Joint Forces Command Working Group Brief-Backs

Slides:



Advertisements
Similar presentations
Gaining Senior Leadership Support for Continuity of Operations
Advertisements

A-16 Portfolio Management Implementation Plan Update
WJTSC 09-2 Aug  Key Points from Working Group meetings  Flow diagrams  Required Documentation  IMS Example  Way Ahead.
Directions for this Template  Use the Slide Master to make universal changes to the presentation, including inserting your organization’s logo –“View”
Joint Worldwide Training and Scheduling Conference Can Be A Mechanism For Joint Force Development.
UN UNCLASSIFIED 1 DOD Participation Challenges in the National Exercise Program Issue : DOD Participation Challenges in the National Exercise Program.
Background The purpose of the CE2T2 program is to exercise and train for joint operations (tactical through strategic), improve the realism and robustness.
UN UNCLASSIFIED Joint Lessons Learned Program Working Group March 2010 LCDR Sam Tanner JS J-7 JLLP Branch.
WJTSC 10-2 Mr. Warren Bizub, JFCOM J7 20 September 2010 JOINT LOGISTICS EDUCATION and TRAINING (JLET) WORKING GROUP.
UNCLASSIFIED 1 USJFCOM Brandon Cholek, JOCSP USJFCOM Operational Contract Support (OCS) Planning Initiatives - Projects (J7) COCOM Exercise support (J7)
WJTSC 10-2 Mr. Warren Bizub, JFCOM J7 20 September 2010 JOINT LOGISTICS EUCATION, TRAINING, AND EXPERIMENTATION TRANSFORMATION (JLETT) WORKING GROUP.
Unit 8: Tests, Training, and Exercises Unit Introduction and Overview Unit objectives:  Define and explain the terms tests, training, and exercises. 
ACGU Training Integration Management and Systems Work Group 0800 – 1200 hrs, 31 March ‘10 Worldwide Joint Training & Scheduling Conference UNCLASSIFIED.
Crisis Action Planning Commander’s Guidance and Intent
USPACOM READINESS OF JTF CAPABLE HQ
U.S. European Command EPOC-JTRE - 5 September UNCLASSIFIED Joint Individual & Staff Training (JIST) Program Update Mr. Tony Carpenter Dr. Ruth.
Unit 5:Elements of A Viable COOP Capability (cont.)  Define and explain the terms tests, training, and exercises (TT&E)  Explain the importance of a.
USJFCOM Exercise Support Working Group
UNCLASSIFIED Joint and Coalition Warfighting Mr. John Vinett March 2012 Technical Baseline Capability.
DoDI  Review of Para 3 of Encl 3 of DoDI  NEP Exercise After Action Activities  Information Flow  Decision Points.
UN UNCLASSIFIED Chairman’s Exercise Program / National Exercise Program Synchronization Working Group 29 March 2010 LTC Geoff Fuller JS J-7 CEP Branch.
UNCLASSIFIED WJTSC 12-1 Master Issue Deck WJTSC 12-1 as of: 22 Mar 12.
WJTSC March 2010 JLET Way-Ahead Open Forum Discussion.
UNCLASSIFIED 1 Partnership Opportunities Catalog United States Joint Forces Command Joint Warfighting Center Joint Warfighting Center Partnership Opportunities.
Presenter’s Name June 17, Directions for this Template  Use the Slide Master to make universal changes to the presentation, including inserting.
UN UNCLASSIFIED Joint Logistics Education, Training and Experimentation Transformation (JLETT) Working Group 26 August Mr Warren Bizub JWFC.
1 Joint Logistics Education, Training, and Exercise Study Joint Logistics Education, Training, and Exercise Study Jim Toone WJTSC March 2010 UNCLASSIFIED.
WJTSC AUGUST 2009 JOINT LOGISTICS EUCATION, TRAINING, AND EXPERIMENTATION TRANSFORMATION (JLETT) WORKING GROUP.
Issue : Coordination and synchronization of JTEN services and LVC training enhancements for exercises conducted by ABCA partner nations and combatant.
1 EMS Fundamentals An Introduction to the EMS Process Roadmap AASHTO EMS Workshop.
ABCA Training Integration Work Group 0800 – 1200hrs, 26 August ‘09 Worldwide Joint Training & Scheduling Conference UNCLASSIFIED.
CENTER FOR JOINT & STRATEGIC LOGISTICS Mr. Randy Helms 31 March 2010 National Defense University Briefing for the Joint Logistics Education and Training.
1 United States Joint Forces Command United States Joint Forces Command Joint Concept Development and Experimentation (JCD&E) Interagency and Multinational.
UNCLASSIFIED 11 Joint Education and Individual Training U.S. Joint Forces Command Ms. Elizabeth Lape, MS.Ed GS-14 Lead, Education and Individual Training.
1 Community-Based Care Readiness Assessment and Peer Review Overview Department of Children and Families And Florida Mental Health Institute.
UN UNCLASSIFIED US Government Interagency Training Coordinator Working Group 31 March 2010 Mr Gary Quay JS J-7 CEP Branch.
UN UNCLASSIFIED Individual and Staff Joint Training Working Group 29 March 2010 MAJ Bill Coryell JS J-7 Policy Integration Branch.
Section 4.9 Work Group Members Kris Hafner, Chair, Board Member Rob Kondziolka, MAC Chair Maury Galbraith, WIRAB Shelley Longmuir, Governance Committee.
UNCLASSIFIED / FOR OFFICIAL USE ONLY USAFMCOM UNCLASSIFIED / FOR OFFICIAL USE ONLY.
UNCLASSIFIED Joint Individual Training and Education Program (JITEP) Individual & Staff Joint Training Working Group WJTSC 09-2 CONFERENCE Mr. Herb Warden/Mr.
UN UNCLASSIFIED 1 Issue : Combatant Commanders require a distributed, integrated, synthetic Missile Warning (MW) and Ballistic Missile Defense (BMD)
1 UNCLASSIFIED Welcome to the 2009 Joint Lessons Learned Working Group 25 August 2009 Operational Plans and Joint Force Development Directorate (J-7),
USPACOM Deployable Joint Task Force Augmentation Cell (DJTFAC) (U) This brief is: UNCLASSIFIED Col Kelly Lawson Deputy Division Chief, Crisis Action Planning.
Joint Tasks Trained in JNTC-Accredited Service Exercises Briefing to RTPP Director 4 March 2010 This briefing is UNCLASSIFIED OSD Readiness and Training.
Project Execution Methodology
Principal Investigator ESTCP Selection Meeting
CD&E Monthly Update 4 December 2013
Supporting Joint Training with the
State Coordinator Intervention
Individual and Staff Joint Training Working Group
Joint Forces Command Update
System Planning To Programming
WJTSC 09-2 IPR WELCOME.
Unit Organization 1. Unit Organization. NC is comprised of one group and three squadrons. Each semester, the three flights will be established.
Combat Support Agency Working Group
WJTSC Master Issue Deck
Joint Education and Individual Training U.S. Joint Forces Command
Principal Investigator ESTCP Selection Meeting
The MDMP Process MDMP Inputs MDMP Outputs Step 1 MDMP Inputs Step 5
Deployable Training Division (DTD)
The Competition Continuum Joint Doctrine Note Proposal
Mission Command Center Excellence Directorate of Training
Mission Command Center Excellence Directorate of Training
Office of Emergency Communications
Definition of Project and Project Cycle
Principal Investigator ESTCP Selection Meeting
TECHNOLOGY ASSESSMENT
IEEE IMT-Advanced Review Process
Principal Investigator ESTCP Selection Meeting
Directions for this Template
Presentation transcript:

Joint Forces Command Working Group Brief-Backs Worldwide Joint Training and Scheduling Conference 27 Aug 09 UNCLASSIFIED

USJFCOM Exercise Support Mon, 25 Aug 09 Mr. Enriquez UNCLASSIFIED

USJFCOM Exercise Support Purpose: Optimize USJFCOM support for all COCOMS for FY10 and FY11 USJFCOM supported events. Discussion the definition of an “Exercise” in order to ensure uniform support across all COCOMs. Discussion: In short bullets, describe the major themes from the working group activities. If the working group made decisions that need to be brought to the attention of the joint training community or are applicable to joint training policy / procedures, discuss them here. Keep the discussion limited to information that you think is relevant to the entire joint training community – remember that this audience has many senior participants and the objective is to brief at an executive level Conclusion: What is the take-away that you want the audience to understand about your working group and the work that you did. Issues: If the working group was assigned an issue from the master issue deck for discussion, then present the results of that discussion: Has the desired endstate remained the same; what are the changes to the POA&M; other pertinent discussion – clearly describe the way ahead and any show-stoppers to reach resolution on the issue. If the working group identified an issue/issues that needs senior leader visibility / involvement that should be added to the master issue deck for resolution by the joint training community – fill out the attached issue slide for presentation and discussion of the issue 3

