NATIONAL HYDROLOGY PROJECT.

Slides:



Advertisements
Similar presentations
Brief Updates on the e-NGAS Implementation in the CO.
Advertisements

Used to Procure Goods & Supplies. Office supplies Operating supplies Computer hardware and software (non- capitalized
OFFICE OF RESEARCH Department of Research Enhancement and Compliance Services Linda M. Gardiner, Ph.D. Director Seed Grant Procurement Workshop June 17,
Govt. Engineering College Kozhikode TEQIP –II VII th Review meeting th April 2015.
Madurai Date: 10 & 11th March 2014 STATE LEVEL NODAL AGENCY TAMIL NADU.
ANNUAL WORK PLAN & BUDGET JHARKHAND MID DAY MEAL SCHEME.
Jawaharlal Nehru National Urban Renewal Mission JNNURM PROGRESS REVIEW JUNE 2007 Reforms-Projects-Funds Mobilisation & Grant Utilisation State:- Goa City:-
WEL COME TO 1. MAHANADI---  TEL-  ONG  S.TEL-> 6 BLOCKs:- 1.Dunguripali 2.Binka 3.Sonepur 4.Tarva 5.Ullunda 6.Biramaharajpur Nos. of GP-96.
I NTEGRATED D ISEASE S URVEILLANCE P ROJECT (IDSP) An overview of Manual on Financial Management.
A WORKSHOP ON FINANCIAL MANAGEMENT IN HYDROLOGY PROJECT – PHASE-II Gujarat Water Resources Development Corporation Ltd. GWRDCGANDHINAGAR (GW Component.
Objective: Conservation of water, minimizing wastage and ensuring its more equitable distribution both across and within States through integrated water.
Financial Management Practices in Hydrology Project - I An Overview Central Ground Water Board.
Mid Day Meal Scheme PAB-MDM Meeting – Manipur Ministry of HRD Government of India.
ONLINE Filing of EM (I and II) Shri Madhav Lal, IAS Secretary Ministry of MSME.
National Hydrology Project Central Ground Water Board WB Mission: 1-15 September
Mid Day Meal Scheme PAB-MDM Meeting-National Informatics Centre (NIC) 2 nd May, 2014 Ministry of HRD, Govt. of India.
Mid Day Meal Scheme AWP&B Arunachal Pradesh.
HYDROLOGY PROJECT I HYDROLOGY PROJECT II HYDROLOGY PROJECT Project Period 1996 to 2004 Total Outlay 12.5 Crores Project Period 2006 June to May 2014 Total.
Queries raised by Director (Tariff) on ARR and Tariff Application of SLDC for FY on
Mid Day Meal Scheme MDM-PAB Meeting –HARYANA On
ICDS System Strengthening & Nutrition Improvement Project (ISSNIP) Presentation by: State Project Management Unit Department Women & Child Development/Social.
Guideline for Civil Infrastructure for AWP & B
National Hydrology Project Orientation Workshop 9 th May, 2016, New Delhi.
Morelli Park Reconstruction and Expansion Project Public Hearing and Award of Construction Contract Stockton City Council and Stockton Redevelopment Agency.
Progress/Status of National Hydrology Project
National Hydrology Project World Bank Mission at Bengaluru (17th and 18th of August 2017) Kerala SW.
GOVERNMENT OF TELANGANA Irrigation & CAD Department
National Hydrology Project
GOVERNMENT OF ANDHRA PRADESH GROUND WATER AND WATER AUDIT DEPARTMENT
National Hydrology Project (NHP) NATIONAL INSTITUTE OF HYDROLOGY
National Hydrology Project
SPMU Details Sl. No. Post under NHP Name Designation 1.
National Hydrology Project
WEL COME 1st World Bank Mission under the National Hydrology Project
First World Bank Mission. FIRST WORLD BANK MISSION
Proposals for State: ……..
Geo-spatial Products, Services and Applications
NHP National Hydrology Project Surface Water CHHATTISGARH.
NATIONAL HYDROLOGY PROJECT
National Hydrology Project
NATIONAL HYDROLOGY PROJECT
Ministry of Water Resources, River Development and Ganga Rejuvenation
Implementation Arrangement under National Hydrology Project
National Hydrology Project
Gujarat National Hydrology Project Surface Water & Ground Water
FACILITIES. FACILITIES FACILITIES YEAR 1 PRIORITY 1 San Benito CISD will utilize the efficiency audit, prioritize reported items and enlist the Maintenance.
Central Ground Water Board
National Hydrology Project
GROUNDWATER DEPARTMENT - KERALA
National Hydrology Project
BHAKRA BEAS MANAGEMENT BOARD
Details of SPMU (in position), Staff Strength etc
1st World Bank Mission under the National Hydrology Project
Status of Odisha Surface Water under NATIONAL HYDROLOGY PROJECT
Atal Mission for Rejuvenation and Urban Transformation (AMRUT)
Presentation on project progress
City:- Corporation of City of Panaji
PRIP 101 Revolving Fund and the Plant Replacement and Improvement Program (PRIP) ER Nov-18.
Brief Note on Computer Education under ICT Project Punjab Information & Communication Technology Education Society (PICTES)
MDM-PAB Meeting- Nagaland
PAB-MDM Meeting-National Informatics Centre (NIC)
SUSTAINABLE ENERGY INDUSTRY DEVELOPMENT PROJECT (SEIDP)
NATIONAL HYDROLOGY PROJECT
Mid Day Meal Scheme PAB-MDM Meeting – HARYANA on
Tarrant County District PSAP Managers Meeting Thursday, September 12, :00 AM – 11:30AM Tarrant County District Office Training Room 2600.
सबकी योजना सबका विकास PEOPLE’S PLAN CAMPAIGN FOR GPDP
PAB Meeting on National Portal for Mid Day Meal Scheme
Housing & Urban Development Department Government of Odisha
ICDS Systems Strengthening and Nutrition Improvement Project
TEQIP: CRS Financial/Accounting Guidelines
Presentation transcript:

NATIONAL HYDROLOGY PROJECT. 1ST WORLD BANK MISSION ODISHA- GROUND WATER 22-23 August 2017 BHUBANESWAR

DETAILS OF SPMU (IN POSITION),STAFF STRENGTH ETC. SPMU Odisha has been formed vide notification no. 13675/WR dt. 10/06/2016 of DoWR, GoVT of Odisha. SPMU structure :- 1.Project Coordinator; EIC(P & D),WR 2.Project Director(NHP): Director, Costal Protection & River Training, BBSR. 3.Nodal Officer(SW): Director Hydrometry, BBSR. 4. Nodal Officer(GW): Supdt. Engineer,GWD,BBSR. PMU-OdishaGW has been constituted by the Project Coordinator(NHP Odisha) Vide order no. 28335 dt. 06/08/2016. PMU[Odisha GW) Structure: 1.B.R. Padhee,SE, -Nodal Officer,Odisha-GW. 2.Er. Anup K. Das,EE -Hydrologist. 3.Er. S.K. Pattnaik AEE(C) -Hydromet Instrumentation Expert. 4.Sri B.K. Sahoo,Geologist -Hydrogeologist. 5.Er. Suparna Nayak,AEE(M) -Procurement specialist. 6.Sri B.P.Padhee,Geologist -GIS Expert. All are in position at present and working in addition to their routine responsibility. Moreover,this Directorate has suggested to appoint the following categories of manpower to work in PMU cell(Odisha-GW). a) Asst. Accountant-1 no.; b) Comp. Operator cum-Office Assistant-2 nos. c) Security Guard-1 no.; d) Office Attendant for PMU cell-1 no. Besides,the field Divisions have requested to engage security personel and office assistants for their Divisions which will be submitted to the higher authority for approval.

FUNDS RECEIVED(2016-17),(2017-18) & EXPENDITURE TILL DATE YEAR WISE FY 2016-17: INR 17.74 Lakhs. FY 2017-18: INR 0.0 Expenditure incurred so far “NIL”.

