BE/CO Changes in LS1 to the Software Development Infrastructure and Widely Used Libraries Chris Roderick, Greg Kruk, Katarina Sigerud, Luigi Gallerani,
Advertisements

FESA 3 Implementation Status Stephane Deghaye BE/CO On behalf of the FESA team and many users.
FESA Vs 2.0 AB/CO TC - 12 Feb July 2004 FECOMSA FESA2 2.0β.
Session 8 - Long Shutdown 2 Strategy and Preparation LIU Planned Activities Reference : RLIUP Oct.2013 (indico) “Work Effort in the LHC Injector Complex,
Industrial Control Engineering Industrial Controls in the Injectors: "You (will) know that they are here" Hervé Milcent On behalf of EN/ICE IEFC workshop.
controls Middleware – OVERVIEW & architecture 26th June 2013
Christophe Delamare EDMS Accelerator Consolidation Workshop GS/ASE activities.
14 December 2006 CO3 Data Management section Controls group Accelerator & Beams department Limits of Responsibilities in our Domains of Activities Ronny.
Timing upgrades after LS1 Jean-Claude BAU BE-CO-HT1.
Accelerator Consolidation Workshop TE/EPC consolidation plan 2 Jean-Paul Burnet ACC consolidation day, 12/09/2013.
WWWWhat timing services UUUUsage summary HHHHow to access the timing services ›I›I›I›Interface ›N›N›N›Non-functional requirements EEEExamples.
Stephane Deghaye (AB/CO) ATC/ABOC days.
Draft for approval in ABMB, 4 Feb 08 Andy Butterworth Claude-Henri Sicard for the Controls Coordination Committee (CO3) 22 Jan 20081ATC/ABOC Days.
Consolidation and Upgrade of the SPS Electrical Networks Current Status JP. Sferruzza, on behalf of EN/EL.
Session 1 Introduction  What is RADE  Technology  Palette  Tools  Template  Combined Example  How to get RADE  Questions? RADE Applications EN-ICE-MTA.
Nov, F. Di Maio, M.Vanden Eynden1 CO Proposal concerning AB Front-End Software Responsibilities First detailed proposal based on the global Front-end.
CERN Control Standards Front-End Computer Layer Stéphane Deghaye BE/CO/FE
Controls Renovations and End of Life (EoL) plan of major components of the controls infrastructure Eugenia Hatziangeli.
Review of MPE activities during LS1 and outlook for LS2/LS3 View from BE/CO V.Baggiolini, M.Vanden Eynden On behalf of the BE/CO APS, DA, DO and FE Sections.
Drupal Service: Infrastructure Update 2 Marek Salwerowicz Sergio Fernandez ENTICE Meeting
26 Jan 06Marine Pace - AB/CO1 LEIR Controls : Gain of Experience for the Running-in of LHC Marine Pace on behalf of AB/CO and LSA.
Electronics issues for MTE Etienne CARLIER TE/ABT Outline: o CAMAC eradication o PPM limitations o Electronics & Controls for MTE only CT only CT-MTE hybrid.
LS1 Review P.Charrue. Audio/Video infrastructure LS1 saw the replacement of BI and RF analog to digital video transport Was organised in close collaboration.
Feedbacks from EN/STI A. Masi On behalf of EN-STI Mathieu Donze` Odd Oyvind Andreassen Adriaan Rijllart Paul Peronnard Salvatore Danzeca Mario Di Castro.
POST-ACCOR renovations until LS2 – DEBRIEFING – Marine Pace, CO3 – 17 September 2015 Input from Chris, Marc, Stephen, Stephane, Wojtek.
FESA S. Deghaye for the FESA team BE/CO. What happened since April? followed by “Our plans”
Stephane Deghaye (AB/CO) The InCA project - S. Deghaye Accelerator Complex Controls Renovation Workshop Motivations & Objectives.
Each converter 3 racks (fighting for 2?) Access from front and rear of each rack! 56 racks total + 6 racks Ethernet/control Existing RF equipment to be.
Industrial Control Engineering ADE Rapid Application Development Environment.
Industrial Control Engineering Session 1 Introduction  What is RADE  Technology  Palette  Tools  Template  Combined Example  How to get RADE 
Planned activities during (E)YETS… up to LS2 for PSB-PS equipment Etienne CARLIER On behalf of TE/ABT/EC.
Radio Frequency Andy Butterworth AB/RF Accelerator Controls Renovation WS 3 Dec 2008.
LS1 Review BE-CO-SRC Section Contributions from: A.Radeva, J.C Bau, J.Betz, S.Deghaye, A.Dworak, F.Hoguin, S.Jensen, I.Koszar, J.Lauener, F.Locci, W.Sliwinski,
PS Complex Controls Renovation S Baird AB/ABP ATC/ABOC Days: Session Jan 2008.
CERN/BE/CO – Claude Dehavay - Sept.2016 (with input from Z.Zaharieva and M.Vanden Eynden) 1.
Electrial Safety LS2 days November 2016 AP
LS2 Safety Preparation Thomas Otto, LS2 Safety Support Officer for LHC
YETS & LS2 Works EN-EL / Power distribution
BE-CO YETS 2015/2016 Planned BE-CO tasks during the YETS 2015/2016
Accelerator Controls Renovation Project “ACCOR”
IT Services Katarzyna Dziedziniewicz-Wojcik IT-DB.
Framework Schedule from EYETS 2016 to LS2
CONS and HL-LHC day Analysis of needs from BE-CO
Update on the Critical Path of the PS Booster Schedule for the EYETS
Controls & software Andy Butterworth.
PSB Lock Out Test, Follow-Up AP. Bernardes-/EN-STI, K
Introduction to RBAC Wojciech Sliwinski BE/CO for the CMW/RBAC team
Status and Plans for InCA
YETS & LS2 Works EN-El on LHC / Power distribution
R. Denz, A. Gomez Alonso, AT-MEL-PM
the FIRESTORM project Real-Time distribution of
BE-ICS Activities during the LS2 Period (15 min)
Injector De-cabling Project
Database Services at CERN Status Update
Injectors BLM system: PS Ring installation at EYETS
Javier Serrano CERN AB-CO-HT 29 February 2008
LAAWG Status Report – 15th May 2007
EC Activities Status for the LIU
YETS 2017 / 2018 Leszek Borakiewicz IT-CS-DO
Middleware – ls1 progress and planning BE-CO Tc, 30th september 2013
J. Uythoven for the MPE-MI & MS Teams
LSA/InCA changes during LS1
Renovation of the Accelerators Controls Infrastructure and its Assets Management Asset and Maintenance Management Workshop November 14th, 2013 Cl.Dehavay.
the CERN Electrical network protection system
HL Consolidation Day Analysis of needs from BE-ICS
GIS PORTAL RACKS Integration of Equipment Racks in the Geographic Information Service (SMB/SE) Olivier Barrière.
YETS & LS2 Works EN-EL / Power distribution
Overview & baseline of LS2 and roadmap for CRG
GIS Portal Racks Project
Deploying Exchange 2003 John Westworth SMS&P
Presentation transcript:

