Calibration: preparation for pa

Slides:



Advertisements
Similar presentations
Terzo Convegno sulla Fisica di ALICE - LNF, Andrea Dainese 1 Preparation for ITS alignment A. Dainese (INFN – LNL) for the ITS alignment group.
Advertisements

11th April 2008TOF DA & ppChiara Zampolli. DAQ-DA Three DAQ-DAs implemented, deployed, validated, and tested: TOFda TOFnoiseda TOFpulserda DCS-DA One.
F Antinori - 417th WE-Heraeus-Seminar - Bad Honnef - June Heavy Flavour in ALICE Federico Antinori (INFN Padova & CERN) for the ALICE Collaboration.
Trains status&tests M. Gheata. Train types run centrally FILTERING – Default trains for p-p and Pb-Pb, data and MC (4) Special configuration need to be.
Chiara Zampolli in collaboration with C. Cheshkov, A. Dainese ALICE Offline Week Feb 2009C. Zampolli 1.
SSD Status P. Christakoglou (NIKHEF-UU) for the SSD collaboration Thanks to: Marco vL, Enrico, Mino, Marek and Massimo.
11 CTP Training A.Jusko, M. Krivda and R.Lietava..
DCS - general Unscheduled power cut Wed. morning ( , human error) –DCS (and HLT) off, due to UPS on bypass –In the middle of DB migration, had.
Real data reconstruction A. De Caro (University and INFN of Salerno) CERN Building 29, December 9th, 2009ALICE TOF General meeting.
1 CTP offline software status (Offline week) A.Jusko and R.Lietava.
V4-20-Release P. Hristov 08/08/ Changes: v4-20-Rev-38 #85151 Memory leak in T0 DQM agent. From rev #85276 AliGRPPreprocessor.cxx: Port to.
Offline report – 7TeV data taking period (Mar.30 – Apr.6) ALICE SRC April 6, 2010.
Infrastructure for QA and automatic trending F. Bellini, M. Germain ALICE Offline Week, 19 th November 2014.
PWG3 Analysis: status, experience, requests Andrea Dainese on behalf of PWG3 ALICE Offline Week, CERN, Andrea Dainese 1.
Analysis trains – Status & experience from operation Mihaela Gheata.
Cosmic Ray Run III Cosmic Ray AliEn Catalogue LHC08b 1.
ALICE Offline Week, CERN, Andrea Dainese 1 Primary vertex with TPC-only tracks Andrea Dainese INFN Legnaro Motivation: TPC stand-alone analyses.
T0 offline status Alla Maevskaya for T0 team 8 March 2011 ALICE offline week.
1 RHIC Machine/Detector Planning Meeting 29 Jan 08 Agenda –Run 8 end game issues, if any Planning Meeting Web Site:
2007 Run Update for STAR Jeff Landgraf For the STAR collaboration.
1 Checks on SDD Data Piergiorgio Cerello, Francesco Prino, Melinda Siciliano.
STAR Analysis Meeting, BNL – oct 2002 Alexandre A. P. Suaide Wayne State University Slide 1 EMC update Status of EMC analysis –Calibration –Transverse.
AliRoot survey: Analysis P.Hristov 11/06/2013. Are you involved in analysis activities?(85.1% Yes, 14.9% No) 2 Involved since 4.5±2.4 years Dedicated.
Summary of User Requirements for Calibration and Alignment Database Magali Gruwé CERN PH/AIP ALICE Offline Week Alignment and Calibration Workshop February.
Predrag Buncic CERN ALICE Status Report LHCC Referee Meeting 01/12/2015.
Data processing Offline review Feb 2, Productions, tools and results Three basic types of processing RAW MC Trains/AODs I will go through these.
Summary of Workshop on Calibration and Alignment Database Magali Gruwé CERN PH/AIP ALICE Computing Day February 28 th 2005.