MAJOR PROCUREMENT ITEM IN PIP (ITEM CODE,ITEM AND AMOUNT):- Sl No. Item Code Item Name Amt.(INR lakhs) 1 A1.2.01 DWLR with Telemetry 1000 2 A1.2.02 Medium Piezometers 600 3 A1.2.03 Deep Piezometers 130 4 A1.4.01 DWLR+WQProbe with Telemetry 250 5 A1.6.01 to A1.6.05 Water Quality Lab Equipment (5 Pkgs) 152.3 6 A1.8.06 Benchmark & RL Survey 75.0 7 A3.1.02 CIvil works for Construction of State data Centre (New) 270.0 8 A3.2.01 Renovation /Repair of existing Divisional data Centre 110.0 9 A3.3.01 Procurement of Office Furniture & Non ITC equipment for state data Centre 100.0 10 A3.4.01 to A3.4.15 IT Hardware & SoftWare(Desktop,printer,power supply and online UPS,scanner,OS etc.) 135.20 11 A3.5.01 to A3.5.04 Arc GIS,2D Modelling software,MS Office,Anti virus etc.) 62.25 12 C2.1.04 PDS1: Study on GW Pollution in Twin City of Cuttack- Bhubaneswar - COnsultancy 30.0 13 C2.2.04 PDS2: Determining measures suitable & effective for artificial Recharge to GW in hard rock tarrin of Kalahandi, Nuapada, sundergarh & malkanagiri districts Odisha - Consultancy 250.0 14 C2.2.05 PDS3: Identification of Freshwater zone in Coastal areas of Odisha - Consultancy 200.0 15 C2.2.06 PDS4: Impact assessment Study of Rooftop Rainwater harvesting & GW recharge in 5 Cities/ Towns of Odisha - Consultancy 125.0 16 D3.1.02 Inspection Vehicle (New) 40.0 17 D3.2.03 Hiring of Vehicles (8 yrs Operation) 150.0

MAJOR PROCUREMENT ITEM IN AWP 2016-17 & THEIR STATUS(ITEM CODE,ITEM AND AMOUNT):- Sl No. Item Code Item Name Amt.(INR lakhs) 1 A3.4.01 Desktop Computers with OS 3.5 2 A3.4.03 Laptop with OS 3 A3.4.14 Power Supply & On-Line UPS for data centre 2.00 4 A3.5.02 Microsoft Office ( Multi User Lic) 1.00 5 A3.5.03 Antivirus 0.50

MAJOR PROCUREMENT ITEM IN AWP 2017-18 & THEIR STATUS(ITEM CODE,ITEM AND AMOUNT):- Sl No. Item Code Item Name Amt.(INR lakhs) 1 A1.2.01 Medium Piezometers 120.00 2 A1.2.03 Deep Piezometers 26.0 3 A3.1.01 Consultancy for design, architecture etc for State Data Centre (New) 10.0 4 A3.2.01 Renovation /Repair of existing Divisional data Centre 11.0 5 A3.4.01 A3.4.03 A3.4.10 A3.4.11 IT Hardware & SoftWare(Desktop,printer,power supply and online UPS,scanner,OS etc.) 19.5 6 A3.5.02 A3.5.03 MS Office,Anti virus 4.25 7 D3.1.01 Cost of infrastructure & furnishing of SPMU 5.0

PHYSICAL PROGRESS-COMPLETED, PROCESS UNDERWAY,PROPOSED:- COMPLETED: - Identification of 143 sites for installation of new Piezometers. PROCESS UNDERWAY:-Bid document for installation of 143 Piezometers under process. PROPOSED:-Procurement of IT hardware & software through bidding process.(since GEMS/DGS&D can not be followed at present in the state)

STATUS OF BID DOCUMENT-FLOATED,READY TO BE FLOATED,UNDER PREPARATION:- FLOATED:- NIL READY TO BE FLOATED- NIL UNDER PREPARATION:- Bid document for installation of Piezometers is under preparation.

STATUS OF VARIOUS STUDIES/PDS ETC.:- Various studies/PDS have been Programmed during FY 2018-19.

STATUS OF DATA ENTRY IN E-SWIS:- Data entry in E-SWIS ; not related to Odisha-GW.

STATUS OF HYDROMET STATION (BOTH GW & SW), RECOINCILIATION WITH STATE, CGWB, CWC, IMD ETC. Total existing piezometers: 649. Total proposed Piezometers in PIP: 700. Piezometers Proposed during FY 2017-18 : 143. Reconciled with CGWB, Integrated by SER,CGWB. Identifying suitable locations for installation of telemetry systems in existing Piezometers under progress.

STATUS OF STATE WRIS Not yet started. Requires advice & support from TAMC.

STATUS PUBLIC FINANCE MANAGEMENT SYSTEM(PFMS):- Registered with PFMS. Expenditure not incurred till yet. PFMS guidelines will be followed.

ANY OTHER ISSUES:- TAMC support is required for preparation & finalizing bid documents (for DWLR,WQ equipments engagement of consultants & other procurements.

WAY FORWARD:- DoWR has communicated the approval of AWP 2017-18 amounting to Rs. 299.87 lakhs vide letter No. 18816/WR Bhubaneswar, dtd 03/08/2017 after which the funds will be utilized way forward.