v4

BE-CO Activities during the LS2 period Stephane Deghaye (BE-CO) 7th & 8th November 2016 http://indico.cern.ch/event/564604/

Contents Software consolidation & renovation Post-ACCOR renovations Applications & database consolidation Hardware consolidation & renovation LHC WorldFIP infrastructure OASIS consolidation Timing renovation Other projects S. Deghaye (BE-CO) 7th & 8th November 2016 http://indico.cern.ch/event/564604/

Post-ACCOR renovations Renovation of low-level controls More than 900 front-end computers End-of-Life (EoL) of part of the Controls infrastructure Operating systems (LynxOS, 32-bit Linux) Real-time applications (FESA2, GM, SLEquip) Communication (RDA2) X/Motif applications S. Deghaye (BE-CO) 7th & 8th November 2016 http://indico.cern.ch/event/564604/

BE-CO’s EoL roadmap LS2: 2019-2020 LHC start 2015 2016 2017 2018 End of 32-bit machines End of RDA2 & PROXY End of GM & SLEQUIP End of XMOTIF End of FESA2 End of non InCA framework support End of FESA2 framework support End of FESA2 dev. tools support LHC start CTF stop 2015 2016 2017 2018 LS2: 2019-2020 S. Deghaye (BE-CO) 7th & 8th November 2016 http://indico.cern.ch/event/564604/

Post-ACCOR renovations - planning Eqp groups’ renovation roadmap compliant Require contributions from all eqp groups (10+) Some items on the critical paths (e.g. b-train) with tight planning Some items have to-be-validated technical solutions (high risk) Followed up & updated every 6 months in CO3 Non-InCA Java applications stop with CTF end of this year Plan: 10972, 10973, 10974, 10975, 10976, 10977, 10979 S. Deghaye (BE-CO) 7th & 8th November 2016 http://indico.cern.ch/event/564604/

