MSc-Student Activities at ESO

Slides:



Advertisements
Similar presentations
Nokia Research Center Bridging the Now to the Next Nokia Research Center 2010.
Advertisements

TheEuropean Extremely Large Telescope. The E-ELT 40-m class telescope: largest optical- infrared telescope in the world. Segmented primary mirror. Active.
VISTA as seen by the Prime Contractor Adrian Russell.
Philip Diamond RadioNet Co-ordinator University of Manchester Jodrell Bank Observatory.
Trentino plus 10 Foresight Workshop July 2003 (Trento) Financing and organising applied research in Germany - the model of Fraunhofer Society PD.
Fifty Highlights from Fifty Years Celebrating 50 years of reaching new heights in astronomy The year 2012 marks the 50th anniversary of the European Southern.
December 2007Chile Observatories Earthquake Preparedness Workshop1 Atacama Large Millimeter/submillimeter Array ALMA Eduardo Donoso.
OPTICON Access Programme. OPTICON Access Programme. Mid-term review September Corfú OPTICON Trans-national Access Programme under the auspices of.
Descripción y Areas del Dpto. de Computación de ALMA (ADC) Tzu-Chiang Shen Gerente del Grupo de Software Departamento de Computación ALMA Joint ALMA Observatory.
ALMA Common Software Basic Track Software Engineering Basics.
ICT Coordination and Planning Meeting #1 (17-19 April 2013) ALMA Dashboard 1.0 Giorgio Filippi The Atacama Large Millimeter/submillimeter Array.
Telescope Technologies
ATTRACT is a proposal for an EU-funded R&D programme as part of H2020 for sensor, imaging and related computing (ICT) development Its purpose is to demonstrate.
Our Mission The OPTICON Integrated Infrastructure Initiative brings together all of Western Europe's owners and operators of large observatories and data.
A Search for Hydroxlyamine (NH 2 OH) Towards IRC+10216, Orion-S, Orion(KL), SgrB2(N), SgrB2(OH), W512M, W3(IRS5) R. L. Pulliam NRAO / North American ALMA.
1 Lithuanian ICT sector  In 2003, the sector of information and other new technologies compounded 7.5 percent of the Lithuanian GDP  About 500 of ICT.
The ALMA Software and Release Management Ruben Soto Software Operations Group & Release Manager Joint ALMA Observatory.
Career Opportunities at CERN for students and recent graduates HBO lectoren visit SIA/CERN/NIKHEF Ingrid Haug Section Leader Students and Associates,
Key Technologies Network Colin Cunningham. 11th Oct 2004 OPTICON Key Technologies Network Grenoble2 Objectives WP5.1: Workshops & Roadmapping: WP5.1:
Internationalisation of Finnish Public Research Organisations Dr. Antti Pelkonen Senior Scientist, VTT Technical Research Centre of Finland
TMT.PMO.PRE REL011 Thirty Meter Telescope Background and Status.
Our Mission The OPTICON Integrated Infrastructure Initiative brings together many of Europe's astronomical observatories, data centres and laboratories.
The North American ALMA Science Center Interim Director, Paul A. van den Bout.
Learning Sciences Research Institute University of Nottingham
ALMA Polarization Commissioning and Verification Status Kouichiro Nakanishi (Joint ALMA Observatory/NAOJ) on behalf of ALMA Polarization Commissioning.
FELT 1 Study of the capability and configuration of a fixed mirror Extremely Large Telescope (FELT) Low cost path to large telescope Primary concern is.
A Global Network for Standards Education and Research William E. Kelly Department of Civil Engineering The Catholic University of America Washington, DC.
An EU COFUND program An EU COFUND program
ALMA and the Call for Early Science The Atacama Large (Sub)Millimeter Array (ALMA) is now under construction on the Chajnantor plain of the Chilean Andes.
Paolo Padovani, VO Overview, 23/6/08, EURO-VO DCA Workshop - 1 The Virtual Observatory: an Overview Paolo Padovani Head, Virtual Observatory Project Office,
Future of Astronomy Astronomy 315 Professor Lee Carkner Lecture 25.
Atacama Large Millimeter/ submillimeter Array - ALMA ASAC Charges For Oct 31 ASAC Report to ALMA Board Al Wootten JAO Interim Project Scientist.
ALMA Town Meeting Introduction K. Y. Lo Director of NRAO.
ALMA Common Software Basic Track Project Lifecycle.
ALMA Common Software Basic Track Configuration Database.
ALMA Common Software Basic Track Component/Container Model and Lifecycle Management.
ALMA and FP6 Opportunities and strategy Funded project – construction phase FP6 timeframe 2003 – Good timing - first science planned for.
Driving Innovation V Driving Innovation V Invitation to further collaboration Dr Anne Miller Environmental Sustainability KTN.
Dashboard upcoming features A Hales, ALMA and M Chavan, ESO
A Tour of the Largest Ground-Based Telescopes Being Developed
ESO, Karl-Schwarzschild Str. 2, Garching near Munich, Germany
MSc-Student Activities at Institut Laue-Langevin
EGI Foundation (Session Chair)
Accelerating development of high- performance detector and imaging technologies for science and markets Pablo Tello (CERN)
Evaluation and Impact Assessment of European FP for R&D :
Division of Astronomy and Space Physics
Job Possibilities in Astronomy
ESS Innovation Procurement Workshop
Career Opportunities at CERN
ALMA Common Software Basic Track
ALMA Software Scheduling subsystem Planning for cycle5 onwards
Options for association and collaboration with CERN
MSc-Student Activities at the European XFEL
OFFICE OF NAVAL RESEARCH
PRTS & KPI Nick Whyborn – Vasco Cortez
Upgrade to Oracle12c in February 2017 José Parra
EIROforum is a partnership between eight of Europe’s largest intergovernmental scientific organisations Previously.
Magellan Status Report March 19, 2016 Carnegie Observatories
Update on Spanish Recruitment: Students, Staff, Fellows, Associates
9th European Interparliamentary Space Conference
ATACAMA LARGE MILLIMETER ARRAY
Co-Innovation and with Industry
INNOVATIVE POLICY LABS IN THE PUBLIC ADMINISTRATION
OECD and Radio Astronomy Spectrum
Welcome K. Y. Lo Director, NRAO
European Commission – DG CONNECT
IAWN Update.
Atacama Large Millimeter Array Science IPT Review
Professor Nigel Vincent
ALMA Town Meeting Introduction
Presentation transcript:

MSc-Student Activities at ESO Workshop on Designing Innovation Ecosystems 26-27 September 2016, Espoo Finland By Mark Casali www.attract-eu.org

Example of the Facilities or Research Instruments

Example of the Facilities or Research Instruments

ESO in Short Our Mission as an inter-governmental research organisation Provide facilities for ground-based astronomical research for the member states Foster collaboration in astronomy in Europe Our Facilities Paranal and La Silla observatories in northern Chile (Atacama desert) ALMA observatory on the Chajnantor Plateau (5000m), with North America and East Asia Headquarters in Garching, Munich Chile headquarters in Santiago New telescope, the ELT, is under construction on Cerro Armazones

ESO in Short Our Sources of Funding and Resources Annual subscription from our member states, proportional to GDP. All member state scientists treated equally. Example(s) of R&D projects with connections with industry or society at large Currently dominated by ELT with major industrial contracts to European industry Construction of the dome and main mechanical structure Manufacture and polishing of 798 precision hexagonal segments to make 39m mirror Instruments for the ELT Contracted to universities and institutes ESO pays for all industrial costs. Institutes supply teams of scientists and engineers, including students (mainly PhD).

MSc-Student Activities Rationale for ESO to support/host students PhD students focus on astronomical research topics Masters students are usually more technically oriented Volume of students per year (on average) 10 new PhD students per year One or so new MSc students per year Types of MSc student activities/programs Tackle well-defined technical task/problem fitting in available timescale Assist with advancement of overall project Location of the students Located at ESO, but official supervisor in academic institution

An Example of a MSc-student Assignment Nature of the Assignment and its length in time Configure and commission a lab test bench for advancing performance of adaptive optics systems eg. studying major errors sources Approximately 12 month assignment Type(s) of students and the geographical location of their universities USA. Students may come from any academic institution, especially the member states but not restricted to them. In principle anywhere in the world. Funding of the students comes from The budgets of the project itself. Students may be hired as Unpaid associate Paid associate Role of ESO personnel (local supervisor) in the Assignment Day-to-day supervision of the student Setting goals for the work and liasing with external academic supervisor

Plans for the Future related to Student Activities Evolution in scope? Currently no plans to enlarge scope of student activities ESO resources and activities currently under strain However lot of work going into improving the student environment specialist discussion groups Formal and informal talks Social activities