Standard Design Process (SDP) Interfacing Procedures Ashley Taylor TVA

Slides:



Advertisements
Similar presentations
ESEA FLEXIBILITY RENEWAL PROCESS: FREQUENTLY ASKED QUESTIONS January29, 2015.
Advertisements

Slide No. 1 IAEA Developed by NSNI Division, IAEA under the supervision of Mr. Marco Gasparini (PNRA supported in the development under TC-Project PAK/09/028)
INFORMATION SYSTEM APPLICATIONS System Development Life Cycle.
1 Our Expertise and Commitment – Driving your Success An Introduction to Transformation Offering November 18, 2013 Offices in Boston, New York and Northern.
SENG521 (Fall SENG 521 Software Reliability & Testing Software Product & process Improvement using ISO (Part 3d) Department.
ISM 5316 Week 3 Learning Objectives You should be able to: u Define and list issues and steps in Project Integration u List and describe the components.
California Department of Public Health / 1 CALIFORNIA DEPARTMENT OF PUBLIC HEALTH Standards and Guidelines for Healthcare Surge during Emergencies How.
Standard Design Process Overview
1 Transition to ICD-10 UC San Diego Health System 2015.
URBAN STREAM REHABILITATION. The URBEM Framework.
Design Oversight Working Group (DOWG) – Next Steps
Title I Program Overview for SWP
Continuous Improvement Project (A Guideline For Sponsors)
Role of The Software Development Plan (SDP)
DNP Initiative ENG-003 Standard Design Process Overview Configuration Management Benchmarking Group June 12, 2017.
Pat Nestor MSCSI MRICS Head of Building Control Dublin City Council
Project Management PTM721S
Best Practices in Performing DSA Legacy Reviews
Title I Program Overview for SWP
Chapter 1: Introduction to Systems Analysis and Design
Position Statement on Sealed Truss Placement Diagrams for the State of Texas Overview Revised 3/23/2017.
Business System Development
Particular Conditions of Contract & Appendix to Tender
Topic for Presentaion-2
TechStambha PMP Certification Training
Title I Program Overview for TAS
Industry Guidance on Part 21 Evaluation and Reporting
Standard Design Process (SDP) Change Management Ashley Taylor TVA
EOB Methodology Overview
Flooding Walkdown Guidance
Mitigation of Beyond Design Basis Events (MBDBE) Rule Implementation
Level 1 Level 1 – Initial: The software process is characterized as ad hoc and occasionally even chaotic. Few processes are defined, and success depends.
IS442 Information Systems Engineering
Instructions for the WG Chair
Particular Conditions of Contract & Appendix to Tender
DSQR Training Control Plans
Part C State Performance Plan/Annual Performance Report:
CMMI – Staged Representation
Engineering Processes
Instructions for the WG Chair
Dr Sue Barrell, Australia
Review of Part C of the Code – Inducements & Applicability
ENG-008: Standard Digital Engineering Process
2-1-1 Automated Verifications
Standard Design Process (SDP) Software Tom Czerniewski Entergy Nuclear
Project Management Process Groups
Approaches to Implementing in Your Organization
Instructions for the WG Chair
Instructions for the WG Chair
Optimize faculty load & course scheduling Summary of Recommendations
Chapter 1: Introduction to Systems Analysis and Design
MODULE B - PROCESS SUBMODULES B1. Organizational Structure
Temporary Alterations in Support of Maintenance and Temporary Modifications Beth Kernes Krause - Cooper Station February 24, 2019 Cleveland 2005.
Project Title Subtitle: make sure you specify it is a research project
TRTR Briefing September 2013
Engineering Processes
Accommodations Required Content for STC and TA Training
Accommodations Required Content for STC and TA Training
Common Understanding Way forward
Module 3 Part 2 Developing and Implementing a QI Plan: Planning and Execution Adapted from: The Health Resources and Services Administration (HRSA) Quality.
Site (e.g., LARC Embakasi)
Introduce myself & around table
Fiscal policy program Presented by Cindy Draper, Fiscal Policy Officer – Training Days 2018 Introduce myself This session is to provide an overview of.
Chapter 1: Introduction to Systems Analysis and Design
Software Reviews.
Name of Your Outcome Presenter’s Name, Organization and
Accommodations Required Content for STC and TA Training
Radiopharmaceutical Production
[Ballot code, contract number] [Project title]
[Ballot code, contract number] [Project title]
Presentation transcript:

Standard Design Process (SDP) Interfacing Procedures Ashley Taylor TVA

Overview – SDP Interfacing Procedures General Requirements “Primary” Interface Procedure Other Interfacing Procedures Lessons Learned Breakout Preview

Guidelines & Descriptions SDP Interfaces Codes & Standards Guidelines & Descriptions Procedure & Process IP-ENG-001 Interfacing Procedures Resource Manual This interface diagram was used as part of the SDP site training, and today’s topic will focus on the center of the pyramid, specifically the Utility interface procedures for the Standard Design Process, IP-ENG-001. These interfacing procedures serve a number of purposes, which will be described in subsequent slides.

Interfacing Procedures - General Requirements Sect. 1.0 of IP-ENG-001: “…This procedure is to be utilized in conjunction with Utility-specific procedures that implement interfacing processes that support the design control, Engineering Change and configuration management processes.” Sect. 6.0 of IP-ENG-001: Lists “key generic utility interfaces in which the various phases of the Standard Design Process require the use of Utility-specific procedures, programs and processes (if applicable) to develop the product necessary to support the change package or otherwise perform the interfacing activity.”

Utility “Primary” Interface Procedure Endorses industry procedure IP-ENG-001 as written, including the associated forms Technical, cross-discipline and commitment reviews / approvals of interface procedure “include” the industry procedure Provides cross-references of the generic SDP terminology to Utility-specific terms Provides Utility-specific guidance on SDP roles and responsibilities (e.g., titles, designees, etc.)

Utility “Primary” Interface Procedure (cont.) Provides references to Utility-specific interfacing procedures (including those referenced in Sect. 6.0 of IP-ENG-001) Provides Utility-specific transition instructions (e.g., design changes already in progress, “sunset” provisions, etc.) Provides reference to any Utility-specific Licensing and Quality Assurance program commitments which are addressed in the industry procedure

Utility “Primary” Interface Procedure (cont.) Options: Create New Utility Procedure + “Easy” for procedure users (i.e., just use new procedure for “new” design changes, existing procedure for “old” ones) - May have to revise other interfacing Utility procedures to reference the new procedure Revise Existing Utility Procedure Must clearly delineate which sections of procedure apply to “new” versus “old” process during transition period + May not have to revise other interfacing Utility procedures which reference existing Utility procedure for design changes

Other Interfacing Procedures Sect. 6.0 of IP-ENG-001 lists key generic utility interfacing processes used in the SDP but (e.g., Calculation process, Drawing process, etc.) Utilities will continue to follow their Utility-specific procedures for these processes until standardized In some cases, IP-ENG-001 will provide suggested guidance on what to include in a Utility-specific procedure for a specific process (this can be used at Utility discretion to enhance their current procedures)

Cross-Reference to Utility Procedures Example

Interfacing Procedures - Lessons Learned May need to create or update Utility procedure(s) if a Utility does not currently have a formal procedure for all the interfacing processes referenced in Sect. 6.0 of IP- ENG-001 Many of the SDP procedure “issues” identified during the pilot related to the interfacing procedures vs. SDP Recommend performing “table top” reviews / walk- throughs of “primary” interface procedure with relevant SMEs to ensure there are no gaps or deltas Other Lessons Learned

Breakout Preview Review actual examples of Utility “primary” interface procedures using different approaches New procedure Revision to existing procedure Solicit feedback and operating experience from other utilities regarding interfacing procedures Answer any specific questions relating to the process of creating / revising interface procedures

QUESTIONS?