Pacific Northwest Aggregated Demand Response Demonstration Project

Slides:



Advertisements
Similar presentations
Electronic Scheduling Work Group Joint Guidance Committee Meeting July 23, 2002 Bob Harshbarger ESWG Chair
Advertisements

Overview of Property Tax Valuation and Equalization
How Technology will make Renewable Energy Competitive 10/17/2013
1 Economy in Review Southeastern Washington Southeast Regional Academy- PWB & CERB Ajša Suljić-Regional Labor Economist Employment Security Department.
Basic Food Employment and Training (BFET)
The Antipsychotic Atlas Project - Overview Kennedy, J (PI); S Murphy; S McPherson & M Layton (co-Is) Start date: 9/13End date: 8/15 This research project.
About the Poll The Washington Poll is a non-partisan, academic survey research project sponsored by the Washington Institute for the Study of Ethnicity.
2015 Session Update Budget impasse spawns special session (30 day) Solar incentive bill unable to move so far Republican carbon reduction bill not moving.
Saving Megawatts with Voltage Optimization
Spring/Summer 2004 Citizen Corps Volunteer Issues Liability & Credentialing.
© ABB SG_Presentation_rev9b.ppt | 1 © ABB SG_Presentation_rev9b.ppt | 1 Smart Grid – The evolution of the future grid Karl Elfstadius,
© 2004 by David T. Olson Sample - Not for Public Use1 A Sample Presentation of The State of the Church in Washington and the Seattle and Spokane Metro.
California's three large IOUs collectively served 12.7% of their 2007 retail electricity sales with renewable power. – Pacific Gas and Electric (PG&E)
Washington State Low-Income Energy Needs Research 2007 Washington State Energy Assistance Coordinators Conference October 2, 2007 Jacqueline Berger, APPRISE.
Quality Improvement: The Medical Home Leadership Network Kate Orville, MPH Washington State Partnerships for Medical Homes Meeting November 2, 2006 Kate.
Energy Storage and Renewable Integration. 2 Dynapower Dynapower Corporation Dynapower Corporation is the world’s leading Independent manufacturer of standard.
Washington State Medical Surge Healthcare Coalitions NW Tribal Emergency Mgt. Council – Tulalip June 7, 2007.
ETAAC Energy Sector Energy Storage Smart Grid July 12, 2007 San Francisco, CA.
Licensing Practices Survey. 19 Counties Participated Benton Chelan Clark Columbia Cowlitz Douglas Grant Grays Harbor Island Jefferson County Lincoln Mason.
Study Goal:  Perform a “bottom-up” assessment of the sustained peaking capacity of the Pacific Northwest Hydro System over the highest 18 hours in a 3.
WASHINGTON STATE DEPARTMENT OF COMMERCE EITC Outreach: We’re the State and We’re Here to Help! November 2, 2009.
PJM©2009www.pjm.com Implications of Electric Transportation for the National Grid Ken Huber PJM Interconnection February 19, 2010.
1 City of Port Angeles Strategic Planning Presentation June 7, 2011 Presented by: Gary Saleba, President EES Consulting, Inc. A registered professional.
CALIFORNIA ENERGY COMMISSION Status Report Demand Responsive Building Program William J. Keese California Energy Commission March 30, 2001.
Public Health and You Name of agency Speaker, Title.
Motor Vehicle Fuel Tax (MVFT) Calculations Don Zimmer, Road Systems Inventory Manager.
Healthy Options and Health Homes May 6, What is a Health Home? A “Health Home” is a network of community based providers who will work together.
Island County Moderate Risk Waste DEMOGRAPHICS Population: 79,275 Housing Units: 40,850 4 MRW Collection Sites – 3 on Whidbey Island – 1 on Camano Island.
Northwest Power and Conservation Council 1 Distribution System Efficiency Potential & Conservation Voltage Reduction Power Committee April 2009.
Calculation of Motor Vehicle Fuel Tax Distribution Factors for 2010 and 2011 Presented By: Don Zimmer Road System Inventory Manager Washington State County.
January 29, 2010Resource Adequacy Steering Committee 1 Sustained Peaking Capacity Analysis Initiated by the Adequacy Forum Input Information from Utilities.
NGA BIOTERRORISM REGIONAL POLICY WORKSHOP SAN FRANCISCO May 13, 2004 John Erickson.
Balancing Act: Launching Pentacel during the Hib Shortage Jan Hicks-Thomson, MSW, MPA Washington State Department of Health.
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Page 1 Pacific Northwest Smart Grid Demonstration Project  Largest Smart Grid Demonstration.
Hawaii Energy Storage Seminar: Utility Regulation Service
Computationally speaking, we can partition problems into two categories. Easy Problems and Hard Problems We can say that easy problem ( or in some languages.
1 1 DISTRIBUTION EFFICIENCY INITIATIVE (DEI) Benefits on Both Sides of the Meter RTF MEETING February 5, 2008.
WASHINGTON CONNECTION COMMUNITY PARTNERSHIP. Washington Connection Update 2 New Features for May 19, 2013 Release  Add State or Federal food benefit.
PEAK CAPACITY COST & DEMAND RESPONSE PACIFIC NORTHWEST DEMAND RESPONSE PLANNING COMMITTEE BILL DICKENS TACOMA POWER FEBRUARY 23, 2012.
Public Health and You Name of agency Speaker, Title.
This module will dig deeper into Smart Grid implementation issues. It will focus on two key issue of particular interest to the PNW: 1)How the Smart Grid.
Évora demonstrator site
COHO, Sockeye and Chinook
Modeling DER in Transmission Planning CAISO Experience
SCE Energy Storage Perspective
Community Asset Mapping:
Commercial Customer Demand Response Program Pilot
Welcome to the UW LEND ADOPT A COUNTY Project
What is a HIDTA? HIDTAs are part of the national drug control strategy. They are grant programs managed by the Office of National Drug Control Policy,
The Columbia River Treaty and its Future
WA Suicide Facts On average day in WA, there are: 3 suicides.
Small Modular Reactors
WIC/Immunization “Record Round-up” Project: Filling the Gaps
Évora Demonstrator Site
Demand Response in the 7th Power Plan
The Transition to a High DER Future
Opportunities in the Changing Energy System
Module 4 Smart Grid Implementation Issues
Assessment, Treatment & Management of Suicide
Jan Hicks-Thomson, MSW, MPA
NW Demand Response Symposium
Association of Washington State Public Facilities District
New England Electricity Restructuring Roundtable
Energy Northwest 1957 A not-for-profit Municipal Corporation
2500 R Midtown Sacramento Municipal Utility District
Community Asset Mapping
Environmental Sustainability Manager
Community Asset Mapping
ELEC-E Smart Grid Battery Energy Storage Systems
UM 1856 PGE’s Energy Storage Proposal – Commission Workshop #1
Presentation transcript:

Pacific Northwest Aggregated Demand Response Demonstration Project Northwest Demand Response Symposium September 28, 2016 – Seattle WA John Steigers Lead – Applied Technology & Innovation Energy Northwest

Energy Northwest 1957 A not-for-profit Municipal Corporation Asotin County PUD Clark Public Utilities Kittitas County PUD Pend Oreille County PUD Benton County PUD Cowlitz County PUD Klickitat County PUD Seattle City Light Chelan County PUD Ferry County PUD Lewis County PUD Skamania County PUD City of Port Angeles Franklin County PUD Mason County PUD 1 Snohomish County PUD City of Richland Grant County PUD Mason County PUD 3 Tacoma Public Utilities City of Centralia Grays Harbor County PUD Okanogan County PUD Wahkiakum County PUD Clallam County PUD 1 Jefferson County PUD Pacific County PUD

Energy Northwest Cost-based generation and services to regional public power Owns and operates over 1,300 megawatts of nuclear, hydroelectric, solar, and wind generation assets Current development efforts underway include demand side management resources, wind, small modular nuclear, photovoltaic solar, and distributed energy storage

What is the Pilot? BPA, as balancing authority, is obliged to balance its system 4,300(+) MW intermittent wind generation Increasingly less capacity and flexibility of its hydroelectric resources EN’s Pilot provides BPA 35 MW of Fast Firm INC balancing reserve “Fast” < 10-minute Response From Notification “Firm” 24/7 obligation to perform; no “opt-out” in real time “INC” Load Reduction (same net effect as a generation increase) BPA compensates EN with performance-based capacity fee Incentives to participants from EN. No event or energy-based compensation; capacity fee only Limits on call frequency, number, and duration Timeline – February 2015 through Jan 2016 Diverse load-response assets

City of Richland WA Demand Voltage Reduction (DVR) (10) 115/13.8kV substations; (15) load tap changing transformers (71) distribution feeder voltage and load metering points Direct DRACS to SCADA connection Fixed voltage increments (2.5%) Capacity – 850 kW Typically, each 1% voltage change yielded >0.75% load change.

North Pacific Paper Corporation (NORPAC) Cowlitz Public Utility District (3) newsprint machines (9) wood to fiber refiner lines (4) 5,000hp(+) motors per line Direct DRACS to facility DCS Real-time meter data out & event control signals in Shuts down (2) refiner lines; (8) motors ->20(+) megawatts

Powin Energy Battery Energy Storage System Portable, self-contained, 968 lithium ion batteries Onboard communications, server/BMS, power electronics 120kW in/out 500kWh storage Connections at 480vAC 3-phase Very fast response Deployed in Tualatin OR

Ponderay Newsprint Company (PNC) Pend Oreille Public Utility District (1) newsprint machine; (2) thermal-mechanical refiner lines (3) 25,000hp drive motors per refiner line Direct DRACS to DCS connections (1) refiner line taken off line for DR Events (3) motors ->16 MW(+)

Demand Response Aggregated Control System (DRACS) Purpose-developed by EN & Resource Associates International Provides core functionality to the Pilot resource Potential to support additional demand side management products Potential to support distributed storage monitoring & control Robust SCADA-based architecture, data management, & security Cloud-based secure communications; FISMA-compliant Functionality Communicates with BPA DROMS via Open ADR v2.0 protocol Monitors asset status 24/7, loads, comms pathways; alarms/alerts Receives event notifications; calls for assets’ response; monitors and reports load response to BPA in real time, all utilities, and all assets Transaction settlements and records for BPA

1502-052 February 24, 2015

Results 85 Events; 94% success; 98% availability Awarded national award for innovation and excellence in DR programs by Peak Load Management Alliance (PLMA) Strongly demonstrated: Effective use of a demand response based resource as an in-hour balancing reserve for BPA. High performance of an all-public-power aggregated demand resource team.

Questions? Interest? Contacts John Steigers Project Manager/Generation Project Development (509) 377-4547 jasteigers@energy-northwest.com Leo Quiachon Manager O&M Professional Services (509) 377-8610 liquiachon@energy-northwest.com Jim Gaston General Manager Energy Services & Development (509) 377-8347 jwgaston@energy-northwest.com