Status CO2 Cooling IBBelle: Reconnection after Belle II Roll in

Slides:



Advertisements
Similar presentations
ACTIVE LEARNING PROCESS
Advertisements

Daikin Altherma™ Troubling Shooting
1 Ann Van Lysebetten CO 2 cooling experience in the LHCb Vertex Locator Vertex 2007 Lake Placid 24/09/2007.
Basic Refrigeration Cycle
Wine Cellar Split System Basics. Definitions Split System – A cooling unit that “splits” the cooling coil and the condenser apart into two remote pieces.
Oxygen Concentrators.
Clean Air Box Usage & Care CABs RAMs CO Monitors.
Installation and Initial Start Up by Martin Noska, Service Engineer, Aftersales & Service.
Installation and Initial Start Up Worldwide Manufacturer of PSA Generators by Laco Remias, Service Engineer, Aftersales & Service.
Daya Bay Muon Subsystem Review, 7/28-29/2007, IHEP, Beijing Daya Bay RPC Gas System: Design Report & Budget Estimate Changguo Lu, Kirk McDonald Princeton.
Lukasz ZwalinskiATLAS IBL CO 2 cooling 1 CO 2 cooling system for Insertable B Layer detector into the ATLAS experiment L. Zwalinski, C. Bortolin,
Fcal upgrade for sLHC: Cryogenics modifications – TE-CRG/ C.Fabre 1 ATLAS FCal Upgrade for sLHC: Modifications to the Calorimeter Cryogenic.
Evaporative Heater Design, qualification and planning M.Olcese PRR SCT off-detector cooling PRR SCT off-detector cooling March March 2005.
NA62 – GTK Cooling Station 1 Main characteristics Fluid: C 6 F 14 (fluorocarbon) Operating temperature: -30 °C ÷ -10°C Temperature precision: ±1 K Temperature.
Hydrogen system R&D. R&D programme – general points Hydrogen absorber system incorporates 2 novel aspects Hydrogen storage using a hydride bed Hydrogen.
CPPM Pixel Evaporative Cooling Plant Description & Operation with C 3 F 8 or C 4 F 10 G. Hallewell, CPPM, Feb 07, 2005.
IBL cooling thermal chock incident 15 October The IBL cooling team.
LHCb-VELO Microchannel fracture safety system and evaporator concept 26 June 2015 Bart Verlaat 1.
CUE – Make Any Pump an E-Pump
AIDA Traci commissioning LHCb – CO 2 cooling meeting 18 March 2015 Kamil Wojdyla, Lukasz Banasik, Nicola Spadavecchia, Tomasz Kucharski, Piotr Dziurdzia,
IBL cooling operation at bake-out IBL CO2 meeting 10 April 2014 Bart Verlaat, Lukasz Zwalinski, Maciej Ostrega, Olivier Crespo Lopez 1.
Process Definition of the Operation Modes for Super-FRS Magnet Testing CSCY - CrYogenic department in Common System, GSI, Darmstadt Y. Xiang, F. Wamers.
IBL CO 2 cooling planning 03 July 2013 Jan Godlewski, Bart Verlaat, Lukasz Zwalinski 1
A.Henriques (JCOV meeting 31/5/2001) ATLAS Calorimeter cooling project Goal: u Definition of a common frame work for the cooling of the ATLAS calorimeter.
Installation of the T600 at Fermilab CSN2, September 22,
Claudio Bortolin. pump: replaced outlet filter: replaced demineralized cartridge: replaced mechanic filter on air control: replaced SSD chilled water.
Status of the Marco chiller and Marco capacity analyses Bart Verlaat, Lukas Zwalinski, Maciej Osterga, Jan Godlewski MPI Munich,1 March.
GTK GAS COOLING SYSTEM Marco Statera, Vittore Carassiti, Ferruccio Petrucci, Luca Landi, Stefano Chiozzi, Manuel Bolognesi NA62 - GTK working group meeting.
