: What's Next? Address Standard Working Group Martha Wells, GISP Carl Anderson, GISP Sara Yurman, GISP Ed Wells, GISP Hilary.
Draft-rosen-ecrit-emergency- framework-00 Brian Rosen NeuStar CPa
Professional Project Management Service “Bringing It All Together”  The Project Manager is responsible for the overall planning and installation of Qwest.
Next Generation Standards, Transitions and Challenges Brian Rosen Senior Director, Neustar Chair, Long Term Definition WG, NENA.
What do YOU Really Need to Know?
Welcome to the NENA Development Conference. Thank You to Our Sponsors!
Building Blocks for the NG9-1-1 PSAP MICHAEL SMITH - DSS CORP. RICK BLACKWELL, ENP - GREENVILLE COUNTY, SC.
Sharing Incident Information Using the Emergency Incident Data Document MICHAEL SMITH - DSS CORP. RICK BLACKWELL, ENP - GREENVILLE COUNTY, SC.
NG9-1-1 Core Architecture: i3 v3 TERRY REESE BRIAN ROSEN.
Together, we’re changing the world of NG9-1-1 Deployments and Standards Nate Wilcox CTO.
Core VoIP and 911 issues and alternatives Henning Schulzrinne Columbia University August 2003.
Click to edit Master title style Click to edit Master subtitle style Intrado © 2005 V9-1-1 Building a Foundation Matt Wilson 1/1/2006.
9-1-1 ASSOCIATION - STEPS COMMITTEE 1/3/2013 NG9-1-1 TECHNOLOGY & PROCESS.
October 10-13, 2006 San Diego Convention Center, San Diego California VoIP Myth Busters Jim Shepard Executive Vice President HBF.
1 Presented by Jim Nixon, Breakout Session Moderator December 15, 2005 Report from Breakout Session #2 Individuals/Organizations to Government.
Demystifying Next Generation (The elephant in the room.)
Security Threats and Requirements for Emergency Calling draft-tschofenig-ecrit-security-threats-01.txt Hannes Tschofenig, Henning Schulzrinne, Murugaraj.
ESW 7 – NENA Standards Roger Hixson - NENA We are mid-way through documentation development for NG9-1-1, with a number of documents published and more.
Internet Real-Time Lab, Columbia University NG9-1-1 Prototype Demo Jong Yul Kim, Wonsang Song, and Henning Schulzrinne.
The member organizations of the National Public Safety Telecommunications Council are grateful to the Department of Homeland Security’s Science and Technology.
© 2015 Airbus DS Communications, Inc. All rights reserved. Lights, Camera, NG9-1-1 Diana Gijselaers/ Solutions Engineer – NG9-1-1 GIS and Core Services.
Doc.: IEEE /0794r0 Submission May 2007 Vijay Patel, Andrew CorporationSlide 1 NENA i3 Architecture: An Overview Notice: This document has been.
Jerry Schlesinger PMP Henry Unger
The Emergency Incident Data Document (EIDD)
Jim McEachern Senior Technology Consultant ATIS July 8, 2015.
ENP Study Group “Wireless-VOIP”
Defining Map Services in NG9-1-1
MSAG Conversion Service
How GIS will support Ng911 in Indiana
Kenjiro Arai NTT ITU Workshop on “Voice and Video over LTE” Geneva, Switzerland, 1 December 2015 NNI standards for IMS inter-connection.
New York: Evolution of an ESInet
The Latest NENA Standards: An Overview
Understanding the System of Systems
Understanding & Defining Additional Data Interfaces in NG9-1-1
Joint TGu : Location Configuration for Emergency Services
NENA Standards Under Construction
draft-rosen-nena-ecrit-requirements Brian Rosen
Preparing for the Future
ATIS Emergency Services Interconnection Forum (ESIF)
ENP Study Group Next Generation 9-1-1
The Public Safety Broadband Network (FirstNet) & NG9-1-1
ATIS Emergency Communications (EC) Standards Development
IEEE MEDIA INDEPENDENT HANDOVER DCN: es
Diane Harris, CF APMP, ENP April Heinze, ENP Wendi Lively, ENP
The Next Generation Proof-of-Concept System
GIS and Coordinating a transition Barry Ritter, ENP
Statewide Migration to an Emergency Services IP Network
Presentation transcript:

Technical Standards: Paving the Way to NG9-1-1 Jim Shepard, ENP Nate Wilcox Wendi Lively, ENP

NENA Standards Web Site www.nena.org Standards/Resources List all standards

Specific Standard and Other Useful Documents Sometimes NENA standards make it into an RFP Defacto standards Not all standards are applicable Sometimes only a small portion are Sometimes the standards listed are horribly out of date Following is “Nate’s” list of the top docs for 2016 Feel free to disagree….

