IPAS SPring-8 FADC Project 章文箴 蘇大順 04/26/2002. Super Photon Ring 8 GeV (SPring-8) Harima Science Garden City.
Time Projection Chamber
Ultrafast 16-channel ADC for NICA-MPD Forward Detectors A.V. Shchipunov Join Institute for Nuclear Research Dubna, Russia
1 MICE Tracker Readout Update, Preparation for Cosmic Ray Tests Introduction/Overview AFE-IIt firmware development VLSB firmware development Hardware progress.
DSP online algorithms for the ATLAS TileCal Read Out Drivers Cristobal Cuenca Almenar IFIC (University of Valencia-CSIC)
6 June 2002UK/HCAL common issues1 Paul Dauncey Imperial College Outline: UK commitments Trigger issues DAQ issues Readout electronics issues Many more.
Large Area, High Speed Photo-detectors Readout Jean-Francois Genat + On behalf and with the help of Herve Grabas +, Samuel Meehan +, Eric Oberla +, Fukun.
Development of novel R/O electronics for LAr detectors Max Hess Controller ADC Data Reduction Ethernet 10/100Mbit Host Detector typical block.
TOF Electronics Qi An Fast Electronics Lab, USTC Sept. 16~17, 2002.
Preliminary Design of Calorimeter Electronics Shudi Gu June 2002.
BESIII Electronics and On-Line BESIII Workshop in Beijing IHEP Zhao Jing-wei Sheng Hua-yi He Kang-ling October 13, 2001 Brief Measurement Tasks Technical.
1 LEPS TPC Electronics 章文箴 Wen-Chen Chang Institute of Physics, Academia Sinica 03/30/2001.
Data is sent to PC. Development of Front-End Electronics for time projection chamber (TPC) Introduction Our purpose is development of front-end electronics.
Prototype Test of SPring-8 FADC Module Da-Shung Su Wen-Chen Chang 02/07/2002.
MiniBoone Detector: Digitization at Feed Through Student: John Odeghe ; SC State, Fermi Lab Intern Supervisor: JinYuan Wu; Fermi Lab 1.
K.C.RAVINDRAN,GRAPES-3 EXPERIMENT,OOTY 1 Development of fast electronics for the GRAPES-3 experiment at Ooty K.C. RAVINDRAN On Behalf of GRAPES-3 Collaboration.
Leo Greiner TC_Int1 Sensor and Readout Status of the PIXEL Detector.
S.Vereschagin, Yu.Zanevsky, F.Levchanovskiy S.Chernenko, G.Cheremukhina, S.Zaporozhets, A.Averyanov R&D FOR TPC MPD/NICA READOUT ELECTRONICS Varna, 2013.
First ideas for the Argontube electronics Shaper, simulations Block Diagram for analog path Delta Code Data Reduction Bus system, Controller Max.
Features of the new Alibava firmware: 1. Universal for laboratory use (readout of stand-alone detector via USB interface) and for the telescope readout.
The DRS2 Chip: A 4.5 GHz Waveform Digitizing Chip for the MEG Experiment Stefan Ritt Paul Scherrer Institute, Switzerland.
NUMI Off Axis NUMI Off Axis Workshop Workshop Argonne Meeting Electronics for RPCs Gary Drake, Charlie Nelson Apr. 25, 2003 p. 1.
22 September 2005 Haw05 1  (1405) photoproduction at SPring-8/LEPS H. Fujimura, Kyoto University Kyoto University, Japan K. Imai, M. Niiyama Research.
FPGA firmware of DC5 FEE. Outline List of issue Data loss issue Command error issue (DCM to FEM) Command lost issue (PC with USB connection to GANDALF)
Front-End Electronics for PHENIX Time Expansion Chamber W.C. Chang Academia Sinica, Taipei 11529,Taiwan A. Franz, J. Fried, J. Gannon, J. Harder, A. Kandasamy,
HBD/TPC Electronics Status Works done to for a)Prototype detector readout b)Understand packing density and heat loading issues c)Address the overall system.
1 MICE Tracker Readout Update Introduction/Overview TriP-t hardware tests AFE IIt firmware development VLSB firmware development Hardware progress Summary.
Time and amplitude calibration of the Baikal-GVD neutrino telescope Vladimir Aynutdinov, Bair Shaybonov for Baikal collaboration S Vladimir Aynutdinov,
TPC electronics Status, Plans, Needs Marcus Larwill April
Click to edit Master subtitle style Presented By Mythreyi Nethi HINP16C.
.1PXL READOUT STAR PXL READOUT requirement and one solution Xiangming Sun.
1 19 th January 2009 M. Mager - L. Musa Charge Readout Chip Development & System Level Considerations.
Pisa - Apr. 28th, The Trigger System Marco Grassi INFN - Pisa.
D. Attié, P. Colas, E. Delagnes, M. Riallot M. Dixit, J.-P. Martin, S. Bhattacharya, S. Mukhopadhyay Linear Collider Power Distribution & Pulsing Workshop.
Pixel structure in Timepix2 : practical limitations June 15, Vladimir Gromov NIKHEF, Amsterdam, the Netherlands.
Vladimir Zhulanov for BelleII ECL group Budker INP, Novosibirsk INSTR2014, Novosibirsk 2014/02/28 1.
TDC and ADC Implemented Using FPGA
DAQ ACQUISITION FOR THE dE/dX DETECTOR
Budker INP V.Aulchenko1,2, L.Shekhtman1,2, V.Zhulanov1,2
High Energy Physics experiments.
DCH FEE STATUS Level 1 Triggered Data Flow FEE Implementation &
FEE for TPC MPD__NICA JINR
Jinfan Chang Experimental Physics Center , IHEP Feb 18 , 2011
A General Purpose Charge Readout Chip for TPC Applications
LHC1 & COOP September 1995 Report
14-BIT Custom ADC Board Rev. B
SPring-8 FADC Module Compiled by Wen-Chen Chang Updated: 07/12/2002.
Readout System of the CMS Pixel Detector
Iwaki System Readout Board User’s Guide
KRB proposal (Read Board of Kyiv group)
PSD Front-End-Electronics A.Ivashkin, V.Marin (INR, Moscow)
DCH FEE 28 chs DCH prototype FEE &
Power pulsing of AFTER in magnetic field
A First Look J. Pilcher 12-Mar-2004
Possible Upgrades ToF readout Trigger Forward tracking
LHCb calorimeter main features
Status of n-XYTER read-out chain at GSI
CLAS12 Timing Calibration
BESIII EMC electronics
Stefan Ritt Paul Scherrer Institute, Switzerland
On behalf of MDC electronics group
The Trigger System Marco Grassi INFN - Pisa
The CMS Tracking Readout and Front End Driver Testing
Front-end Electronics for the LHCb Preshower Rémi CORNAT, Gérard BOHNER, Olivier DESCHAMPS, Jacques LECOQ, Pascal PERRET LPC Clermont-Ferrand.
PID meeting Mechanical implementation Electronics architecture
RPC Electronics Overall system diagram Current status At detector
for BESIII MDC electronics Huayi Sheng
Presentation transcript:

