ELCITA UPDATE April 2017.

Slides:



Advertisements
Similar presentations
1 Beachcomber Bay Sewer Lift Station Homeowners believe a better solution is available for both the City and the Homeowners.
Advertisements

Progress and Status COMPANY SWITCHES INSTALLED A/V CABLE INSTALLED THEATRICAL CABLE INSTALLED ORCHESTRA LIFT IS OPERATIONAL STAGE.
ANGELONIA AGRI TECH PARK Call us
Lighting Automation LLC 800-LED Lighting Automation Smart Lighting Systems.
Development of Sanitary Landfill and Capping of Existing Dump site at Mysore
Cost Estimation System Tool
6 th Street Water Main And Street Reconstruction 2013.
Briefing on Cape Town’s Integrated Rapid Transit System 2009.
District 2 System Preservation Projects for FY 14 and FY 15 Gregory B. Holsey - District Engineer Thomas S. Revelle - Assistant District Engineer – Project.
Management training Jumeirah beach residence sector 3 Presented by November 15 th 2006.
August 7, 2013 Luke Lortie, EIT Jerry Auge, PE
RAJA PRIME GARDEN Designer villa plots M/s. RAJA HOUSING LTD.,
MODERN VENTURES (Pty)Ltd t/a NORTHERN GATEWAY CITY PORTION 2 OF 36-NQ
VTA Light Rail System and Safety Enhancements MTC Railroad Crossing Seminar May, 21, 2008.
March 31st and April 1st, 2009Mile High Industrial and Automation Conference The Challenges in Upgrading Plant Automation for an Existing Wastewater Treatment.
ROSHNI PROJECT “THE VARIOUS ECO-FRIENDLY PRACTICES AND SPECIAL ENVIRONMENTAL MEASURES TAKEN UP IN THE RAJ BHAVAN, BHOPAL”
1 Environmental Sustainability: Need for Action – BEL Perspective Rajiv Mohan Rao, Bharat Electronics.
21 st Sep Election Process July & August
ELCITA Update 25 th August Update – Estate Management E – Toilets 8 e-toilets operational and work order placed for 4 more e-toilets Under Ground.
October E – Toilets 8 e-toilets operational and work order placed for 4 more e-toilets. Under Ground Drainage System Completed & Tender Published.
Greetings from Spa Eco City & the creators of Frangipani Country Estates!! Greetings from Spa Eco City & the creators of Frangipani Country Estates!! 1.
Core Strategy Dublin City Development Plan
Newport Boulevard Modification From Via Lido to 30 th Street Coastal Development Permit No Thursday June 11, 2015.
February Skywalk Contract Awarded to M/s mayaPRAXIS to provide Architectural & Structural feasibility report of Skywalk system for Electronics.
November E – Toilets 8 e-toilets operational and 4 more e- toilets work in progress. Under Ground Drainage System Completed & Tender Published.
Bengal Shapoorji Housing Development Pvt. Ltd. Presents Lavish Real Estate Properties In Kolkata.
Approve Change Order No. 4 for the Caylor Wholesale Meter Modification Item 4B.
June Skywalk M/s mayaPRAXIS have submitted the draft report - Preliminary Feasibility Study on Skywalk system for Electronics city phase 1. E.
Bengal Shapoorji Housing Development Pvt. Ltd. Presents Shukhobrishti: Luxury Residential Flats.
White Pigeon Community Schools
Surviving through Downtown Construction
We would like to list below an update on the Progress of the Project.
ELCITA UPDATE February 2017.
ELCITA UPDATE March 2017.
ELCITA UPDATE JULY 2017.
ELCITA Update December 2015.
ELCITA UPDATE January 2017.
Review of Implementation of Smart Cities Mission
ELCITA UPDATE AUGUST 2017.
ELCITA UPDATE November 2016.
Review of Implementation of Smart Cities Mission
ELCITA Update May 2016.
ELCITA Update April 2016.
Review of Implementation of Smart Cities Mission
Highveld Industrial Park Workshop No. 5 Information Memorandum
SKYWARDS TECH PARK.
We would like to list below an update on the Progress of the Project.
ELCITA UPDATE SEPTEMBER 2017.
ELCITA UPDATE October 2016.
ELCITA UPDATE August 2016.
Condominiums Community
Udaipur Smart City SUMMARY OF PROGRESS
ELCITA UPDATE November 2017.
Electronics City Industrial Township Authority
ELCITA Update March 2016.
ELCITA UPDATE March 2018.
ELCITA UPDATE April 2018.
We would like to list below an update on the Progress of the Project.
ELCITA UPDATE July 2016.
ELCITA UPDATE December 2016.
PRESENTS RAKSHA GREENS.
ELCITA Update January 2016.
25th Avenue Grade Separation
25th Avenue Grade Separation
ELCITA UPDATE September 2016.
A133 IPSWICH ROAD SCHEME COMMUNICATION UPDATE ( )
ELCITA UPDATE June 2019.
ELCITA UPDATE August 2019.
ELCITA UPDATE July 2019.
ELCITA UPDATE April
Presentation transcript:

ELCITA UPDATE April 2017

Smart City Project Initiatives for Test bed M/s Velankani (By Design) have provided 50 Nos of 5 MP Cameras. 14 have been installed & the balance installation is in progress.

