POSIPOL 2016 at LAL/Paris, Sept Peter Sievers-CERN

Slides:



Advertisements
Similar presentations
Matt Rooney RAL The T2K Beam Window Matt Rooney Rutherford Appleton Laboratory BENE November 2006.
Advertisements

Proposal for a programme of Neutrino Factory research and development WP-3 The Target The Neutrino Factory Target Lead Author - J R J Bennett CCLRC, RAL.
The Current T2K Beam Window Design and Upgrade Potential Oxford-Princeton Targetry Workshop Princeton, Nov 2008 Matt Rooney.
Overview of 300 Hz Conventional e + Source for ILC Truly Conventional Collaboration ANL, IHEP, Hiroshima U, U of Tokyo, KEK, DESY, U of Hamburg NIM A672.
Solid Targets for the Neutrino Factory J R J Bennett Rutherford Appleton Laboratory, Chilton, Didcot, Oxon, OX11 0QX, UK
Solid Target Options NuFACT’00 S. Childress Solid Target Options The choice of a primary beam target for the neutrino factory, with beam power of
A variety of load cases, ranging from nominal to degraded or abnormal operating conditions, were studied both numerically and analytically. The reviewers.
Radiation Cooling of the ILC positron target LCWS 2014, Belgrade, Serbia 7 th October 2014 Sabine Riemann, DESY, Peter Sievers, CERN/ESS, Andriy Ushakov,
Undulator Based ILC Positron Source Studies Wei Gai Argonne National Laboratory CCAST ILC Accelerator Workshop Beijing, Nov 5 – 7, 2007.
Initiatives in the Target Sector J. R. J. Bennett CCLRC, Rutherford Appleton Laboratory, Chilton, Didcot, Oxon. OX11 0QX, UK.
Completion of Water-Cooled Backup Study Eric Pitcher TAC-10 November 5, 2014.
1 Present members : KEK: J.Urakawa, T.Omori, T.Suwada, T.Kamitani, --- BINP, Novosibirsk :Pavel Logachev (BINP), V.M.Strakhovenko, --- Hiroshima: T.Takahashi,
2015/10/261 Present members : KEK: J.Urakawa, T.Omori, T.Suwada, T.Kamitani, BINP, Novosibirsk :Pavel Logachev (BINP), V.M.Strakhovenko, --- Hiroshima:
Status: Cooling of the ILC e+ target by thermal radiation POSIPOL 2015, Cockroft Institute, Daresbury, UK 2 nd September 2015 Felix Dietrich (DESY), Sabine.
Key luminosity issues of the positron source Wei Gai.
Positron Source General Update M. Kuriki(Hiroshima U./KEK) ALCW2015, April 2015,Tsukuba/Tokyo, Japan.
Status of target and photon collimator work for polarized e+ LCWS 2014, Belgrade, Serbia 7 th October 2014 Sabine Riemann, Friedrich Staufenbiel, DESY.
Current standing of the undulator based ILC positron source Wei Gai AWLC 14 FNAL, May
20 April 2009 AAP Review Global Design Effort 1 The Positron Source Jim Clarke STFC Daresbury Laboratory.
Radiation Cooling of the ILC positron target ALCW 2015, KEK, Tsukuba, Japan 24 th April 2015 Felix Dietrich (DESY), Sabine Riemann (DESY), Peter Sievers.
Heat load of the radiation cooled Ti target of the undulator based e+ source Felix Dietrich (DESY, TH-Wildau),Sabine Riemann(DESY), Andriy Ushakov(U- Hamburg),
LITHIUM LENS FOR EFFECTIVE CAPTURE OF POSITRONS Alexander Mikhailichenko Cornell University, LEPP, Ithaca, NY Positron Source Meeting, Jan30-Feb2.
1 Alexander Mikhailichenko Cornell LEPP, Ithaca, NY Linear Collider Workshop of Americas ALCPG, September 30, 2009 Albuquerque NM LITHIUM LENS STUDIES.
A Report from PosiPol2015 to AD&I meeting (10 Sep. 2015) Masao KURIKI (Hiroshima University)
Solid Targets for Neutron Spallation Sources Eric Pitcher Los Alamos National Laboratory Presented to: AHIPA Workshop October 20, 2009.
10/9/2007 Global Design Effort 1 Optical Matching Device Jeff Gronberg / LLNL October 9, 2007 Positron source KOM - Daresbury This work performed under.
Parameters of the NF Target Proton Beam pulsed10-50 Hz pulse length1-2  s energy 2-30 GeV average power ~4 MW Target (not a stopping target) mean power.
Mitglied der Helmholtz-Gemeinschaft Jörg Wolters, Michael Butzek Focused Cross Flow LBE Target for ESS 4th HPTW, Malmö, 3 May 2011.
Status: Cooling of the ILC e+ target by thermal radiation LCWS 2015, Whistler, Canada 3 rd November 2015 Felix Dietrich (DESY), Sabine Riemann (DESY),
Cavity support scheme options Thomas Jones 25/06/15 1.
F.Staufenbiel / EuCARD 2 / Heat load and stress studies of the ILC collimator G. Moortgat-Pick 1;2 S. Riemann 2, F. Staufenbiel 2, A. Ushakov.
ILC Undulator Based Position Source Target System Wei Gai, HEP, ANL TB meeting 8/5/2014.
P.Sievers/POSIPOL2011/Beijing 1 A GRANULAR CONVERSION TARGET FOR THE HYBRID POSITRON SOURCE FOR ILC P.Sievers (CERN), X.Artru, R.Chehab, M.Chevallier (IPNL),
Design for a 2 MW graphite target for a neutrino beam Jim Hylen Accelerator Physics and Technology Workshop for Project X November 12-13, 2007.
Positron Source for Linear Collider Wanming Liu 04/11/2013.
Design Principals for ILC- Positron Targets Peter Sievers-CERN-ESS POSIPOL 2013,Argonne P.Sievers/POSIPOL131.
Progress with Zeuthen Meeting Actions Jim Clarke ASTeC, STFC Daresbury Laboratory.
1 Positron Source Configuration Masao KURIKI ILC AG meeting at KEK, 2006 Jan. Positron Source Configuration KURIKI Masao and John Sheppard  BCD Description.
Primary Vacuum Window and Water Dump for the ILC-Photon Beam
A Positron Target Concept for the ILC
Status: Cooling of the ILC e+ target
A GRANULAR CONVERTER FOR A POSITRON SOURCE USING CHANNELING
Comparison of Undulator and e-Driven Schemes
Pair-Production Target
Material alternatives to limit activation of ZS
P. Sievers/CERN. A. Ushakov/Univ. Hamburg. S. Riemann/DESY-Zeuthen.
Rotation Target R and D of ILC E-driven source
Skeleton contributions to targets section
Masao KURIKI (Hiroshima University)
Performance of an Automated Water Based Cooling System for CBM MuCh
The ILC positron source target using cooling by thermal radiation
NC Accelerator Structures
Peter Loveridge High Power Targets Group
Building Energy Analysis
Beam Window Studies for Superbeams
Alexander Mikhailichenko July 22, 2008
Undulator based e+ source: “Staging” Mini-Workshop
Cooling by thermal radiation
LCWS Strasbourg October 2017
Target and Horn status report
Outline: Why now ? What ? How ?
REVIEW OF POSITRON SOURCE R&D FOR LINEAR COLLIDERS
CLIC Undulator Option for Polarised Positrons
Thermal analysis Friction brakes are required to transform large amounts of kinetic energy into heat over very short time periods and in the process they.
ILC RDR baseline schematic (2007 IHEP meeting)
Parameters of the NF Target
EUROnu Beam Window Studies Stress and Cooling Analysis
Summary for the Sources working group
Lithium lens and window tests
Positron Working Group Status
Presentation transcript:

POSIPOL 2016 at LAL/Paris, 14-16 Sept. 2016 Peter Sievers-CERN Design Options for e- and Undulator driven Positron Targets for the ILC POSIPOL 2016 at LAL/Paris, 14-16 Sept. 2016 Peter Sievers-CERN 1

1. e-driven Target Wheel 2

Design Parameters 300 Hz scheme: 20 bunches, each 1 µs and spaced by 3.3 ms. Rep. rate 5 Hz. Average heat input of 35 kW into a W-target ring of 20 mm height, 15 mm thickness and a diameter of 500 mm. Water cooling is arranged with in- and outlets through the rotating axis. A vacuum tight, radiation resistant, rotating seal is required. Being investigated by KEK. 3

Five sectors around the wheel will be hit in sequence by the pulses. For optimal uniform occupation of the wheel by the 63 µs pulses of 95 %, a velocity of 4.71 m/s, 180 rpm., is required. Five sectors around the wheel will be hit in sequence by the pulses. Each spot on the target will be hit once per second. 4

The W-target is submitted to thermal shocks, under study by Song Jin-IHEP. Cyclic thermal heating and thermal quasi static stresses by the pulsed beam and transients, like beam trips, are under study. The thermal contact between the target and the cooling water is of prime importance. 5

Bolted Thermal Contact. Spring loaded bolts provide a robust and about constant thermal contact between the W-sectors and the water cooled Cu-wheel. This W-Cu-thermal contact is resistant to differential thermal and transient expansions. The temperature jump across the W-Cu interface can, however, be of the order of 100 oC. To provide the space for the bolts, the heat path to the water channel is relatively long. Average temperatures in the W-target can approach 400 oC. Detailed thermal analysis has still to be done. 6