C. Kiesling, 7th Belle II VXD Workshop, Prague, Jan , VXD Cooling Requirements IBBelle Overview Commissioning at CERN (ATLAS version) Software.
KIT – University of the State of Baden-Wuerttemberg and National Research Center of the Helmholtz Association Institut für Experimentelle Kernphysik
7 February 2012 Annekathrin Frankenberger (HEPHY Vienna) Open CO 2 Cooling System at the beam test Belle II SVD-PXD Meeting.
H.-G. Moser, PXD Workshop, Valencia, January 2016 IBBelle for VXD 1 Use one unit first Assemble on a platform which fits in a 20’ container No redundancy.
V Thermo-siphon Workshop Test protocol Jan Godlewski PH/DT-PO On behalf of thermo-siphon working group
13 Januar 2011 Immanuel Gfall (HEPHY Vienna) Annekathrin Frankenberger (HEPHY Vienna) SVD Cooling Cooling Meeting Karlsuhe.
KIT – University of the State of Baden-Wuerttemberg and National Research Center of the Helmholtz Association Institut für Experimentelle Kernphysik
C. Kiesling, BPAC VXD Mechanics Meeting, KEK, Sep. 8-11, Cooling Systems for the VXD Overview of Cooling Requirements General Principles of the.
H.-G. Moser, PXD, July 12, 2016 IBBelle: Status & Plans 1 2-phase CO 2 cooling system for PXD and SVD Minimal temperature: - 40 o C (intended: -30 o C)
SVD Slow Control Markus Friedl (HEPHY Vienna) DAQ/SC Kickoff Meeting, 8 November 2012.
MVD COOLING STATUS COOLING PLANT: -UPDATE of THE HYDRAULIC SYSTEM -INTEGRATION OF THE MVD COOLING CIRCUIT PATHS INSIDE THE PANDA AREA -DEFINITION OF THE.
S A Griffiths CM42 June 2015 Electrical & Control.
MENU PRINCIPAL. THIS PRESENTATION INCLUDES THE SOURCES OF AIR, THE MAJOR SYSTEM COMPONENTS AND THE WAY THE CONTROLS AND INDICATORS ARE USED TO OPERATE.
H.-G. Moser, April 25, 2016 Gemba Summary 1 Plan: Shipment (sea transport in summer) 6-8 weeks => arrival August/September Commissioning: After October.
Demineralised water cooling system
2016/12/6 Yasuhiro R&D status of a gas-compressor based 2-phase CO2 cooling system for FPCCD vertex detector 2016/12/6 Yasuhiro Sugimoto.
delivered with the compressor
IBBelle: Status & Plans
Installation of the T600 at Fermilab
Status of Cooling Development in Karlsruhe
ATLAS ITk Baby-DEMO update
Interlock L.Lanceri /INFN Trieste VXD Workshop, Pisa 03/10/2014
Design of the thermosiphon Test Facilities 2nd Thermosiphon Workshop
ARAC/H/F Air-cooled water chillers, free-cooling chillers and heat pumps Range: kW.
Sub-system integration for the VBOX
Unit 45: Circuits and components Dr
Circuits and components Chapter 45
Status of the CO2 Cooling Project
Marco Statera NA62 - GTK working group meeting
Unit 45: Circuits and components Dr
VELO Thermal Control System
FPix Cooling Circuit. FPix Cooling Circuit FPix Shared HD - Nominal Flow ΔPtotal = 5bar Δm = 0.5g/s mnominal = 2.6g/s ΔPtotal = 10bar Δm = 0.2g/s mnominal.
Forum on Tracking Detector Mechanics - Bonn, May 2016
Tracker cooling loop “check out” draft for discussion
VELO Thermal Control System
Insertable B Layer Cooling System
Recirculating CO2 System
SHMS Cryogenics and Q2(Q3Dipole) Cool Down
IBBelle: Status Commissioning at MPP Transport to KEK
Overarching Commissioning Plan
Unit 45: Circuits and components Dr
Presentation transcript:

Status CO2 Cooling IBBelle: Reconnection after Belle II Roll in N2 System, Heaters Marco?

