NYP BEST PRACTICES CODE REVIEW: LIFE SAFETY Larry Borsinger, MBA

Slides:



Advertisements
Similar presentations
Project Quality Plans Gillian Sandilands Director of Quality
Advertisements

MONITORING OF SUBGRANTEES
Delivering Successful Facility Projects It Starts and Ends with You!
NOTICE SUBMISSIONS Requirements and Procedures 1.
Vendor Management September 7 th 2007 James Mahan, Vice President Yankee Alliance.
1 NYP BEST PRACTICES EXISTING CONDITIONS SURVEYS Presentation to Approved A/E Vendors to NYP June 17, 2013.
Randy Benson RHQN Executive Director May, Compliance Issues During Survey Compliance Officers monitor healthcare facilities (hospitals and clinics)
CODE REVIEW: DOH Article 28 Compliance Establishing a Feasibility process that is focused on compliance with New York State Department of Health rules.
January 16, 2014 Brad Keyes, CHSP Changes to the 2014 Acute Care & Critical Access Hospital Manuals on Life Safety Compliance.
NYP BEST PRACTICES Certificate of Need Process Angela Gonzalez-Perez
Licensing of Nuclear Power Plants in Pakistan
Define ● Deliver ● Sustain Sundar Chellamani Technical Director SysComm Project Management Ltd.
Project Close Out CTC-470.
NYP BEST PRACTICES MEP Design Standards/Equip Cuts/Drawing Review
ENGR ARIEL TAN MIRANDA, DFSE
Safety & Safety Documentation 2 3 Safety in three Questions Why ? Providing a safe workplace is a legal and moral obligation on every undertaking, and.
1 NYP BEST PRACTICES CODE REVIEW: LIFE SAFETY Larry Borsinger, MBA Director, Facilities Operations - Regulatory Compliance Sukhjit Tom Singh, MHA, MPH.
The Second Survey Point of Vulnerability How Should I Prepare for the Facility Tour? Healthcare Engineering Consultants.
Commissioning of Fire Protection and Life Safety Systems Presented by: Charles Kilfoil Bechtel National Waste Treatment Plant Richland WA.
Section 2 Capital Project Life Cycle. PROJECT PHASES Project development تطوير المشروع Turn Over التسليم والضمان Detailed design التصميم التفصيلي Preliminary.
DSA 101 July 2010 Plan Approval Process for the Career Technical Education Facilities Program (CTE)
Understanding TJC 2009 Life Safety Code Chapter
Code Officials and the Code Process.  To design the interior of the building in conjunction with codes, standards and federal regulations required in.
Part 2: Meeting the Challenges of the Four Survey “EC Vulnerabilities” Healthcare Engineering Consultants Preparing for the Unscheduled Survey.
1 Copyright © 2011 by Mosby, Inc., an affiliate of Elsevier Inc. Chapter 7 Health Care Regulatory and Certifying Agencies.
International Atomic Energy Agency Roles and responsibilities for development of disposal facilities Phil Metcalf Workshop on Strategy and Methodologies.
WMATA Project Implementation Manual (PIM) Stage 3, Construction Chapter 200, Authority Representative, Responsibilities and Functions Presenters: David.
Code Officials and the Code Process.  Concentrates on the code process as a whole.  Different type of code officials  Various steps that are taken.
Certificate of Need Process NYP Best Practices for Architects & Engineers May 2, 2016 Angela Gonzalez-Perez Director, Regulatory Planning.
1 Existing Conditions Survey/Field Verification For Article 28 Space Best Practices May 2016.
Clinical Trial Billing and Patient Remuneration
SCALF Annual Reporting
Presenter: Igna Visser Date: Wednesday, 18 March 2015
The Regulatory Process
CODE REVIEW: DOH Article 28 Compliance
NACCHO Program Standards Mentorship
Session objectives After completing this session you will:
Existing Conditions Survey/Field Verification For Article 28 Space
NYP BEST PRACTICES Certificate of Need Process Angela Gonzalez-Perez
Certificate of Need Process
The Information Professional’s Role in Product Safety
FDA’s IDE Decisions and Communications
Washington State Department of Health
Commissioning at NYP Joseph Lorino, PE, LEED Vice President
NYP BEST PRACTICES MEP Design Standards/Equip Cuts/Drawing Review
Clinical Engineering Lecture (3).
Global Connections Day Building Safety Service Provider
Rail Safety Worker Engineering and Design Competency
FIVE YEAR CAPITAL FACILITIES PLAN (Five Year Plan)
SCD Grants & Contracts Policy & Procedure 670.
Great Plains Telehealth Resource & Assistance Center
Life Safety Drawing Template
Multisite Human Subjects Research
Survey Readiness RIDEOUT HEALTH Kimberly Black
How to Submit Waivers and Equivalencies October 18, 2016
Division of Long-Term Services and Supports
WHAT TO EXPECT: A CROWN CORPORATION’S GUIDE TO A SPECIAL EXAMINATION
Chemical Purchasing.
LESSONS LEARNED NYP Design and Construction NYP BEST PRACTICES.
The Process for Final Approval: Ongoing Monitoring
Pre Construction Risk Analysis
How to conduct Effective Stage-1 Audit
NYP BEST PRACTICES EXISTING CONDITIONS SURVEYS
Emergency Preparedness Requirements
GO Guided Programs Group Faculty/Staff Lead Programs Abroad
13 Managing Medical Records Lesson 3:
Research Operations and Lab Services
Right of Way Certification
Aerodrome Certification Workshop
Office of Grants and Contracts Presenter: Stephanie Chandler-Thompson
Presentation transcript:

NYP BEST PRACTICES CODE REVIEW: LIFE SAFETY Larry Borsinger, MBA Director, Facilities Operations - Regulatory Compliance Sukhjit Tom Singh, MHA, MPH Field Director, Facilities Operations - Regulatory Compliance

Hartford Hospital Fire 1961 http://www.youtube.com/watch?v=76mo_UkGAAM&feature=youtu.be http://www.youtube.com/watch?v=76mo_UkGAAM&feature=youtu.be

NYP Eye Institute 5/18/2009

NYP Regulatory Portfolio Profile Basic Building Information Total # Buildings: 48 Total Square Feet: 7.6 M Total Beds: 2,331

Background & Significance Safety: Vast majority of in-patients are incapable of self-preservation and rely on the building features/systems to protect them from the risks of fire & smoke. Regulatory: Hospitals must be designed to protect patients, staff and visitors. Requirements are driven by various agencies: Centers for Medicare & Medicaid Services (CMS) New York State Department of Health (DOH) The Joint Commission (TJC) Fire Department of New York/White Plains Department of Buildings (DOB) Occupational Safety & Health Administration (OSHA)

Objectives Establish Roles/Responsibilities Define which projects require a life safety code analysis Describe the various life safety elements beyond the typical project envelope Review the process to prepare and submit life safety plans to NYP Understand the importance of delivering a code compliant facility

Roles/Responsibilities Facilities Operations Regulatory Compliance PM (FD&C) ORPPD Stonehill Taylor Architects A/E Team CM/GC

Roles/Responsibilities Facilities Design + Construction Management of the projects life safety scope and process Retain consultants Facilities Operations Regulatory Compliance Statement of Conditions (SOC) - List of known deficiencies Existing Life Safety Equivalencies/Waivers Review and comment on life safety documents ILSM review and checklist Review and comment Stonehill Taylor Architects as agent for NYP Current life safety documents Construction Class Code basis Certificate of Occupancy Review and approval

Roles/Responsibilities Office of Regulatory Planning & Policy Development (ORPPD) DOH submissions and reviews Existing licensing status Existing Waivers A/E Team Conduct a life safety code analysis of the project limits (fire/smoke compartments) as well the egress to the public way Develop Required Waivers and / or Equivalencies Ensure design & construction is according to code taking into consideration best practice (ie. Suites) Review Existing Conditions and Violations Record documents based on information from the contractor Contractor Pre-Construction: Probes, testing, etc. Pre Construction Risk Assessment (PCRA) Compliance Post-Construction: “Red line” documents to the AE team in order to create the record documents

Life Safety Code Analysis Applicable Projects DOH Projects Project limits plus egress path to public way Non-DOH Projects filed with DOB Project limits Cosmetic Upgrades Projects not filed with the DOB Code analysis is not required All elements of the project must meet fire and life safety codes and NYP requirements.

Process Obtain current life safety drawings from NYP document library as a reference only www.atginc.com Survey existing conditions relative to the life safety drawings Develop revised life safety drawings and code analysis relevant to the current project Submit for review, comment and sign-off by Stonehill & Taylor with each design phase Review and comment by Regulatory Compliance. Revise based on comments Submit record life safety drawings and code analysis electronically to the PM

Process Feasibility Identify work that will impact cost, schedule, scope in order to develop a project schedule and budget Deliverables Code Analysis Reconciled matrix of applicable codes/sections including but not limited to: Occupancy Classification Exit Stairwells (ie. 50/50 Rule) Travel Distance Patient Sleeping/Non-Patient Sleeping Suites Fire/Smoke Barriers/Doors Corridor Walls/Doors Existing conditions assessment Field verification relative to code requirements and current life safety drawings (Note: drawings provided by NYP represent expectations not field conditions. It is the responsibility of the consultant to confirm and determine the scope of work required to meet expectations and modifications to accommodate the project) Life Safety Plan Compliant Suites

Process Schematic Design/Design Development Confirm conditions and detail documents for cost, schedule and scope verification Construction Documents Complete life safety and interim life safety documents for agency submission Construction Phase Compliance with hospital’s PCRA procedures Post Construction Record life safety documents DOH Pre-Occupancy Survey