Progetto CMS RPC: Preventivi 2017

Slides:



Advertisements
Similar presentations
Davide Piccolo INFN Napoli Muon Annul Review Cern 15 September 2003 Chamber Production QA/QC MUON ANNUAL REVIEW On RESISTIVE PLATE CHMABERS CERN, 15 September.
Advertisements

Pavia 25/11/2003Davide Piccolo INFN Napoli Status of assembling and Chamber results at HT Pavia 25/11/2003 Davide Piccolo.
Status of the LHCb RPC detector Giovanni Carboni - Roma 2 Introduction Detector requirements Ageing tests Oil vs. No-Oil Conclusions Report to LHCC - March.
Status of the LHCb RPC detector Changes with respect to Note cm strips instead of 3 cm (cost optimization) All gaps same size (standardization)
G. Carboni - Open LHCC - July 2001 Technical Design Report for the LHCb Muon System Giovanni Carboni on behalf of the Muon Group Part II: RPC Detectors,
ATLAS RPC: Cosmic Ray Teststand at INFN Lecce G. Chiodini, M. Bianco, E. Brambilla, G. Cataldi, R. Coluccia, P. Creti, G. Fiore, R. Gerardi, E. Gorini,
Davide Piccolo - INFN NapoliSIENA maggio 2004 Production and Quality control of RPCs for the CMS muon barrel system Davide Piccolo – INFN Napoli.
Mauro Raggi Status report on the new charged hodoscope for P326 Mauro Raggi for the HODO working group Perugia – Firenze 07/09/2005.
WP2: Detector development Summary G. Pugliese INFN - Politecnico of Bari.
RPC Trigger ESR Warsaw 08 July 2003 F. Loddo I.N.F.N. Bari Status report on RPC FEB production Status report on RPC Distribution Board Interfaces RPC-LB.
RPC project status report RPC IB meeting 28 June 2011 Pigi Paolucci.
P. Paolucci - I.N.F.N. di Napoli 1 MTCC meeting May 06 HV & LV status DELIVERED AT BLG /60  67% of the A3009 (LV) 6/40  15% A3512N (HV) 10/10 
Tariq J. Solaija, NCP Forward RPC EDR, Tariq Solaija Forward RPC EDR The Standard RPC for low  regions Tariq J. Solaija National Centre for.
Barrel Endcap The RPC System Baseline Six stations in the Barrel Four station in the Endcap up to  = 2.1 Baseline Six stations in the Barrel Four station.
RPC detection rate capability ≈ 1/ρ Float-Glass ( Ω-cm) RPC rate capability < Bakelite( Ω-cm) one. New kind of doped glass was developed.
Barrel RPC Chamber consists of 2 double-gaps, each equipped with a common plane of 96 strips read-out by 6 front-end boards. The two double- gaps have.
1 RPC project Upgrade Anna Colaleo (INFN-Bari) on behalf of Bari (Resp.D.Creanza), LNF (Resp.S. Bianco), Naples (Resp.L. Lista), Pavia (Resp.P. Vitulo)
G. Pugliese RPC requests for GIF++ G.Pugliese, N. Zaganidis and I. Pedraza on behalf of the RPC group 1.
Gap Production for Upscope of the Endcap RPCs Sung Keun Park Korea Detector Laboratory Korea University February 5, 2010 Workshop on the Forward CMS RPC.
Motivation General rule for muon triggers: Never neglect a possible backup reduction factor. It will always come back to you. Even if RPC trigger works.
T. Kawamoto1 ATLAS muon small wheels for ATLAS phase-1 upgrade LHCC T. Kawamoto (New) small wheels ? Why new small wheels for high.
Progress on the beam tracking instrumentation Position measurement device Tests performed and their resolution Decision on electronics Summary.
MoA and M & O-B Pigi Paolucci. Introduction The RPC endcap and barrel project were merged in an unique project in the 2009 and so we don’t have a long.
Results from the CMS-RPC tests at CERN Gamma Irradiation Facility Roberto Guida CMS-RPC (Bari, Beijing, Napoli, Pavia, Sofia) Seoul, October 2005.
Phase 2 muon plenary, 11-Feb-2015 Jay Hauser  Based on three main arguments:  Age/reliability  Radiation tolerance  Maintainability  Bonus: L1 trigger.
General Muon Meeting, 03-March-2014 Jay Hauser “Update on Phase 2 muon Technical Proposal”  Recent developments:  ME0 inserted into HGCAL as for other.
Pigi Paolucci & Anna Colaleo – RPC project 2012 RPC M&OB scrutiny Anna Colaleo (INFN-Bari) RM Pierluigi Paolucci (INFN-NA) PM 1.
Marcello Abbrescia RPCs for CMS during Phase II RPC rate capability M. Abbrescia, The dynamic behaviour of Resistive Plate Chambers, NIM A 533 (2004) 7–10.
NSS2006Shengli Huang1 The Time of Flight Detector Upgrade at PHENIX Shengli Huang PHENIX Collaboration Outlines: 1.Physics motivations 2.Multi-gap Resistive.
CMS – RPC GIF++ G. Pugliese on behalf of the RPC Collaboration 1.
The Phase-1 Extension of the CMS Endcap RPC System Michael Tytgat on behalf of the CMS Collaboration Outline :  Introduction  RPC Upgrade  Simulation.
CMS Muon detector from LHC to HL-LHC Pigi Paolucci INFN Napoli 1P. Paolucci (CMS group of Napoli) - Jan 2015.
EPS HEP 2007 Manchester -- Thilo Pauly July The ATLAS Level-1 Trigger Overview and Status Report including Cosmic-Ray Commissioning Thilo.
Operation, performance and upgrade of the CMS Resistive Plate Chamber system at LHC Marcello Abbrescia Physics Department - University of Bari & INFN,
Imad Laktineh IPN-Lyon On behalf of the CMS muon group
P. Paolucci G. Pugliese M.Tytgat
(University of Sofia “St. Kliment Ohridski”)
University of Wisconsin
Results achieved so far to improve the RPC rate capability
Production ad Quality control of RPCs for the CMS muon barrel system
Atlas: Upgrade Phase I Massimo Della Pietra.
A proposal to equip the high eta muon stations with High Rate GRPC
RPC built a new plastic (peek doped with CB)
CMS muon detectors and muon system performance
Optical data transmission for
Jan Królikowski Warsaw University
Electronics for RPC Upscope
Results from a preliminary analysis of the MWPC test at the GIF
To do list production organization and commitments
Anna Colaleo - INFN-Bari On behalf of the CMS Muon group
RPC HV&LV systems Introduction Detector description Requirements
Pierluigi Paolucci - I.N.F.N. Naples
Conceptual design of TOF and beam test results
Pierluigi Paolucci - I.N.F.N. Naples
RPC HV&LV status Introduction HV power supply tender
RPC Detector Control System
RPC Detector Control System
RPC Detector Control System
Dr. Pierluigi Paolucci - INFN di Napoli
RPC Detector Control System
RPC Detector Control System
RPC HV-LV project Introduction System requirements and description
RPC HV-LV project Introduction RPC description Requirements
on behalf of Barrel RPC Collaboration
11th Pisa meeting on advanced detectors
Resistive Plate Chambers performance with Cosmic Rays
HV & LV status DELIVERED AT BLG /60  67% of the A3009 (LV)
RPC HV-LV project Introduction System requirements and description
RPC Detector Control System
LIP and the CMS Trigger Upgrade On behalf of the LIP CMS Group
Presentation transcript:

Progetto CMS RPC: Preventivi 2017 Davide Piccolo On behalf of Bari, Frascati, Napoli, Pavia Roma 09/09/16

CMS RPC system RPC present system Covers 0 < |h | < 1.6 1056 chambers 110,000 electronic channels and 3500 m2 of active area Double gaps gas chamber: 2 mm gas width Bakelite bulk resistivity: r = 2 - 5 x 1010 cm Strip width: 1 − 4 cm. Gas mixture: C2H2F4 + isoC4H10 + SF6 (40% of H) 95.2% 4.5% 0.3% Operated in avalanche mode 4th station installed in 2013-14 RPC upgrade: Installation of improved RPC in the RE4-1 and RE3-1 stations 72 chambers in total (1/2 of RE4-2/3 project) Roma 09/09/16

Roma 09/09/16

CMS RPC: 2016 operations RPC successfully participated in all LHC collision Runs All lumi sections (LS) have been marked as good (a part for LS during first two RPC calibration runs) No down time assigned to RPCs Fraction of active channels: 98.3% RPC trigger: Overlap region: RPC hits included and triggering Barrel region: RPC hits included in the firmware RPC BX used RPC only trigger under validation Leaks under observation: 43 leaky chambers (intervention during EYTS are man power expansive) Roma 09/09/16

CMS RPC: Efficiency Roma 09/09/16

Full agreement with expectations CMS RPC: Performance Full agreement with expectations Roma 09/09/16

CMS RPC background New shielding Reduced rate: mainly in endcap Roma 09/09/16

CMS RPC: HV calibration 2016 Roma 09/09/16

CMS RPC: milestones 2016: Funzionamento del sistema RPC a 13 TeV con prestazioni paragonabili a 8 TeV 2017: Presa dati stabile del sistema RPC alla luminosità' nominale di LHC (31-12-2017) 100 % Roma 09/09/16

