2016 REIA Annual Meeting Larry Pratt

Slides:



Advertisements
Similar presentations
EDISON INTERNATIONAL® SM Green Technology and Renewable Energy Opportunities 4 th Annual India Trade Conference, June 23, 2011 Cerritos CA Gary Barsley.
Advertisements

GREATER PHOENIX ECONOMIC COUNCIL Economic Benefits of Solar and Renewable Energy PRESENTED BY BARRY BROOME, GPEC PRESIDENT AND.
Mauthe Center Solar Project NWTC Solar Advanced System Design Class.
Connecticut’s Energy Future Removing Barriers to Promote Energy Sustainability: Public Policy and Financing December 2, 2004 Legislative Office Building.
The Status Of The Electric Grid In ERCOT The Electric Reliability Council Of Texas Sam R. Jones, P.E. ERCOT – Retired As a retiree of ERCOT this presentation.
Wind Turbines: Power for a House or City *many slides from L. Sankar.
Solar Incentives for Arizona Public Service, Salt River Project, Tucson Electric Power.
Practical Ways For Towns to Save Money With Clean Energy Projects Paul Michaud Murtha Cullina LLP April 30, 2014.
System Reliability Procurement: Non-wires Alternatives in Rhode Island Tim Roughan National Grid.
PSNH "The Right Way" Attorney at Law: Simeon Marklin, Esq. MBA : Environmental Science.
Why Wind?.
NH Utilities Programs/ Carbon Reduction Opportunities Thomas Palma, Esq., CSDP Project Development Executive.
Resource Planning Georgia Power’s Diverse Plan to Meet Georgia’s Energy Needs AWMA Fall 2010 Conference October 7, 2010 Jeff Burleson Director of Resource.
Discussion of Feed-in Tariff Pilot Programs September 18, 2013 Presentation to the Regulatory Flexibility Committee of the Indiana General Assembly 1.
Creating A Cleaner Energy Future For the Commonwealth Focusing on Solar PV: Technology, Siting Considerations, Incentives Natalie Andrews Renewable Energy.
1 Managing Renewables Integration Valerie Fong Utilities Director Power Association of Northern California September 17, 2013.
1 Emerging Renewables Program Solar Conference North State Renewable Energy Chico, CA March 10, 2005 BILL BLACKBURN Lead, Emerging Renewables Program California.
Concentrator Photovoltaic Solar Generator Presented by Max Goldberger Hawaii County Economic Opportunity Council (HCEOC)
Developing and Integrated Energy Conservation and Renewable Strategy Renewable Energy Leadership Summit June 7, 2005 Lenox, MA.
F LORIDA S OLAR E NERGY C ENTER Creating Energy Independence Since 1975 A Research Institute of the University of Central Florida Taking Charge of Our.
Power transmission and generation politics Mitchell Johnston CBE /27/2014.
Best Bang for the kW ARRA Funded Small Solar Projects John Schmadeke, Agua Fria UHSD September 9, 2009.
1 Presentation by: Tony Morgan, Deputy Director.  Legislatively designated state energy policy development office within Florida  Evaluate energy related.
Wind Power in New Hampshire 2016 ACEC / NHDOT Technical Exchange Conference April 7 th, 2016.
Creating A Greener Energy Future For the Commonwealth Clean Heat & Power in Massachusetts John Ballam, P.E. Manager of Engineering & the CHP Program MA.
Renewable Distributed Generation and Public Water Supply Utilities CWWA/CTAWWA Fall Conference Paul R. Michaud, Esq. October 20, 2015.
Lee Lenox● 13.9 MW ● Lee & Lenox, MA. GREEN POWER.
Power Purchase Agreements (PPA) Owner’s Perspective What is a Power Purchase Agreement? Agreement to purchase power from a third-party provider Fixed term:
Power Tower Renewable Energy For Botswana CONTENTS POWER TOWER PROJECT
Communities Renewable Energy Study
Massachusetts Clean Energy Center Budget Overview
Public Power’s Role in the Clean Energy Future
Wind Energy in Iowa Lori McDaniel
Solar Energy Aides City Efficiencies and Cost Savings
Wyoming Utility Efficiency Exchange October 4, 2008 Rob Morris
FUEL CELLS.
San Antonio Energy Efficiency Potential: Preliminary Assessment
Restructuring Roundtable March 24, 2017 Boston, MA
2017 Integrated Resource Plan
PV SOLAR PROJECT OPPORTUNITIES
East Bay Community Energy Local Development Business Plan
Phase 3 Solar Feasibility Study Findings and Recommendations
Finding Pennsylvania’s Solar Future
Wind Industry Market and Policy Overview
Renewable Energy Markets
Indian Energy Initiatives Panel
The Joint Accounting Conference 2018
Rose Drive Friends Church Solar Project Proposal
NS4960 Spring Term, 2018 China: Expanded Renewables
ESP Electric Storage Partners, LLC An Energy Storage Project Developer
State Allocation Board Hearing Solar Energy and Energy Efficiency Project Options for California Schools Mark Johnson, Energy Solutions Manager - Schools.
Which path to Choose? Zero Carbon Glendale Project
Case No UT PNM Workshop Comments
The Green Communities Act: WMECO perspective
Strategic Energy Plan.
Renewable Energy Project Investments
The GridSolar Project Presentation – NRCM January 21, 2010
SOLAR POWER – BOONVILLE WWTP CASE STUDY September 19, 2018 Charles R
Metropolitan Mayors Caucus Illinois Energy Bills
23rd Annual NM Infrastructure Conference Improve infrastructure using Self-funding Using Lease Purchase: Public-Private partnership Agreements.
New England Economic Partnership James Daly Vice President Energy Supply Energy Market Perspectives Reliable Energy, Competitive Prices and.
Arizona Public Service Company 2012 Renewable Energy Standard Implementation Plan Arizona Corporation Commission Open Meeting August 17, 2011.
Solar Panels on Your Home & in Your Community
Tennessee Valley Authority – Energy Initiatives and Challenges
Photovoltaic Systems Engineering Application to PV Systems
State of Vermont Energy Stimulus Plan
How Small Developers and EPC Contractors Can Add PPA Financing to their Arsenals John Langhus, VP Business Development Midwest Solar Expo 2019 New Energy.
The Risks to Coal Plants in Coming Years
PG&E EV Fleet Program.
PG&E EV Fleet Program.
Presentation transcript:

2016 REIA Annual Meeting Larry Pratt Project Antelope 2016 REIA Annual Meeting Larry Pratt

a.k.a. Las Lunas Facebook Data Center “electron cannot be traced” PRC case page 9 of 44 PRC case #16-00105-UT PNM’s application to add 80 MW of peaking resource

Prineville, Oregon Facebook data center Utility sub-station (will be 115 kV service for Los Lunas) Cold storage building ?? 2 data server buildings, 5 acres each rooftop for perspective The Node Pole (cold and hydro) The Node Pole is located in Lulea, Sweden Sweden electricity generation is 44% hydro power Small solar farm 24 panels/array 17 2-axis trackers Maybe 120 kW ?? 189,000 kWh/year 113 servers

Economics and Jobs One to six buildings, each costing $250 million First phase fully operational by late 2018 (30 MW AC) Estimated to bring 30 to 50 jobs at the data center and 200-300 construction jobs over seven years Expected to attract other companies to area Incentives: Up to $30 billion in IRBs, $10 million in LEDA to purchase water rights, tax reimbursement up to $1.6 million, possible JTIP funding Credit Marie C. Baca / Journal Staff Writer IRBs = Industrial Revenue Bonds LEDA = Local Economic Development Act

Energy and jobs “We are committed to powering our owned and leased data center operations with clean and renewable energy” – Facebook FB requires the additional renewable energy be over and above existing RPS requirements This is a major bright spot in the face of potentially dwindling state and federal clean power plans Other companies are making similar demands on utility companies 3 solar farms to support initial 30 MW AC for FB None larger than 20 MW AC. Up to 110 MW AC allowed over the growth of the project, likely to include wind PNM selected solar for initial phase due, in part, to a solid track record of providing utility scale solar on schedule and within budget NM has a great solar resource, among the best in the country Valencia, Bernalillo, San Miguel, Sandoval, and Santa Fe counties are under consideration REIA supported PNM in the PRC case 16-0091-UT this year to allow expedited approval for a solar power purchase agreement in order to attract Facebook to NM “Facebook is bringing their own energy” – quote from a PNM exec at a recent panel discussion Large customers like FB with high load factors benefit PNM and it’s customers by improving the “load factor” and grid stability FB will be charged Production Costs and Fuel/Transmission costs when the solar resources are producing less than the load FB will pay 2.3 cents / kWh for Production Charge for first 10 years whenever solar output is less than load. Section 39. SSR = Special Service Rate Excess power from solar will be purchased by PNM at Palo Verde market rates. Section 44 Extension of 115 kV service to data center will be paid for up front by FB. 30 MW AC proposed by PNM to be owned by PNMR-D, an affiliate of PNM. Section 50 3 25-year PPA for systems no larger than 20 MW AC, located in central NM PNM selected Solar, in part, because recent projects have been completed on schedule and within budget. Section 51 Potential locations include the following counties: Valencia, Bernalillo, San Miguel, Sandoval, and Santa Fe. Section62. 2014 IRP amendment include the FB plan. Section 68 110 MW maximum allowed at full build out, likely to include wind. Section 70. FB no eligible for energy efficiency program rebates. Section 92.

Water needed for cooling the servers Air passed through filters 2nd story Outside Air Facebook claims 25,000 gallons per day will be used (28 acre-feet / year) Los Lunas has committed up to 4.5 million gallons per day (13.8 acre-ft/day) 30 MW of renewable saves ~ 100 acre- feet / year of water that would otherwise be needed for fossil fuel generation “Indirect Evaporative Cooling” used to cool the “hot aisles” below Facebook’s Altoona data center, Iowa

Summary Corporate demand for renewable energy is good for our business and hopefully a growing trend New Mexico has a competitive advantage given our solar resource and relatively mild climate (good for solar PV and cooling) We need to work together with PNM to bring more of these projects to NM Data centers require a significant amount of water resources for cooling, and all the more reason to power that growth with PV and wind