IPAS SPring-8 FADC Project 章文箴 蘇大順 04/26/2002

Super Photon Ring 8 GeV (SPring-8) Harima Science Garden City

Laser Electron Photon

LEPS Detector Configuration

TPC inside LEPS Detectors

Time Projection Chamber

Working Principles of Time Projection Chamber Passage of charged particles through the gas generates ionization electrons. Electrons drift towards the readout plane along the imposed E x B drifting fields. At the end of readout plane, an avalanche (amplification) will happen upon the arrival of electrons by the proportional sense wires and an induced image charge on the corresponding cathode pads. The pads are connected with a read-out electronics which provides low-noise and high resolution analogue information as well as the drift time associated with the signal.

Electric Field Configuration Grid Wire Sense Wire Field Wires Cathod

Determination of the Particle Trajectory

Particle Identification by dE/dx vs. P

Time Projection Chamber at SPring-8 LEPS Experiment

Time Projection Chamber at Spring-8 LEPS Experiment

Readout Pads of TPC

Zoom-in View of Wires

TPC Inside the Solenoid Magnet at SPring-8

View of Particle Trajectory along the beam in Simulation

TPC Mechanical Specification Inner radius: < 1.25 cm. Outer radius: < 30 cm. Read out channels: 95 sensing wires, 1000 pads. Pad size:inner 8mm*8mm, outer 8mm*13mm. Distance between sensing wires and pads: 4mm. Separation of sensing wire: 4mm. Cathode readout. Maximum drift distance : about 70 cm. Maximum drift time: about 14 sec with drift velocity = 5.1 cm/sec.

