JRA3 Institute of Physics ASCR Prague

Slides:



Advertisements
Similar presentations
CALICE meeting, Montreal, 10 th May 2006Václav Vrba, Institute of Physics, AS CR ECAL Si sensors status and plans May 2006 V.Vrba.
Advertisements

Vanel Jean-Charles LLR – IN2P3 08 / 12 / 2004 : Calice Meeting Desy ECAL prototype status Calice ECAL Prototype Status Silicon sensors : Production Reception.
Optical Fiber Calibration System and Adaptive Power Supply Jiri Kvasnicka, Ivo Polak, Jaroslav Cvach Prague, Institute of Physics Gerald Eigen,
LCWS2010, Beijing, 2010 MAR29 Ivo Polák, FZU, Prague1 LED notched fibre system at AHCAL Calibration system for SiPM Ivo Polák 1.Notched fibre.
Calice, UT ArlingtonJiri Kvasnicka, FZU, Prague1 LED notched fiber system Jiri Kvasnicka 1.Introduction 2.Test setup and fiber layout on HBU0.
Sep 13, 2007CALICE Collaboration Meeting Prague 1 Long term test of LED pulsing  Long LED system stability measurement  Aging of part of optical system.
EUDET, OCT8 - 10, 2007 Ivo Polak, IoP Prague1 A fast LED driver prototype for HCAL calibration EUDET annual meeting at Ecole Polytechnique, Palaisau.
External calibration system - QMB6 Distribution of light: Notched Fiber Calibration and Monitoring Board (CMB) 1-ch LED driver (QMB1) Calibration System.
DESY, DEC-2013Ivo Polák, FZU, Prague1 Activity on Adaptive power & Calibration at Prague Ivo Polák, on behalf of Prague’s group QMB1A update.
Mathias Reinecke CALICE meeting Argonne EUDET module – Electronics Integration Contents -Next prototype : architecture -HCAL Base Unit (HBU)
Feb 20, 2009 CALICE meeting, Daegu, Korea QRL in Magnetic Field 1 QRLed Driver in Magnetic Field Jaroslav Zalesak Institute of Physics of the ASCR, Prague.
Optical calibration system for EUDET AHCAL module Jaroslav Cvach IPASCR 1.Calibration system for SiPM photodetectors 2.QRLED driver photoelectron spectra.
AHCAL – Electromechanical Integration EUDET annual meeting – Paris Oct M. Reinecke.
LED calibration systems for CALICE hadron calorimeter Jiri Kvasnicka Institute of Physics, Prague June 11, 2011TIPP 2011, Chicago1 Under.
LED calibration systems for CALICE hadron calorimeter
Reports from DESY Satoru Uozumi (Staying at DESY during Nov 11 – 25) Nov-21 GLDCAL Japan-Korea meeting.
2013 MAR 21Ivo Polák FZU Prague1 Tasks for AIDA SiPM Adaptive HV PSU AIDA subgroup Prague 2013 meeting Characterization of temperature influence to SiPM.
Calibration UV LED system for CALICE scintillator based Tile Hadron Calorimeter Ivo Polák on behalf of the CALICE Collaboration Institute of Physics of.
LCWA, ALCPG 2009 Albuquerque, NM Ivo Polák, FZU, Prague1 Calibration system of CALICE AHCAL detector Ivo Polák 1.Two calibration light distribution.
Hadron Calorimeter Felix Sefkow EUDET Annual Meeting October 20, 2006.
CALICE ANL, MAR18, 2008 Ivo Polak, IPASCR, Prague1 A fast LED driver prototype for HCAL calibration CALICE meeting at ANL, USA.
Light Calibration System (LCS) Temperature & Voltage Dependence Option 2: Optical system Option 2: LED driver Calibration of the Hadronic Calorimeter Prototype.
Munich, 18 Oct 2006J. Cvach, annual JRA31 JRA3 Institute of Physics ASCR Prague 1.ECAL, VFCAL (V. Vrba) 2.HCAL (J. Cvach) 3.Exchange in NA2 (travels 8.5.
Montpellier, November 12, 2003Vaclav Vrba, Institute of Physics, AS CR 1 Vaclav Vrba Institute of Physics, AS CR, Prague CALICE ECal Status Report.
1. DESY tests 2. Electronics developments 3. Optical developments 4. Outlook Casablanca J. Cvach, CALICE Coll. meeting.
Montpellier, November 15, 2003 J. Cvach, TileHCAL and APD readout1 TileHCAL- fibre readout by APD APDs and preamplifiers Energy scan with DESY beam –Energy.
ANL, MAR-2014Ivo Polák, FZU, Prague1 Activity on Compass 2 detector with Calibration at Prague Ivo Polák, on behalf of Prague’s group Compass.
EUDET JRA3 ECAL and FEE C. de La Taille (LAL-Orsay) EUDET status meeting DESY 10 sep 2006.
Pion Showers in Highly Granular Calorimeters Jaroslav Cvach on behalf of the CALICE Collaboration Institute of Physics of the ASCR, Na Slovance 2, CZ -
Optical Part of the CMB for AHCAL-CALICE Jaroslav Zalesak Institute of Physics, Prague.
