FCC Underground Infrastructure

Slides:



Advertisements
Similar presentations
M. Ross Project Advisory Committee Review 13 December, 2012 KEK Main Linac Layout – Two variants for two different types of sites GDE PAC Review.
Advertisements

Plasma Wakefield (AWAKE) Project Meeting 18 October 2012 Civil Engineering Feasibility Issues for the West Area EDMS : John Osborne GS-SE.
CFS challenges for a linear collider J.Osborne CERN ILC-GDE Dubna - 4 June 2008 OUTLINE : Introduction Civil Engineering -Geology (water, stability issues.
1 DOE Annual Review -June 15,2005 An Overview of Conventional Facilities (Civil Construction) U. S. ILC Civil studies and cost issues for Snowmass Fred.
3/2011 CFS BTR Global Design Effort 1 Americas Region Civil Design Tom Lackowski.
John Osborne GS/SE March 2013
Yung Loo FCC: GIS & Tunnelling Update.
Experimental hall in Japanese mountain site Y. Sugimoto ILD MDI/Integration 1.
Infrastructure & Operation 27 th May 2015 Infrastructure & Operation 27 th May 2015 Update on optimisation of tunnel footprint and location Charlie Cook.
Investigation of FCC position Impacts on Hadron Injectors John Osborne, Charlie Cook, Yung Loo (ARUP) 16/09/2014.
Laughton 7/04 Long Baseline Neutrino Program Tunneling Chris Laughton, Fermilab.
NuMI NuMI Overview NBI 2002 S. Childress (FNAL) 14 March ‘02 NuMI / MINOS Overview.
TOT-FCC: Tunnel Optimisation Tool for the Future Circular Collider Introduction and lessons learnt C. Cook, J. Osborne, P. Lebrun, Y. Robert, M. Jones,
Geotechnical & Civil Engineering Studies Future Circular Colliders (FCC)
Global Design Effort - CFS ILC CFS and Global Systems Meeting 1 ILC CFS AND GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP GENERAL.
ARUP Studies Update ILC Interaction Region Design Requirements John Osborne CERN, Yung Loo & Matt Sykes (ARUP) CFS-ADI Joint Meeting - University of Tokyo.
1. Civil Engineering works for Linear Colliders* : -Brief introduction on the overall machine layout (just for CLIC at this stage) -Experimental Area.
Global Design Effort - CFS SiD Collaboration Meeting - SLAC 1 VERTICAL ACCESS ILC IR LAYOUT for SiD and ILD CONVENTIONAL FACILITIES AND SITING.
FCC Tunnel Civil Engineering and Geology John Osborne (CERN GS-SE) 4 April 2014.
LCWS14 - Belgrade October 6-10, 2014 Conventional Facilities & Siting Working Group Summary V Kuchler, M Miyahara, J Osborne.
ILC experimental area - How to ‘develop’ CFS details for TDP (cavern size, number of shafts, HVAC, EL spec etc) ? - KEK site specific issues CFS V.Kuchler.
HF2014 Workshop, Beijing, China October 9 th -12 th, 2014 Constraints on FCC-ee lattice design Bastian Haerer Constraints on the.
November 17, st XFEL / ILC Meeting 1 ILC GLOBAL Design Effort The Current ILC Twin Tunnel Design Wilhelm Bialowons and Nicholas Walker · MPY.
Global Design Effort - CFS TILC09 and GDE AAP Review Meeting - Tsukuba, Japan 1 GDE ACCELERATOR ADVISORY PANEL REVIEW CONVENTIONAL FACILITIES.
1 CLIC / ILC Collaboration for CES issues JOHN OSBORNE – CES 8 April 2009.
Contents Scope of Work and Work Stages
Review of FCC tunnel footprint & implementation Outcome & conclusions Austin Ball, Paul Collier, Massimo Giovannozzi Philippe Lebrun (chair), Lluis Miralles,
John Osborne : GS-SEM Civil Engineering 18 May 2009 CES 9 June News from ILC Japan CFS review 1-3 June 2010 :
ILC D RAFT P ROJECT S CHEDULE K LYCLUSTER 500GeV K Foraz & M Gastal ILC Mechanical & Electrical Review and CFS Baseline Technical Review Many thanks to.
