Mr. Vedprakash Maralapalle, Asst. Professor

Slides:



Advertisements
Similar presentations
LOGO APPLICATION OF A PARCEL. Agenda APPLICATION FOR PROJECT BUILDING OPERATIONS 1 ) Without help account application APPLICATION OF A PARCEL -- How can.
Advertisements

Construction Surveys
Basic Setting Out.
1 ANNOUNCEMENTS  Lab. 6 will be conducted in the Computer Aided Graphics Instruction Lab (CAGIL) Block 3.  You will be guided through the practical.
Theodolite: Introduction
Gable Roof BCGCA3007B.
Surveying Chain Surveying
Contour and Topo map Applications Profile View (Longitudinal Sections): Roads, Canals, Pipes,… Cross-Sectional View, Roads, Canals, Pipes, Building,…
CE 260 SURVEYING CHAPTER 5.
CHAPTER 3 LEVELING.
LINEAR MEASUREMENT.
SETTING OUT Horizontal Angles. Ensure instrument is set to measure angles in the appropriate direction. ( refer to operators manual) Unclamp both vertical.
TECHNIQUES IN BASIC SURVEYING
f30 G1 G A a F B E C D T F A1 A G G1 B C G A 50 G1 A1
Quadrilaterals.
At the right is a polygon known as a trapezoid. The two parallel sides (horizontal in this case) of the trapezoid are called bases. b1b1 b2b2 b2b2 b1b1.
Topic : Theodolite Traversing
SURVEYING PLANE TABLE SURVEYING 1. 2  Plane Tabling is a graphical method of surveying in which the field work and plotting are done simultaneously.
PLANE TABLE SURVEYING NUST Institute of Civil Engineering/Engr Muhammad Ammar.
PLANE TABLE SURVEYING SURVEYING – I
INSTRUMENTS USED IN PLANE TABLE SURVEYING.
Civil Department. GROUP MEMBERS GROUP MEMBERS:- ENROLLMENT NO. NAME OF THE STUDENT BURHAN ADENWALA PRIYANK AGRAWAL TAMANNA.
CIVIL DEPRATMENT.
Made by- Civil 3rd semester
GOVERNMENT ENGINEERING COLLEGE
VARIOUS METHODS OF PLANE TABLE SURVEYING
GOVERNMENT ENGG. COLLEGE B.E Semester III :- Civil Engineering
SANKALCHAND PATEL COLLEGE OF ENGINEERING, VISNAGAR PLANE TABLE SURVEYING PREPARED BY: PATEL AVANI B PANDYA RUCHA H CHAUHAN.
BIRLA VISHWAKARMA MAHAVIDYALAYA
CIVIL DEPRTMENT  Introduction :  The process of laying out engineering projects by placing pegs Or marks at the site of works is known as setting out.
Construction Surveys. List of Figures Stages and Measurements of CS Design stages: topographic Surveying, and site maps Construction stage: Setting-out.
Traversing: Theodolite Traverse
Mr. Vedprakash Maralapalle, Asst. Professor
Theodolite Traversing Mr. Vedprakash Maralapalle, Asst. Professor
ENGINEERING COLLEGE TUWA
FACULTY OF ENGINEERING TECHNOLOGY AND RESERCH, TAJPORE, BARDOLI CIVIL ENGINEERING DEPARTMENT SURVEYING ( )
METHODS OF LOCATING SOUNDING
Part- I {Conic Sections}
Surveying 1A (SVG 105) PLANE TABLE SURVEYING
LEVELLING AND CONTOURING BY:- ANAND R. JIBHAKATE CIVIL ENGINEER 1 1.
CURVES Lecture – 06.
Gable Roof BCGCA3007B.
Theodolite: Introduction
Topic: “Plane table surveying”…
SURVEYING Plane Table Survey
Mr. Vedprakash Maralapalle, Asst. Professor
Theodolite: Introduction
S. N. PATEL INSTITUTE OF TECHNOLOGY & RESEARCH CENTRE , UMRAKH
Plane table surveying with contouring
Introduction Theodolite is used to measure the horizontal and vertical angles. Theodolite is more precise than magnetic compass. Magnetic compass measures.
Engineering Curves.
Sometimes it will be observed that many obstructions like rivers, canals, ponds. thick jungles, ditches, buildings, etc. lie on the chain line. These.
VADODARA INSTITUTE OF ENGINEERING
THEODOLITE TRAVERSING BY S N Nanaware
Tacheometric Surveying Mr. Vedprakash Maralapalle, Asst. Professor
Rectangular Coordinates Level control in trenches
Higher Maths Vectors Strategies Click to start.
TACHEOMETRIC SURVEYING
SURVEYING – II THEODOLITE
Tacheometric Surveying
Modern Surveying Instruments
Cross section It is supposed a hill has been cut vertically, then we can see the side view, or cross section of the hill A section is a slice vertically.
Leveling.
Leveling.
Leveling.
Visit for more Learning Resources
Mr. Vedprakash Maralapalle, Asst. Professor
Leveling.
1.  Plane table is a graphical method of surveying in which the field works and the plotting is done simultaneously.  It is particularly adopting in.
Engineering Surveying Curve Ranging
Presentation transcript:

Mr. Vedprakash Maralapalle, Asst. Professor Setting Out Of Work Mr. Vedprakash Maralapalle, Asst. Professor Department: B.E. Civil Engineering Subject: Surveying – II Semester: IV eCourseware@AIKTC Teaching Aids Service by KRRC Information Section

Setting out of Load bearing Structure

In this method , the rectangle ABCD formed by the center lines of the outsides of the walls of buildings is set out accurately with tape. The corner of the building are then located by measuring there distances with reference to these rectangle. As the excavation proceeds ABCD will get disturbed & hence they will no longer available for reference. To over come this difficulty reference stakes 1 to 8 on the prolongation of the sides.. In uneven ground the required reference points, may be transferred on the ground by using plumb bob.

Setting out of culvert Fix a peg at O Set up theodolite over O Bisect the point B. and fix the a number of points along OB. Transits the telescope and fix a number of points along OA. Set out the line CD at right angle to AB and fix a number of points necessary to define the line CD . Set off the distance O1,O2,O3,O4 etc along CD. On side of O and 1a,2b,3c,4d, etc along AB on either side of O. fix arrow at these points. In similar manner other corner of the wing walls and abutments may be marked by their co-ordinates and pegs are driven.

Setting out sewer Fix stakes on the ground at the center line of the proposed sewer at 20m intervals. Set out a parallel line to the proposed center line of the sewer on one side at a distance apart so that it may not get disturbed during excavation. Excavate the sewer trench of desired width and depth. Erect cross heads at 30meter apart and each change of gradient and direction. Set the top edge of each sight rail truly horizontal with help of a spirit level. Drive in a nail on the top edge at the centre of the sight rail to define the centre line of the sewer. Establish the gradient of the line joining top edge of two consecutive sight rails as that of the invert of the sewer.

Setting out of bridge pier Locating pier position Lay one base line on each bank exactly at right angle to center line AB , extending on either side of the centre line. Measure the accurate length of centre line AB by triangulation. Locate the position of the piers on the centered line. Calculate the distance BP1, P1P2,P2A between the abutment and piers. Measure distances B1,B2 equal to BP1 and BP2 respectively on the base line perpendicular at B on either side. Similarly measure distances A2, A1 equal to AP2 and AP1 on the base line perpendicular at A on either side. The interacting line 1-1& 2-2 make angle of 45 with base lines on opposite banks and also with the centre line AB

The position of pier 1 may be located by simultaneously sighting at the interesting of the two intersecting lines 1-1 Similarly the position of pier 2 may be located by simultaneously sighting at the intersection of the two intersecting lines 2-2

Transfer of center line inside tunnel A theodolite is set up on top of the hill at a suitable position to maintain the center line of the shaft. With the help of leveling instrument, the RL of both ends of the shaft are determined. Since the bottom level of the tunnel is already determined, the exact depth of the shaft is calculated with reference to the top RL. Then the excavation of the shaft is started and verticality is maintained by plumb bob suspended from wire. Excavation is continued until the calculated bottom level is reached. the center line inside the tunnel should be maintained by a precise theodolite.

Checking verticality of high rise structures. first set the total station, that is, you put on tripod and level the bubbles. the place you set it should not be very far from the buildings you are checking for verticality. switch on the total station. you need not to set anything. bisect the bottom of one corner of the building and clamp the alidade of the total station. turn the telescope upwards as you sight through it. if the cross hairs move along the edge of the wall all along to top, then the building is vertical. but there may be small variations which are negligible e.g deviations to left and right as you go up. but if there is a constant deviation to one side, then there is a problem with verticality.