V. Korbel, DESYECFA-DESY Workshop, NIKHEF1 Readout for the minical and Tile-HCAL prototype, 15’ The VFE RO: The light signals Photo-detectors 1) APD’s.
AHCAL Physics Prototype. The Electronics Part Mathias Reinecke for the AHCAL developers DESY, March 2nd, 2010.
PSD upgrade: concept and plans - Why the PSD upgrade is necessary? - Concept and status of the PSD temperature control - Concept of the PSD analog part.
Lucie Linssen, PH senior staff meeting 23 Nov ’05 slide 1 EUDET Links: Public EUDET pages: Internal EUDET pages:
oct - 6Ivo Polák, FZU, Prague1 Calibration system for SiPM and LED notched fibre distributing system Ivo Polák, on behalf prague’s group
CALICE Tungsten HCAL Prototype status Erika Garutti Wolfgang Klempt Erik van der Kraaij CERN LCD International Workshop on Linear Colliders 2010, October.
Main HCAL, JUL1,2008Ivo Polak, IP_ASCR, Prague1 Calibration system with optical fibers HCAL main meeting, DESY.
Status of the PSD upgrade - Problems with PSD in Be runs - Modification of cooling system - New temperature control - Upgrade of HV control system - MAPD.
5-9 June 2006Erika Garutti - CALOR CALICE scintillator HCAL commissioning experience and test beam program Erika Garutti On behalf of the CALICE.
Systematics on ScECAL 1 st prototype DESY Apr , CALICE Satoru Uozumi for the CALICE collaboration NIM A, 763 (2014) 278.
August DESY-HH VFCAL Report W. Lohmann, DESY Infrastructure for sensor diagnostics FE Electronics Development Sensor test facilities Laser Alignment.
The 2 nd SCECAL module for the Fermilab beam test - tentative idea - S. Uozumi (Shinshu) Jun GLDCAL meeting Next beam test will be held likely.
The CALICE scintillator tile HCAL project Felix Sefkow LCWS’06, Bangalore March 9-13, 2006.
Status of the PSD upgrade - Status of the PSD cooling and temperature stabilization system - MAPD gain monitoring system - PSD readout upgrade F.Guber,
PSD upgrade: concept and plans - Why the PSD upgrade is necessary? - Concept of the PSD temperature stabilization and control - Upgrade of HV control system.
Tile HCAL status Felix Sefkow CALICE Technical Board Review April 19, 2007.
Annual EUDET, OCT6,2008 Ivo Polak, IP_ASCR, Prague1 Calibration system with optical fibers for AHCAL EUDET annual meeting, NIKHEF 1.Introduction 2.QRLed.
Hadron Calorimeter Felix Sefkow EUDET Extended Steering Meeting September 11, 2006.
AHCAL Integration. Status and Outlook Mathias Reinecke for the AHCAL developers CALICE week Lyon IPNL, Sept. 16th – 18th, 2009.
ILC/EUDET developments at LAL Scientific council 23/9/05 B. Bouquet, J. Fleury, C. de La Taille, G. Martin-Chassard LAL Orsay.
DESY, 8 Dec 2005J. Cvach, prekick-off JRA3 JRA3 Institute of Physics ASCR Prague 1.ECAL, VFCAL (V. Vrba) 2.HCAL (J. Cvach) 3.Exchange in NA2 (travels 8.5.
AHCAL Electronics. Status of Integration Mathias Reinecke for the DESY AHCAL developers AHCAL main and analysis meeting Hamburg, July 16th and 17th, 2009.
Front end electronics for the Tile HCAL prototype Felix Sefkow DESY CALICE Collaboration ECFA workshop Durham September 1, 2004.
AHCAL Electronics. status and open issues Mathias Reinecke CALICE ECAL/AHCAL - EUDET electronics and DAQ - AIDA DESY, July 5th to 6th, 2010.
Scintillator HCAL prototype commissioning and calibration J.Cvach Institute of Physics AS CR, Prague Calibration basics Test results Outlook LCWS 06.
14.4. Readout systems for innovative calorimeters
LED notched fibre system short HBU0 party with QMB6
A fast LED driver prototype for HCAL calibration
PSD Front-End-Electronics A.Ivashkin, V.Marin (INR, Moscow)
HCAL task status report
Summer 2000 HF Beam Test. DAQ proposal.
LED notched fibre system at AHCAL Calibration system for SiPM
Felix Sefkow CALICE/EUDET electronics meeting CERN, July 12, 2007
Vishnu V. Zutshi For the NICADD team.
Status of the EUDET Prototype
A fast LED driver prototype for HCAL calibration
Peter Kodyš, Zdeněk Doležal, Jan Brož,
AIDA KICK OFF MEETING WP9
Scintillator HCal Prototype
Calice Tile-HCal and Tail-catcher/Muon Tracker
Presentation transcript:

JRA3 Institute of Physics ASCR Prague ECAL, VFCAL (V. Vrba) HCAL (J. Cvach) Exchange in NA2 (travels 8.5 k€) Munich, 18 Oct 2006 J. Cvach, annual JRA3

Tasks in EUDET & budget w/o overheads Si sensor development for ECAL, VFCAL Monitoring system for HCAL Consumables - 81.7 k€ Si sensor development + production (34.6 k€) VME test stand (25742 €), calibration electronics (16.5 k€) computing (4.9 k€) Personnel - 13 k€ for PhD students, young postdocs Travels 4 k€ Contribution from the Institute Permanent staff – 67 ppm Travels (6.7 k€) Munich, 18 Oct 2006 J. Cvach, annual JRA3

Si Sensors for ECAL (V. Vrba) DET1 DET2 DET3 DET4 DET5 DET6 DET7 DET8 DET9 Si Sensors for ECAL (V. Vrba) Sensor ECAL prototype production: 2006: in four production runs of Si pad sensors at ON Semiconductor we obtained 72 good fully tested wafers which have been integrated into ECAL prototype January-July 2006: wafers delivered to Ecole Polytechnique 7 ECAL layers equipped with ON Semiconductor wafers end of 2006: additional fabrication run at ON Semiconductor is planned to produce about 60 wafers for the full instrumentation for 2007 test beam. Václav Vrba, SI ECAL Sensor Status 2006

I-V curves on pad arrays Munich, 18 Oct 2006 Václav Vrba, ECAL status

Reverse current long term stability 2 weeks Munich, 18 Oct 2006

Sensor testing @ Institute of Physics AS CR Test laboratory for measurement of Si sensors Senzors from ON Semiconductor, Czech Republic EUDET tasks Design studies for finer granularity (5x5 mm2) of Si sensors are under way Possibility to use 6” wafers is also investigated Munich, 18 Oct 2006 V. Vrba, ECAL status