Timeline for phase2 2 years for the final design 2.5 years for preproduction 2 years for service installation 3 years for production and installation 10 Roma 09/09/16

riunione CMS Italia - 6/07/16 HPL vs glass Low-resistivity glass: material and supplier (Tsinghua U.) new to CMS; tunable resistivity,1010Ωcm (or lower) achieved; no oiling procedure needed; no humidification of gas mixture; limited sizes only HPL/bakelite: material and supplier (Puricelli, General Tecnica, INFN) known to CMS; present system 1-5x1010Ωcm, but 0.5-1x1010Ωcm may be achievable; typical CMS sizes are no problem 1.6mm double-gap HPL RPC, irradiated @ GIF++ max. γ rate at the test position ~ 1.5 kHz cm-2 150 GeV π,μ beam @ SPS, H2 (Jun. 2015) Rate capability established with small beam spot, for low-resist. glass chambers (single-gap !) Rate capability established > 1.5 kHz cm-2, for both HPL and low resist. glass RPC riunione CMS Italia - 6/07/16

Front-end electronics Present CMS RPC endcap front-end board has important draw-backs: it’s old in terms of design and components, difficult to reproduce 32 channels only in present layout (4x 8ch. ASIC) connection to strips via coaxial cables noisier compared to newer SiGe technology LVDS out LVDS out LV, I2C strips strips Baseline solution includes new front-end electronics, lower noise level, higher sensitivity, higher granularity HARDROC2 chip under study: 3 shapers 3 discriminators low power consumption Possibility to include TDC R&D ATLAS_CMS in corso anche nell’INFN Lyon group riunione CMS Italia - 6/07/16

Consolidation of present system Link board system produced in 2006 Optical signal from GOL 1.6 Gbps (slow for modern receivers and FPGA) Big number of optical links CB and LB firmware frozen since 4 years No firmware developers Poland group not interested to maintain it for Phase 2 LB issue Plans to replace it in part or totally LB historically included in trigger project Different options under scrutiny Roma 09/09/16

ANAGRAFICA RPC CMS: 2017 Autori RPC CMS: 16 FTE totali: 15,5 Sezione Autori CMS (RPC) RPC (phase1) RD_Fase2 AIDA 1.7.2016 as June 2016 FTE   Bari 3 1,7 1,3 Frascati 2,1 1 Napoli 7 6,9 0,7 Pavia 0,9  TOTALE 16  11,6  3,9 Autori RPC CMS: 16 FTE totali: 15,5 Roma 09/09/16

RESPONSABILITA’ RPC CMS: 2017 Responsabilità RPC 2017   Sezione Nome Tipo Responsabilità m.u. BA Gabriella Pugliese RPC Subsystem Manager 6 LV1 LNF Davide Piccolo Responsabile Studi eco-gas 2 LV3 Stefano Bianco Responsabile GGM PV Na Salvatore Buontempo Mu Technical Coodinator + RPC tech coordinator 5 LV1 + LV2 Pierluigi Paolucci power supply RPC Orso Iorio DB coordinator Filip Tyssen DAQ RPC Roma 09/09/16

RICHIESTE MISSIONI RPC CMS: 2017 Sezione Autori RPC RD_Fase2 AIDA MI metab 1KE/FTE ME TOT MI+ME CMS (phase1) (RPC)   1.7.2016 as June 2017 FTE metab respons EPR RD_fase2 TOT ME K€/m.u. TOT miss m.u. K€ 1 m.u./FTE 1.5 mu /autore (phys+tech) Bari 3 1,7 1,3 6 4,5 1 2 16,5 4,05 66,825 69,825 Frascati 2,1 3,1 4 0,5 13,1 3,7 48,47 51,57 Napoli 6,8 0,7 7,5 11 9 33,5 3,95 132,325 139,825 Pavia 0,9 1,8 7,3 27,01 28,81 TOTALE 16 11,5 3,9 15,4 21 22.5 7 70,4 274,63 290,03 CMS: Richieste tecnici 3,5 mu (maintenance: HV-GAS-Elettr.) e fisici RPC 1 mu (sensori) Fase2: Richieste tecnici 2,5 mu (GIF++ - mockup) e fisici RPC 4,5 mu (GIF++ - mockup) Roma 09/09/16

RICHIESTE CONSUMI RPC CMS: 2017 Sezione Autori CMS (RPC) RPC (phase1) RD_Fase2 AIDA CONSUMO 1.7.2016 as June 2016 FTE metabolismo auto consumi M&OB SJ Tot consumi   1.5 K€ /FTE Bari 3 1,5 1,3 4,2 Frascati 2,1 1 4,65 4 65 73,65 Napoli 7 6,9 0,7 11,4 18,4 Pavia 0,9 2,7 Total 16 3,9 98,95 A parte metabolismo e M&OB Richiesta 3 Keuro su Napoli per connettori HV Juppiter Roma 09/09/16