Treatment of Key Risks under EPC Contracts

Slides:



Advertisements
Similar presentations
DISCHARGE OF CONTRACT HOW A CONTRACT COMES TO AN END
Advertisements

1 CLIENT CONSULTANT AGREEMENT. 2 Negotiations Types of Consulting Contracts Standard Form of Contract Form of Contract General Conditions Special Conditions.
Construction Contracting
Contract Performance, Breach and Remedies Chapter 9.
4/28/20151 PRESENTED BY NAKABAGO JOHN CONTRACT MANAGEMENT AND ADMINISTRATION IPPU PRESENTATION JOHN NAKABAGO.
‘CHANGES IN LAW’ Contractual Provision September, 2012 Topic for discussion Business Confidential Foster Wheeler Iberia/Chile Sep/2012.
Best international practices – the ICC model contracts and changing circumstances.
6 th December 2003 Luthra & Luthra Law Offices1 Impact of Force Majeure on Contracts Presentation at the Indian Council of Arbitration By Mohit Saraf Partner.
Completion Outstanding work and Remedying Defects In order that the Works and Contractor's Documents, and each Section, shall be in the condition required.
17 th Contracting Squadron I n t e g r i t y - S e r v i c e - E x c e l l e n c e LETTER CONTRACTS 2k7 01 Dec 05 Train and deploy the world’s foremost.
Project Procurement Management
Bevan Brittan LLP- Highways Maintenance Contracts Nathan Bradberry, Senior Associate Johnathan Adams, Associate 6 November 2014.
Time for a new standard - AS General Conditions of Contract
ISLAMIC UNIVERSITY OF GAZA FACULTY OF ENGINEERING CIVIL ENGINEERING DEPARTMENT 20. Claim, Disputes and Arbitration [Construction Contract Administration]
ISLAMIC UNIVERSITY OF GAZA FACULTY OF ENGINEERING CIVIL ENGINEERING DEPARTMENT Defects Liability [Construction Contract Administration] Chapter 11.
LOGO October The Employer FIDIC 1999 dasdas Supervisor: Dr.Kamalain shaath Done by: Mahmoud Abu Kmail Construction Contract Administration ENGC.
TRANSACTION AND INDUSTRY REVIEW CONFERENCE NIGERIAN POWER SECTOR REFORM: AN OVERVIEW OF TCN AGREEMENTS.
International Federation of Consulting Engineers FIDIC FIDIC Contracts and Infrastructure Development Athens, 28 March 2012 Dr William Godwin Barrister,
Insurance provisions under JCT 1998 and JCT Standard Building Contract 2005 Brian Lewis – QBE CAR.
Mikael Wahlgren NCC Construction Sverige AB ESCL Conference August 25th 2006 – Risk in Construction and how to deal with them. Duty for the contractor.
Contract Type Selection Don Shannon
Indefeasible Right to Use Agreements (IRU’s): Key Legal Considerations
A SOUND INVESTMENT IN SUCCESSFUL VR OUTCOMES FINANCIAL MANAGEMENT FINANCIAL MANAGEMENT.
Date: 16 April 2010 Adapting FIDIC Standard Forms for Local Conditions and Regulations TCDPAP Annual Conference - '‘New Approaches and Solutions for Consultancy.
Strategic Planning : The best way to manage EPC Contract Risks Pankaj K Sinha Abu Dhabi 17 th Nov 2014.
Compensation events and claims Presented by Prof. Khem Dallakoti.
Richard E. Thompson II, Esq.
General Condition THE EMPLOYER Construction Law Supervised By : Dr. Kamalain Shaath Prepared By : Eng. Fawzy El.farra.
Chapter 12 Contract Discharge and Remedies for Breach.
Angelica R. Armenta FAR Study Group – Jan Only contracting officers acting within the scope of their authority are empowered to execute contract.
April 19, 2001L&L/MDI1 Impact of Force Majeure On Contracts Presentation by Mohit Saraf Partner Luthra & Luthra Law Offices.
Contract Performance In Traditional and E-Contracts; Breach of Contract and Remedies Chapter 18 & 19.
Change Orders, Extras and Claims Presented by Geoffrey Cantello, City of Ottawa.
By Khalil T. Hasan Construction Solutions ( Joint Operation/Administration of multiple FIDIC Forms – A Case Study.
HOW TO PROTECT YOUR INTEREST IN A SALE CONTRACT Focus on what you “get” when you sign!
1 Details of the Sword Contract Kick-off meeting Autonomous Province of Trento Trento, December 18-19, 2014 SWORD (School and WOrk-Related Dual learning)
Presented to: By: Date: Federal Aviation Administration Ready for Cost Type Contracts - Accounting Systems and Administration Small Business Vendor Day.
EFCA Annual Conference 2016, 02–04 June 2016, Sofia, Bulgaria Application of FIDIC CC for EU- Funded Projects in Bulgaria Assen Antov Transport Engineer.
The Professional Indemnity Insurance Policy and the Insurance Act 2015
Amendments to the Public Works Contracts
Procurement and Contract Management Training
Profession Practices (ECIV-5105)
Introduction to FIDIC - Manuals
1st ICC Africa Regional Arbitration Conference
Administration of a FIDIC Contract - Project Control
Administration of a FIDIC Contract - Commencement Date to + 28 Days -
Bills of Quantities Introduction to FIDIC - Bills of Quantities -
Particular Conditions of Contract & Appendix to Tender
EPA CONTRACT TEMPLATE Overview
Drawings Introduction to FIDIC - Drawings -.
Administration of a FIDIC Contract - Financial Management
12.2 Conduct Procurements The process of obtaining seller responses, selecting a seller and awarding the contract The team applies selection criteria.
The subcontract template
INTERCONNECTION GUIDELINES
Administration of a FIDIC Contract - Award to Commencement -
EPA SUBCONTRACT TEMPLATE Overview September 2017
CERN-ITER Workshop CERN Procurement Anders Unnervik 16 Jan 2017
Types of contract selection based upon following:
Particular Conditions of Contract & Appendix to Tender
Makerere University Investors Conference
BIDDING DOCUMENTS AND MAIN FEATURES
ESCL – ANNUAL CONFERENCE 25 OCTOBER 2018 EDWINA UDRESCU, FCIArb Lawyer
Avv. Roberto Panetta LL.M. Ph.D. ISCL Secretary General
Unique General Conditions of the Alabama Building Commission (ABC)
Construction Contract Administration
Export Controls – Export Provisions in Research Agreements
Order 600/2017 – The issue and the potential exits
Grant Implementation Agreement (GIA)
Luxembourg Workshop on Space and Satellite Communication Law,
5626 BESG Construction Contracts
Presentation transcript:

Treatment of Key Risks under EPC Contracts Global EPC Contract & Risk Management Conference London, 6 -7th October Jonathan Hosie Partner Mayer Brown International LLP

Treatment of Key Risks under EPC Contracts What I will cover today: Legislative Change - from tender price to contract award and beyond - key considerations for the employer and the contractor Force Majure - when does it apply - treatment strategies Design Development and Conversion Mechanisms - from Feasibility Study to FEED and contract price - for the conversion of cost - reimbursable to lump sum turnkey price

Legislative Change A change in legislation could potentially affect the contract price and the contract schedule for delivery of the works under the EPC contract A change in legislation that occurs after the EPC contract has been awarded (or some specified “base date”) but before the works are complete Key Question: Who bears the burden of the price increase?

Legislative Change – setting the trigger level Change must affect the EPC contractor’s performance of its obligations but consider: only changes which have a “material” effect and/or which make performance “extremely costly” In deciding types of legislative change, consider: change which is “extraordinary, unforeseen or unforeseeable” changes in “judicial or governmental interpretation”

Legislative Change – FIDIC Contract If FIDIC Silver Book is used: “The Contract Price shall be adjusted to take account of any increase or decrease in Cost resulting from a change in the Laws of the Country (including the introduction of new Laws and the repeal or modification of existing Laws) or in the judicial or official governmental interpretation of such Laws, made after the Base Date, which affect the Contractor in the performance of obligations under the Contract. If the Contractor suffers (or will suffer) delay and/or incurs (or will incur) additional Cost as a result of these changes in Laws, made after the Base Date, the Contractor shall give notice to the Engineer and shall be entitled subject to Sub-Clause 20.1 to: (a) an extension of time for any such delay….. (b) payment of any such Cost, which shall be included in the Contract Price.” Base Date: "means the date 28 days prior to the latest date for submission of the Tender."