PWG3 Analysis: status, experience, requests Andrea Dainese on behalf of PWG3 ALICE Offline Week, CERN, Andrea Dainese 1.
All Experimenters MeetingDmitri Denisov Week of December 23 to December 30 D0 Summary  Delivered luminosity and data taking efficiency u Delivered: 5.8pb.
V5-01-Release & v5-02-Release Peter Hristov 20/02/2012.
Feb. 3, 2007IFC meeting1 Beam test report Ph. Bruel on behalf of the beam test working group Gamma-ray Large Area Space Telescope.
Offline Weekly Meeting, 24th April 2009 C. Cheshkov & C. Zampolli.
1 Reconstruction tasks R.Shahoyan, 25/06/ Including TRD into track fit (JIRA PWGPP-1))  JIRA PWGPP-2: Code is in the release, need to switch setting.
 offline code: changes/updates, open items, readiness  1 st data taking plans and readiness.
V4-20-Release P. Hristov 21/02/ Changes: v4-20-Rev-14 #78385 Please port AliTPCPreprocessor.cxx Rev to Release #78344 Request to port changes.
V5-02-Release Peter Hristov 23/04/ Changes: v5-01-Rev-32 #93585 Request of porting in the release (AliTOFTrigger). From rev ,55583,55694.
D. Elia (INFN Bari)Offline week / CERN Status of the SPD Offline Domenico Elia (INFN Bari) Overview:  Response simulation (timing info, dead/noisy.
AliRoot survey: Calibration P.Hristov 11/06/2013.
21 Mar 2007ALICE - Paul Dauncey1 ALICE CR07: Installation and Commissioning Paul Dauncey Material from: L. Leistam: “ALICE Status” W. Riegler: “Commissioning.
V4-19-Release P. Hristov 11/10/ Not ready (27/09/10) #73618 Problems in the minimum bias PbPb MC production at 2.76 TeV #72642 EMCAL: Modifications.
ANALYSIS TRAIN ON THE GRID Mihaela Gheata. AOD production train ◦ AOD production will be organized in a ‘train’ of tasks ◦ To maximize efficiency of full.
Monthly video-conference, 18/12/2003 P.Hristov1 Preparation for physics data challenge'04 P.Hristov Alice monthly off-line video-conference December 18,
CALIBRATION: PREPARATION FOR RUN2 ALICE Offline Week, 25 June 2014 C. Zampolli.
1 14th June 2012 CPass0/CPass1 status and development.
AliRoot status Peter Hristov 25/06/2012.
January 2009 offline detector review - 2 nd go 1 ● Offline – Geometry – Material budget – Simulation – Raw data – OCDB parameters – Reconstruction ● Calibration.
P. Kuijer1 System run coordinator meeting
V4-18-Release P. Hristov 21/06/2010.
Jan Fiete Grosse-Oetringhaus
F. Bellini for the DQM core DQM meeting, 04th October 2012
DCS Status and Amanda News
Primary vertex reconstruction with the SPD
DPG Activities DPG Session, ALICE Monthly Mini Week
ALICE Status Report to LHCC September 2008
CPass0/CPass1 on LHC12d/c Updated at 08:45 on 02/08
Production status – christmas processing
ALICE analysis preservation
v4-19-Release & v4-20-Release
fields of possible improvement
Run2 reconstruction status and plans R.Shahoyan for PWGPP, 02/07/2015.
v4-18-Release: really the last revision!
New calibration strategy – follow-up from the production review
AliRoot status and PDC’04
Experience between AMORE/Offline and sub-systems
V5-02-Release Peter Hristov 21/05/2012.
Analysis framework - status
TPC status - Offline Q&A
Corr framework Computing in High Energy and Nuclear Physics
Quarkonium production in p-p and A-A collisions: ALICE status report
Quarkonium production in p-p and A-A collisions: ALICE status report
Presentation transcript:

Calibration: preparation for pa C. Zampolli Calibration: preparation for pa 07/01/2013 C. Zampolli

Calibration strategy – CPass0 + CPass1 Chunk 0 Chunk 1 Chunk N Chunk 0 Chunk 1 Chunk N … … Alien job Alien job Alien job Alien job Alien job Alien job Alien job Alien job OCDB snapshot snapshot reconstruction reconstruction ESDs ESDs Calib. train Calib. train QA train Merging + OCDB entires Merging + OCDB entires 07/01/2013 OCDB Update C. Zampolli OCDB Update

Run selection Runs are picked automatically from the logbook, with the following criteria: PHYSICS run, Beam ON, GOOD Data Quality flag, GRP pp in DONE, at least one of SDD, T0, TOF, TPC, TRD, number of kCalibBarrel > 0, data migrated, B field ok If TPC  TPC pp in DONE If TRD  TRD pp in DONE If SPD  SPD pp in DONE (SPD should be always there) GOOD Data Quality flag set online in the ACR Runs should last at least 5 minutes NB. In pp: kCalibBarrel = SPI triggers; kCalibOuter = EMCAL + MUON + PHOS triggers In pA: kCalibBarrel defined differently (see later); kCalibOuter = EMCAL + MUON + PHOS triggers 07/01/2013 C. Zampolli

pA During standard data taking: During MB-like data taking: Using high-multiplicity trigger (20 Hz) Still to be set by Trigger experts; using VZERO During MB-like data taking: Downscaling at reconstruction level, according to: min(max(nevents/10,30000),nevents)/nevents If events <= 30000  reconstruct all If events >= 300000  reconstruct 10% In between, 30000 No kCalibBarrel defined kCalibOuter kept as now More QA from fast MUON + calorimeters reconstruction (kPhysME) 30000 due to >3x higher multiplicity in pA than pp 30000 events 10% of the statistics 07/01/2013 C. Zampolli

Trigger Clusters Data taking will be in the same run with two different partitions: Fast cluster  without SDD, AOCRDE, EMCAL, FMD, PHOS, MUON, PMD ALL cluster  everybody CENT cluster  without MUON, PMD MUON cluster MUON + SPD + SSD (?) + T0 + V0 + ZDC Ken's talk at last PB 07/01/2013 C. Zampolli

But… Data taking will be in the same run with two different partitions: Fast cluster  without SDD, ACORDE, EMCAL (?), FMD (?), PHOS, MUON, PMD ALL cluster  everybody CENT cluster  without MUON, PMD MUON cluster MUON + SPD + SSD (?) + T0 + V0 + ZDC Events in these clusters could be used for calibration, but the absence of SDD could bias the results, and SDD might not have enough events Only use ALL + CENT Standard pA  kCalibBarrel should not be associated to events from Fast cluster MB data taking  dedicated alias as discussed in https://savannah.cern.ch/bugs/?99650 Since an an event can be read out by two clusters, a sort of “exclusive” selection of aliases is needed (e.g. only ALL, not Fast) Ken's talk at last PB 07/01/2013 C. Zampolli

CPass calibration code status V5-03-Rev-03 should have been the “golden” release Some changes needed, new revision foreseen Detector Status Mean Vertex ok SDD TPC TRD TOF Ok T0 ? No reprocessing possible yet 07/01/2013 C. Zampolli

TPC calibration dEdx resolution worsens at high rate (~8%), together with space point distortion (3 sigma) So far, only extrapolation can be done Procedure definition need data For space point distortion, a first workaround could be put in place Require manual calibration after PPass (high-pt trees needed) After that, full calibration chain to be re-run (TPC calibration would change) 07/01/2013 C. Zampolli

Current “schedule” Monday 7 Jan, Sunday 13 Jan  machine and injectors commissioning Monday 14 Jan  setting up for pA 4 days of setup (could even be that they declare STABLE BEAMS) Friday 18 Jan  Physics 5-7 days of MB (to accumulate 100M events) Then increase in luminosity, different trigger configuration Monday 11 feb (at 6 am)  end of pA, start of pp at low energy Each step depends on the previous one Any delay could have consequences on the next steps! E.g.: any delay this week would make pA shift in time pA vs Ap  change of period probably better 07/01/2013 C. Zampolli

2012 data – what is left LHC12h LHC12i VPass started over Christmas; almost completed Run 189406 (8740 chunks for ~1.3M of MB events) failed in CPass0 merging (EE) LHC12i CPass reprocessing completed over Christmas (checking a few runs) Manual update window to be opened, QA readiness to be assessed  deadline next week, then busy times for pA, so maybe VPass will need to be postponed 07/01/2013 C. Zampolli