1.2 Options Replace bolted contact by brazing, friction or diffusion bonding,…..Technology, available in industry. Could it be adapted to the specific conditions of the target? Requires however R+D, to qualify the resistance of alternative joining techniques. Direct bonding would lead to lower average temperatures. Check with RIGAKU. Increasing the diameter of the wheel to 800 mm, would lower the average temperature by 0.63. Keep this option open! 7

2. He-Cooled Granular Target. 8

Basic lay out of the wheel as before Thermal shock in 2 mm W-spheres with 1 µs pulses is much lower than in bulk material, see Song Jin-IHEP. Dynamic response of spheres is tolerable. He-leak tight Ti-windows are required: temperature jumps of 70 oC/pulse at 35 J/g. Cooling of the spheres and the 0.2 mm thick windows by the flowing He is sufficient. Life time of W-spheres is expected to be longer than W-bulk material. 9

3. Liquid Metal Target Inspired by the recent article of A. Mikhailichenkov, Usage of liquid metals in the positron production …..,CLASSE, Ithaca, NY, 14853., Nov. 2015. Spinning wheels, driven by metal jets and free flowing target jets, Hg, Pb-Bi, In-Ga,… are considered. Here a liquid Hg-pendulum is considered. 10

Liquid Metal Pendulum Target 11

Liquid Metal, Hg-Pendulum The fluid, Hg, is driven through a container at a velocity of several meters, 5-10 m/s. This avoids pile up of shock and temperatures in the liquid due to each 1 µs pulse, spaced by 3.3.ms. Thin Ti-windows can efficiently be cooled by the flowing liquid metal. The cooling time constant is of the order of several ms, i.e. cooling occurs during the time between pulses. The container can “nearly” be stationary. 12

However, radiation damage in the container windows will occur. Therefore, by a slow movement of the pendulum, say 10 cm at 0.5 m/s, the radiation damage can be diluted over a larger surface. The container window has to be qualified. But, no rotating seal is required! 13

However: each 1 µs pulse will create a shock wave in the liquid as well as in the window. Plenty of liquid metal volume around the actual target volume should be provided to dissipate, dilute the shock energy and to protect thus the container wall. Severe damage, pitting, in the Hg-container of the JPARK spallation source were experienced. This was successfully mitigated by injecting He-gas bubbles into the Hg. This technique could also be adopted to protect the Ti-windows against shocks in the pendulum target. 14

4.1 Undulator driven Target Wheel Basic Parameters are still valid: A segmented Ti-ring of 1 m diameter, 2 cm height and 14 mm thickness is mounted onto a Cu-wheel and spinning at a velocity of about 100 m/s. Cooling of several kW, 4 kW, average power dissipated by heat radiation from Cu-radiators into stationary, water cooled coolers. Magnetic bearings and drives are placed inside the vacuum. The weight of the wheel has to be optimised with respect to the surface available for heat radiation. No vacuum tight rotating seal is required. 15

16

Elevated temperatures are caused, among other things, by the very low thermal conductivity of the Ti-alloy. The thermal Ti-Cu contact is again an issue. As a pragmatic approach, spring loaded bolts are considered. These offer a good safety margin against high temperatures, thermal transients, bake out temperatures or accidents. 17

4.2 What could be improved? Shorten the heat path from the Ti-target towards the Cu-radiator. Replace the bolted contact by direct Ti-Cu bonding. This has, however, to be severely qualified under all circumstances. Find a target material with higher thermal conductivity, like Vanadium?? Reduce the PEDD and the average power by about one half, by using a shorter target of 0.2 Xo. See the study of Andriy. The loss of positron yield is marginal at 150 GeV. This could be acceptable at least for the wheel of the first generation. Later consolidation programs for further operational options will be readily accepted by the user community! 18

5. Conclusion 5.1 e-driven target wheel The proposed principal design, including bolted W-Cu contact, can be realised without major R+D. Qualification of the rotating seal is well under way. No show stopper appeared (yet). Temperatures with 35 kW average power input are high. They could be reduced by a bonded W-Cu junction, still to be qualified for the prevailing conditions and by increasing the diameter of the wheel. Life time of the W-slabs under thermal cyclic load and shock must be studied further. 19

When the life time of the W-target is the limiting factor, a granular, He-cooled target wheel could be an option. When the rotating vacuum seal becomes the limiting factor, a liquid metal pendulum target should be studied. 20

5.2 Undulator driven, radiation cooled wheel. Mechanical design, including bolted Ti-Cu contact, can be made without major R+D. Vacuum compatible drive and bearings have to be validated, also in view of rotation stability and weight of the wheel. To reduce the target temperatures, direct Ti-Cu bondings would have to be devised and qualified. 21

Thank you for your attention. To evaluate the life time of the Ti target, studies of its resistance to thermal cycles and shocks are under way (DESY). Proceed with a first generation design (Xo=0.2?) and postpone further upgradings to a consolidation program at a later stage. Thank you for your attention. 22