AGATA MANAGEMENT BOARD AND TEAMS

Slides:



Advertisements
Similar presentations
The AGATA Project First 4pi -ray spectrometer built completely from Germanium detectors. Based on the novel technique of gamma-ray tracking. Measures radiation.
Advertisements

Prometeo Workshop on Front-end electronics for gamma and complementary detector systems 17 th -18 th November 2011 – IFIC (Valencia) Diego Barrientos.
● EDAQ meetings ● NUSTAR DAQ architecture ● AGATA ancillary detector interface ● Data rates, etc. HISPEC/DESPEC Electronics & Data Acquisition Department.
Călin A. Ur* for the AGATA Collaboration INFN – Sezione di Padova
Nuclear Structure with Gamma-ray Tracking Arrays
Advanced GAmma Tracking Array
Development of novel Silicon detectors for next generation nuclear physics experiments (SIDET) O. Kiselev University of Mainz JRA21/JRA22.
E.Clément Novembre 2011 E.Clément GANIL AGATA Days February 2013 AGATA Campaign at GANIL  Setup to be integrated  Project Organization and.
AGATA detector characterization: scanning setup at Orsay Concept of the Orsay scanning system (last Agata week – K. Hauschild) Status and plans A. Lopez-Martens.
Coupling an array of Neutron detectors with AGATA The phases of AGATA The AGATA GTS and data acquisition.
EGAN FEE synergy Working Group PROMETEO Workshop on Front-End Electronics for gamma and complementary detector systems November 2011I IFIC – Valencia.
The AGATA project concept of  - ray tracking design and development Witek Męczyński The Henryk Niewodniczański Institute of Nuclear Physics Polish Academy.
AGATA: Advanced Gamma Tracking Array
Synergy Program for Front-End, Electronics, Data Acquisition & Control JRA 30 Emanuel Pollacco CEA Saclay SGFDC for Nuclear Physics KVI, STFC Daresbury,
Brief Report on the Status of the AGATA Project (June 2012) A. Gadea (IFIC, Valencia) the AGATA PM on behalf of the AMB AGATA Collaboration Council Orsay.
AGATA: Advanced Gamma Tracking Array
System issues System decomposition / Product tree System specification: function, performance, interfaces, budget Work-breakdown structure.
Ancillary Detectors Working Group Agata Week/GSI, 23 Feb Integration of ancillaries with DAQ Goal Context Specifications, modes Design Schedule &
Status of the AGATA Project June 2013 on behalf of the AMB AGATA Collaboration Council meeting June 2013.
Status and plans for online installation LHCb Installation Review April, 12 th 2005 Niko Neufeld for the LHCb Online team.
Coupling Neutron Detector array (NEDA) with AGATA The AGATA Front-End processing Electronics & DAQ The AGATA Trigger and Synchronization (GTS) Coupling.
G. Maron, Agata Week, Orsay, January Agata DAQ Layout Gaetano Maron INFN – Laboratori Nazionali di Legnaro.
Wolfram KORTEN, JRA-02 AGATA Irfu AGATA week, Orsay (France), January 15-18, 2007 AGATA within EURONS Objectives: Development, construction, commissioning.
Wolfram KORTEN, JRA-02 AGATAEURONS PCC-Meeting, Mainz (Germany), April 2006 Status of the AGATA project Recent developments Milestones and deliverables.
Agata Week – LNL 14 November 2007 Global Readout System for the AGATA experiment M. Bellato a a INFN Sez. di Padova, Padova, Italy.
S. Brambilla, “Recent DAQ integration test at L.N.L May 2008” 7 th AGATA Week, Uppsala, 8-11 July th AGATA Week Uppsala, 8-11 July 2008 Recent.
Summary talk of Session 6 - Electronics and Interfacing to AD DAQ - Mechanics for the Demonstrator for the AD ancillary detector integration team: for.
17-Aug-00 L.RistoriCDF Trigger Workshop1 SVT: current hardware status CRNowFinal Hit Finders64242 Mergers31616 Sequencers2312 AMboards4624 Hit Buffers21212.
AGATA The Advanced Gamma Ray Tracking Array Ancillary Detector and Integration W.G. Status of the Working Group and Tasks A.Gadea.
AGATA: Status of the Implementation and Performance A. Gadea (IFIC, CSIC-Univ. Valencia) for the AGATA collaboration.
AGATA Week Introduction John Simpson Nuclear Physics Group GSI, February 2005.
Synergy Group for Front-End Electronics and DAQ (SGFD)
Compton Trigger Design Update Tanja Horn Compton Working Group 6 June 2008.
DATA PROCESSING Working Group Digitisation P. Medina Pre-processing hardware I. Lazarus Pre-processing algorithms W. Gast Global Trigger and SynchronisationM.
I3 EURONS Wolfram KORTEN, JRA-02 AGATA AGATA week, GSI, 21. February 2005 Contract for the EURONS project has been signed (~14 M€) Project started on
 Digitisation P.Medina  Pre-processing I.Lazarus GTSM.Bellato GTSM.Bellato  PSA P.Desesquelle R.Gernhäuser 7 th AGATA Week, Uppsala, July 8-11, 2008.
Peter Sharp CERN CMS Tracker Summary of the Tracking Trigger Working Group Peter Sharp 21 November 2008.
Data Analysis Working Group AGATA Tasks of the WG Schedule Johan Nyberg, ADAWG meeting, June 12-13, 2003, NBI.
NEDA collaboration meeting Neutron and light charged particle detector-arrays as complementary detectors for the future European large gamma-arrays AGATA,
What has been done Campaigns of insertion: 2 in Legnaro, 1 in GSI but few are not yet in the DataBase =>300 objects referenced and assembled but few are.
ECFA Workshop, Warsaw, June G. Eckerlin Data Acquisition for the ILD G. Eckerlin ILD Meeting ILC ECFA Workshop, Warsaw, June 11 th 2008 DAQ Concept.
“Edelweiss” tentative contributions G. Chardin DAPNIA, CEA/Saclay.
SU participation in nn bar Sam Silverstein. Who are we? Particle physics group  ATLAS  IceCube Instrumentation physics division  ATLAS L1Calo trigger.
E.Clément Novembre 2011 AGATA : Organisation of the campaign and technical aspect GANIL SC- September 2013.
Advanced Gamma Tracking Array Andy Boston The Advanced Gamma Tracking Array
Institution board (Chairman) Conference committee (Chairman) Editorial board (Chairman) Resource manager Upgrade SC (Chairman) DPG coordination Project.
Silvia Lenzi – GTH-2012 Workshop, Padova, October 29-31, 2012 EGAN Silvia M. Lenzi University of Padova and INFN
AGATA; status, plans and opportunities
Digital Acquisition: State of the Art and future prospects
1st PSeGe Workshop, IPNO & CSNSM Orsay 3rd -4th October 2016
PANDA Muon Group Meeting, Protvino 7 June 2011 G
WBS 1.03 Readout Systems Scope, Cost and Schedule
PANDA collaboration meeting FEE session
Detector characterization overview of the AGATA scanning tables
STT Detector risk’s assessment
Detectors and Preamplifiers
Status of the AGATA installation at GANIL
Draft SuperB Organization Chart for TDR Phase
Electronics, Trigger and DAQ for SuperB
HERD Prototype Beam Test
What the Advanced Gamma Tracking Array can do for us Nuclear science in the 21st century AGATA PSD8 Glasgow Andy Boston
Status of the AGATA installation at GANIL
Synergy Program for Front-End, Electronics, Data Acquisition & Control
Electrical and electronic systems projects
Toward a costing model What next? Technology decision n Schedule
SIGMA: a detector for γ-ray spectroscopy & imaging Dr Laura AGATA/GRETINA Collaboration Meeting
GRETINA Gamma-ray Tracker Status and EPICS Usage
AGATA Today at GANIL 12 Triple Cluster and 1 Double Cluster (38 detectors) on site ATC1 core B oscillating after capsule change ATC9 core B : high Voltage.
State of developments on Readout interface of European DHCAL
Simulations of the AGATA Response to Relativistic Heavy Ions Beams
Presentation transcript:

AGATA MANAGEMENT BOARD AND TEAMS A. Gadea (Project Manager) Boston, B. Million, A. Korichi, P. Reiter F. Recchia, G. Duchêne, (ASC) and J.Nyberg (ACC). J. Gerl (LCM-GSI), E. Clement (LCM-GANIL) AGATA Working Groups AGATA Teams Detector Module Detector & Cryostat H.Hess Detector Characterisation H.Hess Detector CAT &Testing H. Boston R & D on gamma Detectors & Applications AMB Chairman Project Manager A.Gadea Front-end Electronics A. Gadea Pre-Amplifier Digitizer A. Pullia Global Trigger & Synchronization M. Bellato Pre-processing I. Lazarus Slow Control & FEE Monitoring E. Legay Data Flow A.Korichi Software: Flow, Services & GRID X. Grave Hardware: Local Infr. & Network N. Ménard Comp. Det. Elec. and DAQ Integration Data Analysis A.Boston Data Analysis & TRACKING O. Stezowski A. Lopez-Martens PSA Algorithm Development L. J. Harkness GRID Data managing and Analysis Resource Manager Infrastructure. Comp. Det. B.Million Detector array Infrastructure R.Menegazzo Complementary Detectors J.J. Valiente Mechanical Infrastructure A.Grant Thanks Pete! Performance and Simulation F.Recchia AGATA Performance C.Michelagnoli AGATA Commissioning AGATA Physics & exp. Simulation M. Labiche Technical Coordinator Engineering Advi. Compatibility EMC, Interfacing Specification control Quality Control Documentation Local Campaign Managers (LCM) INFN-LNL Legnaro GSI Darmstadt J.Gerl GANIL-SPIRAL2 Caen E.Clement