Application & Database consolidation Public API changes (CALS, CCS, JAPC, LSA) New API available at LS2 start or even earlier (early 2018) Old API discarded at the end of LS2 Layout service – new system & tools Re-focus scope on pure layout data Empower users to manage their own data 1st version available early 2018 Plan: 10981, 10992, 10993, 10994 Renovate the DB (2003 - LHC only), renovate the obsolete tools. Scale by giving, to selected users, the data management activities Refocus the scope (layout only, not configuration etc) S. Deghaye (BE-CO) 7th & 8th November 2016 http://indico.cern.ch/event/564604/

Application & Database consolidation New database servers & storage New hardware for the database services LS2: installation and switch to new systems Suppression of COPUB public account Planning: gradual suppression until LS2 Suppression of ADECONTROLS database LS2: Complete deletion of account and tables Plan: 10983, 10990, 10991 S. Deghaye (BE-CO) 7th & 8th November 2016 http://indico.cern.ch/event/564604/

Hardware consolidation & renovation LHC WorldFIP infrastructure renovation OASIS consolidation Timing renovation Other projects S. Deghaye (BE-CO) 7th & 8th November 2016 http://indico.cern.ch/event/564604/

LHC WorldFIP infrastructure WorldFIP master renovation Deploy CERN-designed bus arbiters & software stack to replace Alstom’s solution. EYETS: install pilots LS2: full replacement Plan: 10822 S. Deghaye (BE-CO) 7th & 8th November 2016 http://indico.cern.ch/event/564604/

LHC WorldFIP infrastructure WorldFIP Cu/Opt repeater renovation Ageing Alstom repeaters replaced by in-sourced design (GOFIP) LS2: Complete renovation Plan: 10822 S. Deghaye (BE-CO) 7th & 8th November 2016 http://indico.cern.ch/event/564604/

OASIS consolidation Eradication of the VXI platform Replace 20+ y/o VXI digitisers by modern solutions EYETS/YETS: partial eradication LS2: Total eradication Plan: 10829 20 network sockets => day-to-day activity S. Deghaye (BE-CO) 7th & 8th November 2016 http://indico.cern.ch/event/564604/

OASIS consolidation Triggering network based on WhiteRabbit LS2: Complete trigger generation & reception Post-LS2: gradual switch to new infrastructure EN-EL: network topology being finalised Plan: 10821 8*10 network sockets => day-to-day activity S. Deghaye (BE-CO) 7th & 8th November 2016 http://indico.cern.ch/event/564604/

Timing renovation Timing pulse distribution renovation Replace 40 y/o pulse repeaters TS/EYETS/YETS: small installations LS2: complete renovation IT/CS: Missing resources Plan: 10795 Socket data provided (May’16 – B. Ninet) S. Deghaye (BE-CO) 7th & 8th November 2016 http://indico.cern.ch/event/564604/

Timing renovation Central timing network renovation Renovate the central timing network (aka GMT) with White Rabbit YETS: Deploy proof-of-concept LS2: new network deployed Post-LS2: slow migration to new infrastructure Plan: 10797 S. Deghaye (BE-CO) 7th & 8th November 2016 http://indico.cern.ch/event/564604/

Timing renovation Central timing’s external condition renovation Renovate unreliable legacy hardware with modern industrial solution Collaboration between BE-CO & BE-ICS LS2: complete migration Plan: 10799, new activity by ICS S. Deghaye (BE-CO) 7th & 8th November 2016 http://indico.cern.ch/event/564604/

Other projects Decabling project (EN-EL) Identification of obsolete BE-CO cables EYETS/YETS PSB: 634 cables to be removed PS: 2228 cables to be processed SPS: 265 cables to be removed (points 3 & 5) Plan: 10828 S. Deghaye (BE-CO) 7th & 8th November 2016 http://indico.cern.ch/event/564604/

Other projects SPS intercom Activity integrated in the Fire Safety Project by BE-ICS-AS Plan: 10982 S. Deghaye (BE-CO) 7th & 8th November 2016 http://indico.cern.ch/event/564604/

Other projects Replacement of TN routers & switches (IT) Critical activities Cost: 2 to 4 MCHF to be requested (consolidation) Plan: 10042, 10043 S. Deghaye (BE-CO) 7th & 8th November 2016 http://indico.cern.ch/event/564604/

Conclusions Post-ACCOR roadmaps compliant with EoL Followed-up in CO3 OASIS trigger renovation: info to EN-EL Timing pulse distribution: follow-up with IT-CS Some activities to be moved to BE-ICS (timing external conditions, SPS intercom) Consolidation budget to be requested for IT network equipment S. Deghaye (BE-CO) 7th & 8th November 2016 http://indico.cern.ch/event/564604/