CO2 System Junction Box IBBelle VXD needs 12 cooling circuits: (4 PXD, 8 SVD) The CO2 flow is split in the manifolds into these 12 branches (BWD: 8, FWD: 4) Vacuum insulated flex lines transport the CO2 to the dock boxes (connection to detector) Furthermore: 14 N2 lines for gas cooling (copper tubes) Manifold (FWD) Manifold (BWD) Junction Box IBBelle

Commissioning of IBBelle at KEK IBBelle, transfer Lines, Junction Box, Manifoldes installed in 2016 => demonstrated 3000W cooling power at -30°C Flexlines. Dock boxes ,N2 installed January 2017 (Karsten Gadow) => all 12 lines are cooled April: IBBelle emptied and disconnected from transfer lines => roll in May: re-connection, filling Restarted without problems New: Status signals installed (interlocks) Pressure monitors for cooling water and pressuried air Swith over control from WinCC OA to EPICS

Interlocks IBBelle issues 3 interlock levels (24V ‘WAGO’ levels, inverted: ‘on’: no alarm): Unit off or running, but no circulation of CO2 Unit interlocked (internal fault). Unit off or running and CO2 circulating, but temperature set point not yet reached. 4) Running and temperature set point reached The logic can be programmed differently Two interlocks can be accepted: Complete shut down. Warm operation (Provide cooling but CO2 temperature above dew point). Level 2) should be used humidity in warm volume is detected or if flex line vacuum is bad. However, it takes ~ 30 min to go from -30°C to 10°C or vice versa Level 1) is ok to prevent a start. A shut down during operation may lead to unpredictable conditions: The tubes may be filled partially with liquid, cold CO2 which may flow back and forth uncontrolled. It takes ½ day for the system to warm up!

Pressure Sensors Pressure sensors (provided by KEK) Input and output pressure of cooling water Pressure of compressed air Integrated in PLC and EPICS Air pressure sometime too low: Oscillates between 5 and 6 bar Pneumatic valves need > 5.5 bar to work properly. Below 5 bar the might go to ‘safe state’ (switches off IBBelle) Install buffer vessel with one way valve (KEK)

Heaters and NTC sensors Each CO2 branch will be equipped with a 100W heater (inlet) and a NTC sensor (outlet) Temperature monitoring of each individual branch. During commissioning: dummy power. With detector: can control onset of CO2 evaporation. NTC sensors will be read out be Trieste system. Control and interlock system for heaters under construction at MPI Heaters automatically interlocked if T > 80°C Control by on/off puling of 50Hz 230V supply Power switching during AC zero crossing (no transients => low noise) Heater with metal case to clip on CO2 tube Foam ceramics insulation (1/2 shell) Heater with Insulation and sensor

Tests Open, simple CO2 system to test Heat transfer, max. temperature, Manometer Needle valve Pt100 heater Pt100 Pt100 Backpressure regulator Open, simple CO2 system to test Heat transfer, max. temperature, Interlock and noise, ….. CO2-bottle Important: noise tests of Siemens 3RF2330-1AA04 power switch DC system difficult

MARCO Plan: IBBelle for phase II, MARCO for integration (PXD & SVD) Have MARCO till end of 2017, CERN asked to have it then (Integration & phase II in 2018!) Can IBBelle serve both? Power ok, but no independent operation of two systems possible Max. allowed CO2 volume would be exceeded => veto by KEK safety Build unit B (with accumulator): estimated construction time: 8 months (IBBelle: 12 months) (delivery of accumulator: 6 months) shipment: 2 months commissioning: 1-2 months) But: assembly space and manpower not available Cost: > 100 k€ Copy MARCO ? Others? No No

Conclusions Shipment, customs, installation at KEK went according to schedule. Transfer lines to junction box and manifolds Installed. Flex lines and CO2 dock boxes installed. CO2 circulated up to dock boxes (~40m downstream from IBBelle). Reconnection after roll in ok. EPICS control works IBBelle is able to cool >3000 W @ -30°C (required: 1100 W). All 12 parallel branches are serviced. To be done: Test, construct, install and commission heater system Replacement of MARCO ?