JWFC Use of JTIMS and JLLIS During Exercises Submitted by: USNORTHCOM Proposed Issue 09-007: Direct Joint War Fighting Center (JWFC) / Deployable Training Teams (DTT) to use Joint Training Information Management System (JTIMS) Execution Tab and Joint Lessons Learned Information System (JLLIS), when requested by combatant commands, during JWFC supported exercises, to capture observations for future combatant command corrective actions. Discussion: CJCS and DOD mandate JTIMS and JLLIS as the observation and evaluation and lessons learned tools for combatant commands during joint exercises. Combatant commands receive JWFC / DTT and support for two designated exercises per year. During previous USNORTHCOM exercises, JWFC / DTTs do not record observations in JTIMS for training proficiency and JLLIS for command level issues and processes JWFC / DTT non-use of JTIMS and JLLIS is not cost and time effective; JWFC / DTT personnel render observations and recommended corrective actions, but non-recording of these observations in JTIMS and JLLIS negate the purpose of JTIMS and JLLIS being a data source and means for future corrective actions. Providing JWFC / DTT personnel JTIMS and JLLIS accounts and training requires minimal time and effort and would be accomplished by combatant command personnel prior to exercise start day. d. Directed use provides common systems of record. End state: Beginning FY10, JWFC / DTT personnel, if requested by combatant commands, use JTIMS and JLLIS to record observations during JWFC supported exercises. POA&M: JWFC / DTT coordinate with combatant command exercise planners during Joint Event Life Cycle requirements to use JTIMS and JLLIS. OPR: Joint Staff J7 OCRs: USJFCOM and combatant commands AUG 09 Ongoing OCT 10 Issue identified and resolved at WJTSC 09-02 JTIMS and JLLIS coordination during JELC JTIMS and JLLIS used by JWFC during combatant command exercises 4

Joint Training Enterprise Board / Working Group Tues, 25 Aug 09 CAPT Bill Kovach UNCLASSIFIED

Joint Training Enterprise Board Purpose: To work through Enterprise level requirements, activities, and shortfall issues focused on improving the Joint Training Environment. Discussion: In short bullets, describe the major themes from the working group activities. If the working group made decisions that need to be brought to the attention of the joint training community or are applicable to joint training policy / procedures, discuss them here. Keep the discussion limited to information that you think is relevant to the entire joint training community – remember that this audience has many senior participants and the objective is to brief at an executive level Conclusion: What is the take-away that you want the audience to understand about your working group and the work that you did. Issues: If the working group was assigned an issue from the master issue deck for discussion, then present the results of that discussion: Has the desired endstate remained the same; what are the changes to the POA&M; other pertinent discussion – clearly describe the way ahead and any show-stoppers to reach resolution on the issue. If the working group identified an issue/issues that needs senior leader visibility / involvement that should be added to the master issue deck for resolution by the joint training community – fill out the attached issue slide for presentation and discussion of the issue 6

Joint Training Enterprise WG Purpose: To work through Enterprise level requirements, activities, and shortfall issues focused on improving the Joint Training Environment. Discussion: In short bullets, describe the major themes from the working group activities. If the working group made decisions that need to be brought to the attention of the joint training community or are applicable to joint training policy / procedures, discuss them here. Keep the discussion limited to information that you think is relevant to the entire joint training community – remember that this audience has many senior participants and the objective is to brief at an executive level Conclusion: What is the take-away that you want the audience to understand about your working group and the work that you did. Issues: If the working group was assigned an issue from the master issue deck for discussion, then present the results of that discussion: Has the desired endstate remained the same; what are the changes to the POA&M; other pertinent discussion – clearly describe the way ahead and any show-stoppers to reach resolution on the issue. If the working group identified an issue/issues that needs senior leader visibility / involvement that should be added to the master issue deck for resolution by the joint training community – fill out the attached issue slide for presentation and discussion of the issue 7

