Rye House Energy Recovery Facility

Slides:



Advertisements
Similar presentations
Engineering in business and the environment Lesson 4: Environmental effects of engineering activities.
Advertisements

Environmental Impact Assessment for Waste Treatment Options
CityCo, Piccadilly Hoteliers Forum
21 st Annual Conference. Delivering sustainable solutions in a more competitive world Mercury Lamps - Life Cycle Assessment for Product Stewardship Peter.
18 February Anaerobic Digestion On-farm AD Planning Permission and Environmental Permitting.
Energy National Policy Statements Anne Stuart DECC Energy Development Unit 22 October 2009.
Sustainable Construction
Recycling for the Future – The Dublin Waste Management Plan Mary O’Reilly RPS Consulting Engineers.
West of England Joint Waste Core Strategy Preferred Options Allan Davies Planning Policy Officer North Somerset Council West of England Partnership Office.
Waste Management (Food Waste) Regulations 2009
PRESENTATION FOR Bradford Environment Action Trust ON THE AUTOCLAVING OF MUNICIPAL WASTE PRESENTATION BY RICHARD LONGCAKE AND IAN BAIRSTOW 7 TH SEPTEMBER.
Planning Permission Process and Procedures
Southwark’s New District Heating Network.
Energy National Policy Statements Nick Cooper DECC.
Droitwich South Ward Meeting Yew Tree Development Community Hall 29 th June 2011 Facilitated by Cllr Richard Morris Neil Pearce, Development Manager Andrew.
COPYRIGHT © 2014 MITSUBISHI ELECTRIC EUROPE B.V. ALL RIGHTS RESERVED.
1 Achieving 60%+ recycling Proposals to introduce weekly recycling collection.
LOCAL IMPACTS AROUND AIRPORTS Jon Bottomley AOA Environment Conference 28 April 2014.
The role of waste management and energy from waste in a circular economy- SITA UK’s proposed Severnside development Sept 2009 Stuart Hayward-Higham.
Aberdeenshire Local Development Plan 2016 Identification of issues.
Hill Place Farm East Grinstead Presentation to East Grinstead Town Council Monday 4 th August 2014.
Steve Steele 12 March 2013 Construction Logistics.
Phased Environmental Impact Assessment (EIA) Process for Oil & Gas Development in New Brunswick Department of Environment January 2011.
1. Hybrid Planning Application Detailed Application = Stadium and related infrastructure Outline Application = Enabling development sites 2.
West of England Joint Waste Development Plan Document Allan Davies Planning Policy Officer North Somerset Council West of England Partnership Office North.
Low carbon heat international showcase Edinburgh The Public Sector Role in Developing Area-wide Low to Zero Carbon Heat 18 th November 2014.
LIFE AFTER LANDFILL – THE TRANSITION FROM LANDFILLS TO RESOURCE RECOVERY AND TRANSFER STATION 27 September 2007 "Planning – Guidance on Planning Issues.
Planning for the future of our district Core strategy options Presentation to C4B Associates February 2010.
PLANNING, TRANSPORTATION & ESTATES WASTE PLANNING ISSUES Mark Jones Deputy Director.
Shenstone Neighbourhood Plan Working Groups launch event 18 th June 2013.
Environment SPC 24 th June 2015 Draft Dublin City Development Plan
More Waste, Less Money The Challenge of Waste Management James Potter Acting Head of Waste, Planning & Environment.
Rookery South Resource Recovery Facility (RRF) Community Liaison Panel Transport Presentation – 14 th December 2009 John Hopkins, Peter Brett Associates.
Key benefits of Crossrail 2 Crossrail 2 would: Add around 10 per cent to London’s transport capacity Significantly improve journey time for a wide range.
CONGESTION TOPIC GROUP Delivering the Highway Authorities Network Management Duty Steve Johnson Head of Network Management.
Nigel Hannam and David Phillips Parish Conference – 11th September 2013 Balancing Development.
Policy Background Roger White Head of Policy. Aberdeenshire Council – Vision Serving Aberdeenshire from mountain to sea – the very best of Scotland The.
STAMFORD CAPACITY AND LIMITS TO GROWTH STUDY SOUTH KESTEVEN DISTRICT COUNCIL FINAL REPORT PRESENTATION PRESENTERS: UNA McGAUGHRIN JESSE HONEY 14 TH DECEMBER.
Metro Vancouver New Waste-to-Energy Capacity Project SIWMA Conference, Pemberton September 20, 2013 Sarah Wellman, Acting Project Manager.
Item 3 South East Plan and recent policy statements…
Waste and recycling service change (October 2015) HWP – Members’ Group 25 July 2016 Peter Linkson – Director of Environmental Services.
Land west of Grace Crescent, Hardwick Presentation to Hardwick Parish Council 23/08/2016.
AECOM Transport CLG Richard Corbin September 2016.
Veolia Rye House Energy Recovery Facility
Allington Waste Management Facility
What do I need to know? What is sustainable development?
The JMWP Consultation Visit frackfreeyork.org.uk for a link to the consultation page Download parts A and B of the publication response form if you plan.
WASTEMENEGEMENT IN BUILDINGS
New Economy Breakfast Briefing 6 December 2016
Power | Case Study The Client
Sustainability and the Built Environment
La Mesa Climate Action Plan Supplemental Environmental Impact Report Scoping Meeting May 31, 2017.
Waste Planning Case Studies Exeter Energy from Waste Facility
ANNUAL SUSTAINABLE MOBILITY CONFERENCE
Draft Transportation Element September 6, 2017
More power to the Northern Powerhouse
A future benefit for the South Cheshire infrastructure
Emily Pike Community Liaison Manager, SUEZ
A future benefit for the South Cheshire infrastructure
Tajiguas Resource Recovery Project Doing More with Our Waste
Tajiguas Resource Recovery Project Doing More with Our Waste
Local Authorities and Universities Partnership and Travel Solutions
DG Environment, Nature Protection Unit (D3)
Strategic Environmental Assessment (SEA)
Radisson Blu, London Stansted
Basic overview of an EMS
Manilla Low Level Crossing Project
Camarillo Springs Project Draft EIR Scoping Meeting
Industrial Emissions Directive Targeted stakeholder survey
Surrey County Council – Development of the Asset and Place Strategy
Presentation transcript:

Rye House Energy Recovery Facility Will result in 97% diversion of waste from landfill 300 jobs created during construction and 40 permanent posts available once ERF operational Planning application due to be submitted to HCC Waste Planning Authority in October 2016 Opportunities for S106 contributions to be targeted to benefit local community Construction targeted 2017 subject to planning with ERF due to operate from 2020

About Veolia UK leader in environmental solutions for waste, water and energy Our strategy focuses on manufacturing green products and energy to build the circular economy 1/3 of UK population is served by our recycling and waste services from 350 locations Business in the Community’s Responsible Business of the Year in 2016 with c14,000 employees Operate 10 ERFs in the UK with a combined capacity of 2.54m tonnes of waste, which are generating 1.1m Mwh of energy to the national grid - enough to power 320,000 homes In Hertfordshire, Veolia provides waste and recycling services to 4 authorities - East Herts, St Albans, North Herts & Watford. We also have a hazardous waste treatment facility in Redbourn and a commercial waste operation in St Albans.

Location – Ratty’s Lane, Hoddesdon In our view the Rye House site is an appropriate location for an ERF because: - it is industrial land, in use as an aggregates depot, neighbouring an existing power station and other waste treatment facilities; - its not in the green belt and is allocated for employment - there is good road access, allowing waste to be easily delivered; - there is an existing rail link providing options for removing residues and for materials movement during construction; - it provides a waste treatment location within Hertfordshire to serve Hertfordshire; and - a close connection can be made to the electricity grid, so the low carbon energy can feed into the national grid. Location has potential for extra heat to be used by local businesses

The Facility Will treat up to 350,000 tonnes of residual ‘black bin’ waste a year - including some similar ‘top up’ waste from commercial sources in the early years c300 jobs during construction and 40 permanent staff Existing rail connection Energy generated back to the national grid sufficient to power 69.000 Hertfordshire homes Visitor Centre on site as an educational resource Broxbourne will deliver waste directly with potential for an on-site depot for Broxbourne’s waste collection vehicles