NENA 08-003 v1 Detailed Functional and Interface Spec Now NENA-STA-010.2-2016 Outlines the SIP oriented FE’s and interface requirements necessary to support reception and delivery of NENA i3-type calls (e.g. calls delivered as SIP and contain a PIDF-LO) Conversion gateways are also covered in the spec (though they will likely be to a separate document for v3) Inbound conversion of calls from the PSTN Outbound conversion of calls to legacy PSAPs This newest version of this standard must be required when specifying a NG9-1-1 system

NENA 08-002 NENA Func. and Int. Standards for NG9-1-1 Version 1.0 Architectural overview of i3 Established both a SIP and an IMS architecture Detailed IMS work was to be handled by ATIS Good document to learn i3 – needs to be updated This should not be specified as a spec to meet in an RFP

NENA 08-751 NENA i3 Technical Requirements Document The original requirements that drove the NENA i3 work It needs to be updated Some requirements within the document could be helpful when writing a NG9-1-1 RFP The whole spec should not be a requirement in an RFP though

NENA 04-001 v2 PSAP E9-1-1 PSAP Equipment The spec for PSAP equipment within the PSAP supporting the call takers 16 year old standard An updated version is being created Some aspects of this standard are still applicable Do not specify this entire spec in an RFP – choose useable parts

NENA 75-001 Security for Next Generation 9-1-1 Standard Only NENA document outlining IT security Referred to as the NG-SEC Standard/spec 6 years old – needs to be carefully reviewed for applicable content Portions are acceptable to use in current RFPs NENA 75-502 Next Generation 9-1-1 Security Audit Checklist Information  Document Security checklist is very useful

NENA 04-002 PSAP Master Clock Standard Provides specifications on the functional parameters of a PSAP master clock Update in progress (NENA-STA-026.5-2016) Some portions still applicable

NENA 04-502 v1 E9-1-1 PSAP Site Characteristics TID Good information on the physical environment readiness for equipment 12 year old spec This should not be required in an RFP unless the vendor is actually building out the PSAP site as well – and then only some is still applicable

NENA 08-506 Emergency Services IP Network Design for NG9-1-1 IP network design standard – ESInet All applicable Update in progress (NENA-INF-016.2-201X) Sections should be reviewed before requiring them in an RFP

Network documents (now under ISC) 03-002 NENA Standard for the Implementation of Enhanced MF Signaling, E9-1-1 Tandem to PSAP 03-003 Implementation of Inter-Networking, E9-1-1 Tandem to Tandem Reference 03-004 E9-1-1 Functional Entity Model Standard 03-006 E9-1-1 Call Congestion Management Standards 03-008 E9-1-1 Default Assignment and Call Routing Functions Standard 03-501 Network Quality Assurance Information Document 03-503 SS7 Guidelines for Wireline and VoIP Emergency Services Gateway Interconnection to 9-1-1 Selective Routers Information Document 03-506 E9-1-1 Voice Circuit Requirements, Providing a P.01 Grade of Service Information Document 03-507 ESQK Guidelines for VoIP to E9-1-1 Connectivity Information Document

Network documents (now under ISC) All very good informational documents Not necessary in an RFP Necessary to understand external systems and system design

Data Structure 02-010: Standard Legacy Data Formats For 9-1-1 Data Exchange 02-501: Wireless (Pre-XML) Static and Dynamic ALI Data Content Information Document 02-503: XML Namespaces Information Document 04-005: ALI Query Service Standard 71-001: NG9-1-1 Additional Data Standard *****Update In Progress***** STA-004.1-2014: NENA Next Generation United States Civic Location Data: Exchange Format (CLDXF) STA-008.2-2014 (originally 70-001): NENA Registry System (NRS) Standard NENA/APCO-INF-005: NENA/APCO Emergency Incident Data Document (EIDD) Information Document

Data Management 02-011: Data Standards For Local Exchange Carriers, ALI Service Providers & 9-1-1 Jurisdictions 02-013: Data Standards for the Provisioning and Maintenance of MSAG Files to VDBs and ERDBs 02-014: GIS Data Collection and Maintenance Standards *****Update In Progress***** 02-015: Standard for Reporting and Resolving ANI/ALI Discrepancies and No Records Found for Wireline, Wireless and VoIP Technologies 02-502: NENA Company ID Registration Service Information Document 06-001: Standards for Local Service Provider Interconnection Information Sharing 71-501: Synchronizing Geographic Information System Databases with MSAG & ALI Information Document 71-502: An Overview of Policy Rules for Call Routing and Handling in NG9-1-1 Information Document INF-011.1-2014 : NENA NG9-1-1 Policy Routing Rules Operations Guide INF-014.1-2015: NENA Information Document for Development of Site/Structure Address Point GIS Data for 9-1-1 STA-003.1.1-2014: NENA Standard for NG9-1-1 Policy Routing Rules REQ-002.1-2016: NENA Next Generation 9-1-1 Data Management Requirements

What is Not Published Yet GIS Data Model Provisioning an ECRF/LVF New Authoritative Boundaries WG EIDD Conveyance

SDO Relationship IETF NENA TSD/TRD’s ATIS 3GPP Data TC Core SIPCORE WG ISC Ops Cmte ISC NG Sec ESIF 3261 IMS 08-751 ECRIT WG 71-001 5222 08-002 RFAI 75-001 5223 ESIND NG Sec 5031 71-002 Phone BCP 010.2-2016 Geopriv WG ECRF/LVF Maint. * Not a COMPLETE picture and slightly out of date 4119 Updated