HCAL - Calibration + Monitoring Board system (I. Polák) CMB provides calibrated UV flashes to the scintillator tiles optical feedback via PIN photodiode sensing of temperature at scintillator planes and on CMB connection via CANbus to the detector Slow Control monitoring of temperature, voltages, … setting enable, amplitude, pulse width of each LED Munich, 18 Oct 2006 J. Cvach, annual JRA3

Calibration and monitoring board II Calibration & monitoring board – to deliver LED light dynamic range 0.5 – 100 MIP Functions LED control Amplitude (via DAQ, CANbus, standalone) Pulse width: 5 ns  Enable PIN diode readout Temp monitoring Measurement of nonlinearity LED intensity varied by DAQ Intensity measured by PIN Absolute calib from linear part 12 PIN ampli 3 pulse generators control 1V 10 ns

Calibrating 18 SiPM with one LED Munich, 18 Oct 2006 J. Cvach, annual JRA3 Gain calibration for a matrix of 18 SiPM connected to the same LED

HCAL plane CMB boards during CERN tests Munich, 18 Oct 2006 J. Cvach, annual JRA3

VME stand – durable equipment financed from the EUDET project Replacement of old CAMAC and NIM modules Measurements of signals from photodetectors (PM, APD, …) 9 pieces of APDs, Hamamatsu S 8664-s 12 bit QDC, 16 chan., V792N Controller V2718 connected by optical cable to PC Reading, control with Labview 4-channel power supply N472 GPIB, serial bus Scope TDS 5104 Munich, 18 Oct 2006 J. Cvach, annual JRA3

Stand is operational – a EUDET milestone Initialisation QDC reading Input buffer decoding Stand is operational – a EUDET milestone Labview chart of signal processing LED  4 fibres read by APD +QDC Ivo pulser + V993 dual timer – 1 kHz What we gained? Larger dynamic range 10bit12bit QDC Sophisticated system (new, VME) Short term usage: long term tests of CMB Jan Smolík Linearity dependence of 4 channels (APDs) to the increase (Vcalib) of the LED light J. Zálešák Munich, 18 Oct 2006 J. Cvach, annual JRA3

Calibration & Monitoring Board C M B Future stand use Long term tests and better understanding of CMB Use a CMB board with (8 LED & PIN diodes) + 8 APDs  16 QDC chan. APD APD Calibration & Monitoring Board Munich, 18 Oct 2006 J. Cvach, annual JRA3

Our immediate tasks in EUDET Production of Si wafers for ECAL module successfully integrated into the prototype and operated in the test beam Design studies for finer granularity (5x5 mm2) of Si sensors are under way; Possibility of the use of 6” wafers is investigated; Students and young physicist (Petr Mikes, Michal Marcisovsky, Pavel Ruzicka, Miroslav Havranek) are involved in the project activities participating in the laboratory sensor evaluation, test beam runs at DESY and CERN, data analysis, simulation etc. They also participate in regular collaboration meetings. HCAL – calibration electronics 2006: 40 (double) boards produced, 23 installed in the prototype, one half financed from EUDET Investigations of functionality and long term stability of CMB Participation in tests and data analysis Munich, 18 Oct 2006 J. Cvach, annual JRA3

Resources EUDET Main contribution from EUDET - consumables Upper table – our JRA3 spending profile by tasks Lower table – spending according to categories year HCAL ECAL VFCAL 2006 12 k€ 6 k€ 2 k€ 2007 12 6 5 2008 14 7 2009 6,55 1,9 4,15 year Perm staff Temp staff Consum ables Travel Durable equipm Over-heads Total (€) Install ment 2006 3256 4308 15 356 4742 2860 6104 36 625 36 740 2007 8581 2008 2009 5720 total 25742 Munich, 18 Oct 2006 J. Cvach, annual JRA3