Smart City Project Initiatives for Test bed 58 Nos of Modified Street light poles have been erected on Infosys Avenue & Pump house road.

Smart City Project Initiatives for Test bed 2 more Smart Water Meters has been supplied by M/s GAIA integrated with TCL network.

Smart City Project Initiatives for Test bed Environment Sensor Monitoring : Air Quality Temperature Humidity Ambient Light Sound CO2 NO2 (PAQS)Personal Air Quality Systems Pvt Ltd

Smart City Project Initiatives for Test bed M/s Tejas Network have provided Network design for the Pilot ring main from ELCITA office Via Lord Plaza, Paramount, BHEL & back. They are providing GPON switches for all the Camera poles. M/s Multiproe have started the Installation of Video wall at our command Centre. M/s Wipro Ltd are the integrated partner for Smart City Interface.

Smart City Project Initiatives for Test bed M/s P Park E have supplied 20 Nos parking sensors through LORA network & installation work is in progress. TCL have Supplied one LED street light fixture integrated with LORA Network. Configuration of other applications is in progress apart from Switching On & Off.

LOCATION MAP FOR RELOCATING SKYWALK FROM HP to ELECTRONICS CITY SIGNAL (from West Phase to East Phase)

PROPOSAL FOR RELOCATING SKYWALK FROM HP to ELECTRONICS CITY SIGNAL (from West Phase to East Phase)

PROPOSED 400 KLD STP at KSSIDC COMPLEX

Estate Management Modification of existing street light poles with LED lights, Splitters, Camera, Advertisement Board, etc West Avenue 1 –Infosys avenue West Avenue 7 – Wipro Neeladri Road West Avenue 8 – Pump house Road West Avenue 9 – Petrol Bunk Road E – Toilets 20 e-toilets Installed & Operational Estate survey Software Training work in progress

Footpath – Completed East Avenue 1 (TCS Road) East lane 1(Hical Road)

Footpath & Drain Works – Under Progress West Avenue-9 (Petrol Bunk Road) - Completed West Avenue-8 (Police Station Side)

Wet Mix Laying – East Avenue 1 Road Works – Under progress Wet Mix Laying – East Avenue 1

Culvert Works – Completed RCC Culvert opp SYSCON West Avenue 8 RCC Culvert Opp Namtech – West lane 1

Footpath Works – Under Progress RCC drain (XIME)– East Avenue 2 RCC drain (Siemens)– West Avenue 1

Fabrication Work– Completed Barbed Wire Fencing – East Avenue 2 Providing SS Bar screen at Equalization Tank (300 KLD STP)

Footpath using Old Kerbstone (Pump House) Footpath & Drain Works – Under Progress RCC Slab (West lane 1) Footpath using Old Kerbstone (Pump House)

Drain & Compound wall Works – Under progress Drain work– West Lane 12 (Arvind Mills Road) Compound Wall– Pump House

Sump Works – Under Progress 3KL Capacity UG Sump for E- Toilet (Below Fly over East Phase) 3KL Capacity UG Sump for E- Toilet (Edizi Tools)

Sump Works – Under Progress 3KL Capacity UG Sump for E- Toilet (HP Avenue) 3KL Capacity UG Sump for E- Toilet (BWSSB)

Sump Works – Under Progress 3KL Capacity UG Sump for E- Toilet (We school) 3KL Capacity UG Sump for E- Toilet (Tech Mahindra)

Road Marking – Completed Road Side lane, Speed Hump & Pedestrian Marking (Electronics City West & East Phase)

Direction Signage Board– Completed

Fabrication Work– Under Progress Providing Chequer Sheet Cover to Avoid Smell going to the nearby companies

Construction of 7KLD STP ESBR Technology at ELCITA office 7KLD STP– Under Progress Construction of 7KLD STP ESBR Technology at ELCITA office

Jan - 32tons sold Feb - 37 tons sold March - 41 Tons dry waste sold Improvement in quantity of dry waste sold after Conveyor. Jan - 32tons sold Feb - 37 tons sold March - 41 Tons dry waste sold

Compost Santhe organised by GoK Was part of 40 participants at Vidhana Soudha Stall was visited by the chief minister. Sold compost and got contacts for compost sales.

Earth day initiatives Seized single use disposables at E-city were used to create awareness around E-city for non usage. Tree plantation at Maragondanahalli lake and also installation of solar lights.

Estate Management Contract Awarded Proposed construction of Drains, laying of Pavers, Kerb stones and Drain cover slabs from Xime Junction to Tata power rear gate & TCS Gate no 2 to Edizi Tools junction (East Avenue 2 & 4), East Phase Providing and laying of Asphalting using 60/70 grade bitumen from Edizi Tools to TCS gate no 3 via Y-Junction, (East Avenue 1& 4). East Phase Along Café Corner & JP IT Park Road

Estate Management Contract Published Modification of existing street light poles with LED lights, Splitters, Camera, Advertisement Board, etc Providing House Keeping Services to ELCITA within e-city Industrial Township Area.

Estate Management Contracts on Anvil Construction of Concrete Drains, laying of Pavers, Kerb stones and Drain cover slabs Erkadi System to Arvind Mills (West Phase) Construction of 400 KLD STP in KSSIDC Land, West Phase. Construction of 500 KLD STP in KIADB Land, East Phase. Replacing the Existing RMU with New Compact RMU near M/s BHEL Ltd.

Thank You