Legislative Change In the event of a change in law which affects the EPC Contract, consider the following: Specific provisions in the Contract, e.g. FIDIC 13.7 (Adjustments for Changes in Legislation) Arguments to consider where contractor’s tender is qualified The ‘Factual Matrix’ Retrospective effects of contracts Duty of good faith under civil law jurisdictions Reservation of Rights letter Doctrine of Superior Knowledge

Legislative Change – Employer/Contractor considerations Administration of the change in law event Notification and determination Employer able to discuss/disagree with contractor’s position Compromise between the parties employer reducing its own risk contractor being able to price the contract with accuracy allocating risk to the party best able to manage it

Force Majeure A Force Majeure Event: An unanticipated supervening event which is the fault of neither party and which prevents performance of the works. Civil law concept but often expressly by provided for in EPC contracts Clause 19.1 defines force majeure to include (but not limited to): “an exceptional event or circumstance (a) which is beyond a party's control, (b) which such party could not reasonably have provided against before entering into the Contract, (c) which, having arisen, such party could not reasonably have avoided or overcome, and (d) which is not substantially attributable to the other Party.” Qualifying terms but event must be within the (non-exclusive) list

Force Majeure Clause 19.1: sets out a non-exhaustive list of the kinds of events which constitute force majeure. Clause 19.2: the force majeure event must cause a party to be “prevented from performing any of its obligations under the contract”. Sub-Clause 19.6: provides an option for either party to terminate the contract on notice if the progress of the works is prevented for a continuous period of 84 days or multiple periods totalling over 140 days. Sub-Clause 19.7: can also terminate if impossible or unlawful to fulfil obligations, or governing law releases parties from further obligations.

Force Majeure Force Majeure and Local Laws Contract provisions are key but consider importance of local laws Certain civil codes do not permit exclusion of certain provisions National Oil Corp (Libya) v Libyan Sun Oil (US) Overall a Contractor will need to be able to prove that the event was beyond its control, did not arise out of circumstances which were in the contractor's knowledge, was not a circumstance which the contractor should have protected itself against at the time of entering into the agreement and the event prevented or hindered the contractor from complying with its obligations under the contract.

Force Majeure – Treatment in EPC Contracts Key Considerations: Has the event/circumstance “prevented” or “hindered” performance? Has the event/circumstance affected “compliance with a contractual obligation”? Does the event/circumstance fit into a specific Force Majure event? Do any relevant exclusions apply?

Front End Engineering Design (FEED) Design Development Feasibility Study Pre-feasibility and definitive feasibility studies Provision of a price estimate range (+ or – 20%) Front End Engineering Design (FEED) Further evaluation of the feasibility study by a contractor Achieving a more accurate price estimate (+ or – 10-15%) Contract price and EPC Contract Use of the same or different contractor for FEED and EPC stages Competition by use of a tender process or multiple contractors

Design liability vs design development FIDIC Silver Book design obligations (Clause 5) Design risk allocated to the contractor Specific design development clauses Additional considerations Distinguish between design development and approvals Distinguish between design development and variations Clear provisions for employer to reject/comment on changes Clear dispute resolutions provisions

Conversion mechanisms – typical life cycle with Decision Gates The above graph has been extracted from A Theoretical Framework to Enhance the Conversion Process in Convertible Contracts by Mohammad Moazzami, Reza Dehghan, George F Jergeas, Janaka Y Ruwanpura

Conversion Mechanisms Single set of contract conditions covering FEED and EPC contracts Conversion of the contract from a reimbursable cost contract (i.e. one where contractor paid on a fee basis for the work done) to a lump sum turnkey contract or turnkey EPC contract where contractor is paid a lump sum fixed contract price). In practice: Initial estimated price More price specificity as the FEED process continues Contract price proposed to employer at/near end of FEED process Evaluation/recalculation process if not agreed Option to terminate or instruct expert to determine Open book estimate

Conclusion and Re-cap Key risks associated with legislative change, how such changes will be dealt with and what to consider going forward Main elements of force majeure in EPC contracts and how force majeure clauses may be treated in practice The stages of the design development process and how this and design liability may be covered in contracts How conversion mechanisms work in practice.

Treatment of Key Risks under EPC Contracts Q&A