NERC Published Lessons Learned Summary

Slides:



Advertisements
Similar presentations
Summary of Second Draft of the NERC Standard PRC Disturbance Monitoring and Reporting JSIS Meeting August 10, 2010 Salt Lake City, UT.
Advertisements

1. Four LLs were published in February Transmission Relaying – Undesired Blocking 2.Lack of Separation for Critical Control Power Supply Leads.
Transmission Operator Protection System Misoperations 2014 ERCOT Transmission Protections System Misoperations Data – 138kV and 345kV Combined (Not including.
Presented to PGDTF February 11, 2015
Key Reliability Standard Spot Check Frank Vick Compliance Team Lead.
NERC Lessons Learned Summary December NERC lessons learned published in December 2014 Three NERC lessons learned (LL) were published in December.
Microprocessor-Based Relays: Implementation, Conflicts, and Corrective Actions Steven V. Deases AEP – Station Engineer.
EAS Lessons Learned Summary Lessons Learned Published in May 2014.
September 2014 Lesson Learned Summary. September 2014 LLs 2 Three NERC lessons learned (LL) were published in September 2014 LL Redundant Network.
NERC Lessons Learned Summary March NERC lessons learned published in March 2015 Two NERC lessons learned (LL) were published in March2015 LL
NERC Lessons Learned Summary
NERC Lessons Learned Summary April NERC lessons learned published in April 2015 Two NERC lessons learned (LL) were published in April 2015 LL
EAS Lessons Learned Summary Lessons Learned Published in August 2014.
SPS policy – Information Presentation Presentation to ROS June 16, 2004.
Submitting Course Outlines for C-ID Designation Training for Articulation Officers Summer 2012.
NERC Project S ystem Protection Coordination - PRC-027​ Presentation to the NSRS Conference Call August 17, 2015 Sam Francis Oncor Electric Delivery.
NERC Lessons Learned Summary February NERC lessons learned published in February 2015 Two NERC lessons learned (LL) were published in February 2015.
EAS Lessons Learned Summary Lessons Learned Published in June 2014.
Utility Engineers, PC.  Generation  Transmission  Distribution.
NERC Project S ystem Protection Coordination - PRC-027​ Presentation to the NSRS Conference Call April 20, 2015 Sam Francis Oncor Electric Delivery.
Loss of EMS Events 2015 System Operator Seminar. Training Objectives 2 System Operators will be able to identify the ERO Event Analysis Process Category.
NERC Lessons Learned Summary LLs Published in September 2015.
NERC Lessons Learned Summary LLs Published in December 2015.
Summary Event Analysis Subcommittee – LL Update NERC OC Meeting - June 2014.
Nodal Planning Go Live Austin, TX February 3, 2011
Reliability Standard TPL Transmission System Planned Performance for Geomagnetic Disturbance Events September 28, 2016 TPL Standard Status.
Chapter 8. Electrical Systems
Protection Relay Modeling for Transient Stability Simulation 10/26/2016 CJ Jing, David Franklin, Kevin Moran.
NERC Published Lessons Learned
NERC Published Lessons Learned Summary
NERC Published Lessons Learned
NERC Lessons Learned Summary
NERC Published Lessons Learned
Phase Angle Limitations
Inverter Disconnects During Transmission Disturbances
NERC Published Lessons Learned
EAS Lessons Learned Summary
NERC Published Lessons Learned
NERC Published Lessons Learned Summary
Planning Geomagnetic Disturbance Task Force (PGDTF) Update to the ROS
Reducing “Unknown” Misoperation Causes
NERC Published Lessons Learned Summary
PRC Implementation Plan and Summary of Devices
What is an Operation and Misoperation
Presented by: LADWP November 14, 2017
Removal of Fraser RAS from RAS Databse
NERC CIP Implementation – Lessons Learned and Path Forward
DrayWatch Training November 2009.
HIGHLIGHTING THE KEY CHANGES
Overview Key diagram of 220 KV Sub station, Ablowal Cables
Increased Efficiency and Effectiveness
Georgia Tech Protective Relaying Conference May 2, 2018
“TOP-010-1: Data Quality, Analysis Quality, and Alarm Process Monitor”
Background Information on Hurricane Matthew Event No.1 Event No.2
Presenter: Peter Heidrich, FRCC – BES Drafting Team Chair
A Tutorial on the Application and Setting of Collector Feeder Overcurrent Relays at Wind Electric Power Plants By: Stephanie Mercer.
ELECTRICAL POWER-II Electrical engineering sixth semester
Impacts and Actions Resulting from the August 14, 2003 Blackout
Specifications Updates and Approval
Protection Relay Modeling for Transient Stability Simulation 10/26/2016 CJ Jing, David Franklin, Kevin Moran.
Western Electricity Coordinating Council
Power System Protective Relaying-Part One
Western Electricity Coordinating Council
What is an Operation and Misoperation
Removal of Fraser RAS from RAS Databse
Reducing “Unknown” Misoperation Causes
System Review Work Group Update to TSS
Cyber Security of SCADA Systems Remote Terminal Units (RTU)
Roles and Responsibilities
Exercise 9 Power systems.
Presentation transcript:

NERC Published Lessons Learned Summary June 07, 2016

NERC Lessons Learned Published in May and June 2016 Two (2) NERC Lessons Learned (LL) were published in the 2nd quarter of 2016 LL20160501 - “Control Center Loss of SCADA Control and Monitoring Capability” LL20160601 - “Transmission Relaying – Relay Setting Issue”

Control Center Loss of SCADA Control and Monitoring Capability – Detail Transmission Operators (TOPs) adding a new group-control command function to operate multiple breakers at once Initial testing with five breakers was successful While executing the group-control command for nearly 300 other breakers, SCADA generated “CTRL ISSUED” alarms with invalid key information that resulted in SCADA aborting unexpectedly and restarting The restart failed again because the unacknowledged alarm was downloaded as part of the initialization process

Control Center Loss of SCADA Control and Monitoring Capability – Corrective Actions The vendor delivered a patch to address both the generation of invalid keys due to not checking against the maximum and the ability of SCADA to check for and ignore invalid key data Patch was installed and successfully verified on the test system and then loaded onto the production system and the EMS SCADA group-control command was exercised appropriately Vendor issued a Technical Flash-PTF 11-001 and posted the patch for all customers

Control Center Loss of SCADA Control and Monitoring Capability – Lessons Although the test system cannot truly verify that controls are sent to the RTUs, testing can be performed to show that applications on the EMS system do not fail Future testing of SCADA controls will provide any additional reviews deemed necessary to accommodate the scale of the required task When implementing new functions, the scale of operations to be performed should be considered and not just the operation itself Testing of new functions at the scale they will be used can preview potential issues

Transmission Relaying – Relay Setting Issue – Details The 230 kV line protection relays are connected on the 115kV side of a 230/115kV autotransformer and the 230/115kV transformer is in the 230 kV line protection zone The 115kV bus is a breaker and half arrangement which connects to three 115kV lines in addition to the autotransformer The 230 kV line relay operated on instantaneous ground directional (forward) overcurrent for a reverse fault (outside of the relays intended zone of protection) The relay misoperation resulted in the tripping of the two associated 115kV low side transformer breakers and the transfer tripping of the two remote terminal breakers of the 230kV line The 230/115kV transformer was a source of ground current for the fault

Transmission Relaying – Relay Setting Issue – Details The relay has a setting option to use the manufacturer’s algorithm which automatically calculates values to determine the direction of faults It has been the entities’ practice to employ this automatic calculation for determining the direction of faults The relay manufacturer was contacted and after studying the event, determined the reason the relay’s z0 (zero-sequence directional) element declared this fault forward (incorrectly)

Transmission Relaying – Relay Setting Issue – Corrective Actions The entity worked with the relay manufacturer to ensure the relay settings were corrected for this and similar applications Relevant settings basis templates were also revised Settings changes were shared with Protection and Controls Engineering staff and provided to its Engineering Vendors The relay manufacturer plans to clarify this relay setting approach in the future by including an additional setting option related to the directional elements The relay manufacturer will be recommending the new settings to customers when they communicate with them verbally or electronically The manufacturer has committed to including these recommendations in a technical papers whenever possible

Transmission Relaying – Relay Setting Issue – Lessons Must understand the operation of manufacturer recommendations, automatic settings and algorithms before applying them Refer to the Fundamentals and Improvements for Directional Relays technical paper for more details and guidance

Lessons Learned Survey Link NERC’s goal with publishing lessons learned is to provide industry with technical and understandable information that assists them with maintaining the reliability of the bulk power system. NERC requests that industry provide input on lessons learned by taking the short survey. A link is provided in the PDF version of each Lesson Learned.