Requirement of TPC Electronics Good energy resolution: measuring dE/dx from the charge readout of either wires or pads for the particle identification for K/p separation at low momentum. Requirement of spatial resolution: x,y < 300 m. z < 1 mm. Position information: x(t),y(t): x from fired sense wires; y from interpolation of signals on pads(t). z(t) from time bin of FADC time slice. Timing information: fitting of pulse peak in FADC. On-board zero-suppression to ensure fast data transfer and short system dead time.

Digitizer in TPC Electronic: FADC Large data size: High sampling rate: 40 MHz = 25 nsec. Read-out bit (Nbit): 10 bits. # of Time bins per event: ~600 time bins. (Max drift time/clock = 14 sec/25 nsec = 560 bins.) 1000 channels. Trigger latency: 1 sec . On-board zero-suppression. Need of a large buffer size to store 4-5 events on board for one single VME readout.(16*600*5=48K per channel, w/o a zero suppression factor.) High channel density.

SPring-8 FADC Module Use TEXONO FADC and IHEP BES version as the starting point. 40 MHz; 10-bit FADC: input 0-2 V range. Shift register inside FPGA: length = trigger latency (1 s). On-board FPGA for threshold suppression. Buffer FIFO: dual port memory. CPLD: controlling VME actions. Free clock running. VME 9U; 32 channels/module; 8 attached cards/module; 4 channel/card.

Main Electronic Components Receiver: MAXIM, MAX4145ESD. OPA: Analog Device, AD8138ARSO-8. FADC: Analog Device, AD9203ARVRU-28. FPGA: Xilinx, XC2S150-6FG456. FIFO: TI, SN74V245.

SPring-8 FADC Module (4 channels, 10 bits, 40 MHz) FIFO FADC OPA FPGA

Mixed signal AD Converter Adapter Board 40 MHz sampling rate. 10 bits resolution with 2Vp-p dynamic range. Clock distribution with Phase Lock Loop circuit. On Board digital signal delay and Real-Time ZERO-Suppression. High capacity First In First Out Memory. Easy to use with high density connector.

FADC Mother Board Driver CPLD Clock Driver VME Connector

32 Channels, high sampling rate Flash AD converter. VMEBus slave controller, with high performance BLTransfer Mode. FPGA, digital signal control chip. First In First Out memory. Differential AD Converter (40 MHz) 16 channels differential signal input connector. 32 Channels, high sampling rate Flash AD converter. Spring-8 2002/03

AS,D0,D1,AM[0..5],Write,DTACK, et. al. Differential Signal from MAMP x 8 Receiver & Driver 10 Four Channels CH 1 FADC Download PROM Receiver & Driver 10 CH 2 FADC Processing FPGA VA[8..15] VD[0..31] Receiver & Driver 10 CH 3 FADC Download PROM Read Receiver & Driver 10 CH 4 FADC RST Write Flag Flag 4 Hit Flag FIFO VD[0..31] VD1 Clock Trigger x 8 JTAG VD[0..11] 12 Trigger Counter Trigger FIFO VD[0..11] Reset Read Flag Write_in Read_out Delay Write VME Control Read Trigger FIFO VA[8..23] Clear Trigger FIFO VA1 Check Trigger Number AS,D0,D1,AM[0..5],Write,DTACK, et. al. VC VME_Reset 8 Global FPGA 8 bits DIP Switch

32 bits FIFO Shift Register Comparator Threshold 10 32 bits FIFO L=(Trigger Latency + 1) 10 bits Data Shift Register 10 Clock Write Enable 10 Write Read Comparator Flag Q S 10 Threshold R VD[0…15] VD2 Write Flag VA[8…15] VA2 Read Clock Counter & Control Count Trigger Over_Threshold Enable Comp_Control Clock Clock Write_header&trailer Rst Write_Data Reset Write_Flag Disable Clear Fig. 2 Block Diagram of Processing FPGA