JKDDC Stakeholders’ Meeting Tues, 25 Aug 09 Mr. Joe Camacho UNCLASSIFIED

JKDDC Stakeholders’ Meeting Purpose: To present, discuss and decide how we will operationally execute FY10 JKDDC resources to agreed upon goals, objectives, and priorities. Discussion: In short bullets, describe the major themes from the working group activities. If the working group made decisions that need to be brought to the attention of the joint training community or are applicable to joint training policy / procedures, discuss them here. Keep the discussion limited to information that you think is relevant to the entire joint training community – remember that this audience has many senior participants and the objective is to brief at an executive level Conclusion: What is the take-away that you want the audience to understand about your working group and the work that you did. Issues: If the working group was assigned an issue from the master issue deck for discussion, then present the results of that discussion: Has the desired endstate remained the same; what are the changes to the POA&M; other pertinent discussion – clearly describe the way ahead and any show-stoppers to reach resolution on the issue. If the working group identified an issue/issues that needs senior leader visibility / involvement that should be added to the master issue deck for resolution by the joint training community – fill out the attached issue slide for presentation and discussion of the issue 9

Joint Logistics Education, Training & Experimentation Transformation Wed, 26 Aug 09 Mr. Warren Bizub UNCLASSIFIED

Joint Logistics Ed, Training & Experimentation Transformation Purpose: Provide a briefing on the recently completed JLETT Joint Logistics Education, Training and Exercise Study (JLETES) to include a discussion on the methodology, findings, and recommendations of the JLETES and the results from the revised JLETES survey. Discuss a proposed roadmap to improve Joint (Interagency and Multinational) logistics education and training. Discussion: In short bullets, describe the major themes from the working group activities. If the working group made decisions that need to be brought to the attention of the joint training community or are applicable to joint training policy / procedures, discuss them here. Keep the discussion limited to information that you think is relevant to the entire joint training community – remember that this audience has many senior participants and the objective is to brief at an executive level Conclusion: What is the take-away that you want the audience to understand about your working group and the work that you did. Issues: If the working group was assigned an issue from the master issue deck for discussion, then present the results of that discussion: Has the desired endstate remained the same; what are the changes to the POA&M; other pertinent discussion – clearly describe the way ahead and any show-stoppers to reach resolution on the issue. If the working group identified an issue/issues that needs senior leader visibility / involvement that should be added to the master issue deck for resolution by the joint training community – fill out the attached issue slide for presentation and discussion of the issue 11

Other USJFCOM Issues

USJFCOM Development of JTF HQ Training Programs, Standards, and JMETL Briefer: ???? Issue 07-016: Update on status and milestones for USJFCOM efforts to lead the collaborative efforts for developing Joint Task Force Headquarters (JTF HQ) training programs / standards and Joint Mission Essential Task List (JMETL) conditions and standards. Discussion: CJCSI 3500.1E, Joint Staff Joint Training Policy and Guidance (JTP&G), dated 31 May 2008 tasks USJFCOM to lead collaborative development of joint training programs, processes, and standards and baseline JMETL conditions and standards for JTF HQ. (CJCSI 3500.1E: ENCL E, para 6.j) Endstate: Improved readiness for JTF HQ. Development of a JTF HQ Concept of Operations (CONOPS) that: provides a JTF HQ Force Readiness Model; describes a process and criteria for use by a designated Service HQ to prepare for assignment as a JTF HQ; and outlines manning, equipping, training and readiness criteria. POA&M: USJFCOM to coordinate collaborative development and update of progress to date and future milestones. OPR/OCR: USJFCOM APR 09 JUL 09 AUG 09 30 SEP 09 JTF HQ CONOPS JSAP Action Complete JTF HQ CONOPS JSAP Comments Adjudicated with C/S/A JTF HQ CONOPS JSAP Action: GO / FO Chop JTF HQ CONOPS Published 13 13 13 13

BACKUPS

Issue Management Guidance (How to Display POA&M) Issue 09-xxx: Identifies year generated and number of issue (Does not change). Describes joint training capability / requirement that is adversely affected and requires resolution. Discussion: Describes the critical elements of the issue / problem in sufficient detail based on Command/Organization discussions to develop potential solutions (Does not change). Endstate: The desired solution to sustain / increase joint training capability / readiness (May change based on development of POA&M) POA&M: Description of the possible steps to solve an issue / problem. POA&M will be visually displayed on a timeline at the bottom of the slide using the following symbology (To be refined and developed by OPR / OCR) OPR: OCR: Propose office primary responsible to coordinate and implement a solution USE 14 PT FONT AND SPELL OUT ALL ACRONYMS AT FIRST USE Used to depict and track major actions that must occur to resolve an issue / problem. Used to depict actions on the timeline that have been completed. Action milestone Action complete End state achieved MAR 09 SEP 09 DEC 09 MAR 10 JUL 10 SEP 10 Funding proposal drafted Funding proposal staffed Funding proposal approved Funding identified Funding provided to COCOMs