Applications for Planning and Permit Reviewed data from previous proposals for site Prepared outline scheme based on contract requirements and site constraints EIA scoping report submitted to Planning Authority for consultation and Scoping Opinion EIA baseline studies updated or conducted Pre-application engagement, CLG and public consultation events Design iterations Environmental Impact Assessment reports prepared Permit Application submitted to Environment Agency for consultation and determination Opportunities for S106 contributions to be targeted to benefit local community EIA include: Highways/Transport Air Quality Landscape and Visual Noise and Vibration Ecology Dust and Odour Groundwater and Flood Risk Land Contamination Cumulative Effects Pre-application consultation period 27 June to 25 July 2016 3 public ‘drop in’ events held 29 June, 2 July, 4 July Over 200 attendees Almost 100 feedback forms received with views about the proposals Emails and telephone enquiries received on dedicated address and enquiry line Project details , FAQs and consultation materials available on Veolia Hertfordshire website Community Liaison Group formed with stakeholder representation and 4 meetings held. CLG members invited to tour Veolia ERF in London 140 properties at Dobbs Weir missed by mailing house, so consultation period extended to 1 August and discreet additional 'drop in' event held 28 July

Environmental Impact Environmental Impact Assessments Visual Impact Industry standard systematic process used to identify and quantify impacts Where effects are identified ‘mitigation measures’ are introduced to avoid, reduce or minimise unwanted impacts and to enhance beneficial impacts What remains is the ‘residual effects’ Assessments include any cumulative effects arising from o combined effect of individual impacts; and o combined effect of the development and other committed local developments such as the ATT facility and High Leigh development Visual Impact 42 representative views previously proposed for DCO application assessed and updated Community Liaison Group proposed alternative/additional locations to be assessed and added VVMs were also be produced for these additional locations In total the submission includes 44 representative views, 10 VVMs plus 1 night-time VVM Transport Assessment has been prepared and will be submitted with the planning application. Key figures – HGV numbers, other vehicles etc…. The predicted vehicle trips assume all residues will be exported by road. However, we expect the bottom ash will be exported by rail using the existing rail access, therefore reducing the number of vehicle movements. Peak hours and volume of vehicles… All large vehicles will be able to enter and exit the site outside peak hours and be spread throughout the day so there should be no need for these vehicles to wait, park or turn around off site.

Air Quality Transport Current baseline air quality established Modelling produced using 5 years of metrological data Potential air quality impacts from traffic movements to and from facility considered Environment Agency regulate emissions to ensure we meet stringent rules and limits imposed under our operating permit Transport Waste will come to the ERF from Hertfordshire’s Waste Transfer Stations Waste from Broxbourne, East Herts and Welwyn Hatfield will be delivered directly HGVs will be directed to use the main road network through a routeing agreement 134 HGVs per day + 45 staff and deliveries (100 HGVs per day permitted currently) Assessed as ‘worst case’ vehicle trips which assume all residues will be exported by road. However bottom ash to be exported using existing rail access meaning vehicle movements will reduce HGV traffic flows fall outside am/pm peak hours. Majority between 10am-2pm due to waste collection and delivery rounds

Flood Risk & Ground Water No untreated water from waste processing will be released into surrounding environment Water will be reused within the facility itself In abnormal situation (e.g. during maintenance) tankers to take water off site, for treatment and disposal Environmental Permit to address control and to measure potential emissions to surface water and to ground water Flood Risk Assessment submitted to demonstrate that the development will not cause flooding – either to the facility itself or to nearby residents or businesses Noise To ensure maximum efficiency the ERF will operate 24 hours a day, 365 days per year However vehicles will only arrive and depart the site in accordance with hours stipulated by planners Noise impacts on our neighbours minimised by: silencers, acoustic screens and sound insulation; automatic closing doors, to retain noise within the building; fans with anti– vibration supports, to avoid vibration transferring to the building structure; several silencers for noisy equipment; and use of special quieter reversing bleepers on vehicles

Local contribution 300 jobs created during construction so opportunities for local workforce 40 permanent jobs during operation (targeting local workforce) Educational resource – building includes a visitor centre Enough electricity to power the equivalent of 69000 Hertfordshire homes Opportunities for S106 contributions to be targeted to benefit local community Broxbourne Borough waste collection vehicles could use as hub and park on site Apprenticeship scheme commitment Significant local economy benefits for supply and service sector industries Potential for extra heat from the boiler to be used by local businesses