Number of ADC data bins (0-600) CS: Checksum bit Data Format Lowest Bit ND: Not defined. 16 15 14 13 12 11 10 09 08 07 06 05 04 03 02 01 Header 1 CS 1 ND FADC Module Number (1-64) Channel Number (1-32) Header 2 CS 1 ND Event Number (1-5) ADC CS 1 ND ADC (0-1024) Time CS 1 ND Time (0-1024) Trailer CS 1 ND Number of ADC data bins (0-600)

CSR Format Lowest Bit VME address: 0x010000 Reset 16 15 14 13 12 11 10 09 08 07 06 05 04 03 02 01 Reset 1 Sampling Count: default value 1020. 1 Last six digits of number of sampling count.

FADC VME Action List (A24/D16) 0x0i0000: address to write, bit 9 for resetting FIFO and set ready, bit 10 for resetting suppression threshold and bit 11 for setting the sample count of the FADC i. (Address modifier: 0x3D). 0x0i0100: address to read the merged 32 FIFOs’ content in BLT mode for FADC i. (Address modifier: 0x3B, 0x3F). 0x0i0101: address to read the BLT reading cycle for FADC i. (Address modifier: 0x3B, 0x3F). 0x0i0000+j*0x000100: address to read the single FIFO content in AO mode for channel j. (Address modifier: 0x3D) 0x0i0000+j*0x000100: address to write for setting the zero-suppression threshold for channel j. (Address modifier: 0x3D)

CPLD FADC Trigger Clock 100MHz The Control Flow of FADC For each channel DAQ Start Trigger , Conversion Master Yes NIM < 5 events Preamplifier Module VME CPU No Trigger Count *Veto Send IRQ to VME CPU Trigger signal DAQ READ FIFO CPLD FADC Trigger Clock 100MHz FADC Module DAQ send Reset Trigger FADC clear BUSY FADC Reset Clear trigger Veto Busy Slave

Observation Window of Signals Shift Register Length ( max 100*25ns = 2.5 s) Trigger Conversion Strobe Sampling Counts ( max 1024*25ns=25s)

DAQ Trigger Logic SPring-8 32-channel FADC TEXONO MAMP LeCroy222 LTDS1 Rst LTD0 Strb SCLK HTD0 Evnt H VT L VT LeCroy222 START OR BLANK STOP NIM DEL TTL BUSY 1.0 10 100 LATCH Full scale width FBSY INT READ CLK Busy Reset +5V +12V -12V -5.2V SPring-8 32-channel FADC Trigger Voltage Reference Clock Generator

TEXONO Online Event Display (400 KHz sine wave)

TEXONO Online Event Display (1 MHz sine wave)

ROOT Offline Event Display for 2 SPring-8 FADC (64 channels) Module 1 Module 2

Events 02/09/2001: Prof. Imai and Ahn visited AS. Collaborating plan was discussed and finalized. 03/31/2001: Wen-Chen and Henry visited IHEP, Beijing and explored the R&D plan in IHEP. 05/31/2001: IHEP was not able to perform the R&D plan. 08/01/2001: Da-Shun visited IHEP for 3 weeks to learn the conceptual design. 02/01/2002: Prototype 1 boards made. 02/28/2002: Wen-Chen and Da-Shun tested prototype-1 boards with TPC at SPring-8. 04/25/2002: Finished up 64 channels of prototype-1 and deliver them to SPring-8.

Plan 04/30/2002: Issue out prototype-2 (quasi-final) fabrication order. 05/21/2002: Deliver prototype-2 to SPring-8. 06/01/2002: System test with a complete electronic chain (Pre-amp, shaper, and FADC) with TPC and Solenoid magnet. 06/15/2002: Issue out final production fabrication order (1440 channels). 07/01/2002: Send production boards for stuffing. 07/15/2002 – 07/31/2002: Test production boards. 08/01/2002 – 08/31/2002: Delivery of production board, installation, system test and DAQ. 09/15/2002: Commission Run with photon beam.

Remarks Many valuable experiences learned: board design, firmware, modification of TEXONO DAQ, coordinating people, etc. A good starting point for a continuing “rooting” process of experimental technique at IPAS. Thanks to many people: Henry, P.K., A.C., K.C., Tracy, IHEP group….