Global Design Effort - CFS DESY Accelerator Design and Integration Meeting 1 ACCELERATOR INTEGRATION AND DESIGN MEETING CONVENTIONAL FACILITIES.
March 22,  Overview of Asian Civil Design  Previous Case Study  Feature of Beam Tunnel  Tunnel Typical Cross Section  Beam Tunnel.
Report from ARUP meeting Andrea Gaddi, CERN Physics Department.
FHI 32: FCC tunnel layout and transferline update Tuesday, 9 February 2016 CE Updates: Comparison of 100km Intersecting and Non-Intersecting options New.
MDI 9 th Meeting - 22 nd January 2016 FCC Experimental Caverns - Feasibility and Excavation C. Cook (GS), J. Osborne (GS),
FCC-hh MDI 5 th Meeting Friday 13 th March 2015 Civil Engineering Layouts for Experimental Caverns – First Draft Charlie Cook (GS), John Osborne (GS)
Infrastructure and Operation meeting 20 th January 2016 Amberg’s Report Summary : Comparison of 100km Intersecting and Non-Intersecting options C. Cook.
ILC J.Osborne / A.Kosmicki / B.List – March 22 th 2012 CFS update for Europe.
Review of FCC tunnel footprint & implementation Introduction & scope Philippe Lebrun Review of FCC tunnel footprint & implementation CERN, 11 June 2015.
MDI Meeting 13 th MDI: Latest news on civil engineering and services First draft concept for the ventilation system in the CLIC experimental area 11/06/2010.
CENF CIVIL ENGINEERING UPDATE : - SITE INVESTIGATION - CALL FOR TENDER FOR DESIGN & CONTRACT ADMINISTRATION SERVICES - 3D VISUALS FOR SURFACE STRUCTURES.
CENF CIVIL ENGINEERING UPDATE : - SITE INVESTIGATION - CALL FOR TENDER FOR DESIGN & CONTRACT ADMINISTRATION SERVICES John Osborne GS/SE 16 May 2013.
5 December 2011 Task 2 Cavern Study Ground model and 3D cavern layout Matt Sykes Eden Almog Alison Barmas Yung Loo Agnieszka Mazurkiewicz Franky Waldron.
Matt Sykes Andy Kervell Yung Loo Heidi Clough Craig Sturzaker ARUP: Update on GIS Model and tunnel options under lake.
HF2014 Workshop, Beijing, China 9-12 October 2014 Constraints on FCC-ee lattice design Bastian Haerer Constraints on the FCC-ee.
Review of FCC tunnel footprint & implementation Outcome & conclusions Austin Ball, Paul Collier, Massimo Giovannozzi Philippe Lebrun (chair), Lluis Miralles,
Global Design Effort - CFS ILC CFS and Global Systems Meeting 1 ILC CFS AND GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP CFS.
ILC CONVENTIONAL FACILITIES A. Enomoto, V. Kuchler, J. Osborne
ILC CONVENTIONAL FACILITIES A. Enomoto, V. Kuchler, J. Osborne
Experimental Hall in Mountain Regions
RISK ASSESSMENT FCC draft, 2. September 2015.
Civil Engineering for FCC-eh and LHeC
Civil Engineering update - alignment configuration
FCC Civil Engineering Optimisation and Design Development
CLIC Civil Engineering Update
CLIC Civil Engineering Update
FCC Civil Engineering John Osborne, Jo Stanyard, Matt Stuart(SMB - Site Engineering - FAS Section) Cost & schedule Phase 3 - specification 10th May 2017.
Marco Oriunno (SLAC), March 12, 2014 MDI WG
CLIC Civil Engineering & Infrastructure
FCC Civil Engineering John Osborne & Jo Stanyard (SMB - Site Engineering - FAS Section) FCC week outline 10th May 2017.
Acknowledgements to all FCC study teams
CLIC / ILC Collaboration for CFS works
5th FCC Infrastructure & Operation meeting
FCC Civil Engineering update
Latest ILC tunnel cross section May 2017
WP3 status Interaction Region design
FCC-ee MDI Civil Engineering update
Civil Engineering for FCC-eh IR
CLIC Civil Engineering Update
Workshop on fire protection for physics research facilities
FCC Week 2019 Civil Engineering Summary
Presentation transcript:

FCC Underground Infrastructure SMB FCC Underground Infrastructure FCC-ee MDI 2nd Meeting 04-04-2016 C. Cook, J. Osborne C. Cook

FCC Civil Engineering Outline History of the FCC civil engineering study Study of options for position of FCC - Intersecting vs. Non-intersecting FCC underground civil structures 3D Schematic Cross-sections - Single and double tunnel proposals - Transfer lines - Combining FCC-hh and FCC-ee requirements Construction methods, rates and risks Inclined access tunnels MDI and civil engineering - Experimental area layout FCC-he civil engineering Main challenges and future steps (costing) C. Cook

Study recent history CERN’s FCC Review Extension of study into Prealps region. Updated contours for Jura, Vuache, Voirons-Faucigny. Inclusion of new geological data within the Tunnel Optimisation Tool (TOT). Three engineering studies by AMBERG. Working with Infrastructure & Operation and Machine Detector Interface groups on underground infrastructure requirements. FCC CE study presented at FCC week, Washington 2015 Footprint, positioning and planarity assessed by review panel – Decision taken to focus on 100km, planar FCC machine March 2015 July 2015 July – August 2015 August 2015 – March 2016 CERN’s FCC Review Engineering studies & TOT updates (ARUP & AMBERG) New geological interpretations (GADZ) FCC Week 2015, Washington CERN internal studies C. Cook

‘Intersecting’ vs. ‘Non-intersecting’ FCC Position 100km ‘Intersecting’ option Limestone region: Jura Max overburden: 650m Deepest shaft: 392m % of tunnel in limestone: 13.5% Total shaft depth: 3211m Challenges: 7.8km tunnelling through Jura limestone 300m-400m deep shafts and caverns in molasse C. Cook

‘Intersecting’ vs. ‘Non-intersecting’ FCC Position 100km ‘Non-Intersecting’ option Limestone region: Prealps Max overburden: 1350m Deepest shaft: 383m % of tunnel in limestone: 4.4% Total shaft depth: 3095m Challenges: 11.6km tunnelling through Prealps geology 1.35km maximum tunnel overburden 300m-400m deep shafts and caverns in molasse C. Cook

‘Intersecting’ vs. ‘Non-intersecting’ FCC Position 93km option C. Cook

Naming Convention TO BE UPDATED C. Cook

Double Tunnel Proposal TO BE UPDATED C. Cook

Cross-sections C. Cook

Cross-sections C. Cook

Cross-sections C. Cook

Cross-sections C. Cook

Cross-sections C. Cook

Cross-sections In work drawings C. Cook

Cross-sections In work drawings C. Cook

Cross-sections In work drawings C. Cook

Cross-sections In work drawings C. Cook

Cross-sections In work drawings C. Cook

FCC Construction – Methods, Rates & Risks Shaft Construction Experimental Shafts Through moraine layer If moraines is firm, cohesive or consolidated => conventional excavation. Lattice girder rings, shotcrete and steel mesh as support If loose or below water table => pile walls up to 25m deep, diaphragm walls >25m Through molasse layer Drill & blast recommended. Support similar to moraines but less required C. Cook

FCC Construction – Methods, Rates & Risks Experimental Caverns First Draft C. Cook

FCC Construction – Methods, Rates & Risks Experimental Caverns First Draft 44 m 42 m 86 m 13 m ? m C. Cook

Machine Detector Interface (MDI) TO BE UPDATED Thanks to MDI-hh, MDI-ee, HSE C. Cook

Machine Detector Interface (MDI) TO BE UPDATED Thanks to MDI-hh, MDI-ee, HSE C. Cook

Machine Detector Interface (MDI) TO BE UPDATED Thanks to MDI-hh, MDI-ee, HSE C. Cook

Combining FCC-hh and FCC-ee Infrastructure must be designed to house both machines at different times Boundary conditions established for FCC-hh and FCC-ee beam separation. FCC-ee lattice adjusted. Result: Widening of tunnel around FCC-ee IPs necessary (~4km total) Max. separation FCC-ee beams Min. & max. separation FCC-ee & FCC-hh beams C. Cook

Combining FCC-hh and FCC-ee Adjustment of the FCC-ee lattice K. Oide C. Cook

Inclined Access Tunnels Shaft (vertical) vs. Inclined tunnel? 395m Shaft ~400m 3o 2800m C. Cook

Inclined Access Tunnels Shaft (vertical) vs. Inclined tunnel? 395m Inclined tunnel 3o 2800m 6% ~3000m C. Cook

Inclined Access Tunnels New inclined tunnel search function – Tunnel Optimisation Tool Select point on ring and set search radius. Possible locations for access portal highlighted on map Filter results by tunnel gradient and tunnel length Find optimum access portal location giving minimum tunnel length with given maximum gradient C. Cook C. Cook

Future Steps Post-Rome Required Study of widened tunnels – layout that works with FCC-ee, FCC-hh & HSE Continued integration of MDI-ee and MDI-hh needs - Iterations of experimental hall layout – new ideas from MDI-hh More detailed cost & schedule study – all CE structures Finalise FCC Naming Convention Possible Detailed cavern study – engineering challenge, detailed look at construction methods C. Cook