Generic GE TRS Compliance Summary

Slides:



Advertisements
Similar presentations
AS9102 First Article Inspection Report
Advertisements

Subsea Decommissioning
Job Performance Requirement 7-13 Servicing an SCBA Cylinder Using a Cascade System.
PPAP Requirements Training
First Article Inspection Report
Pressure Measurement By Manometer
First Article Inspection
SELECT Scheme Provider Certification of Construction (Electrical Installations to BS 7671)
FHM TRAINING TOOLS This training presentation is part of FHM’s commitment to creating and keeping safe workplaces. Be sure to check out all the training.
Jon KleinISEProject Manager Nguyen VuMETechnical Lead Kyle MengesMETechnical Lead Christine LowryMEDesign Engineer Chris SteinMEDesign Engineer Priya NarasimhanEEElectrical.
1 Welcome to GE! The attached presentation has been put together to assist you in completing your required I-9 form through the use of our I-9 wizard.
Release Detection for Piping Spring Types of Piping Safe Suction “Unsafe” Suction Pressurized.
Level 2 Unit 4 Producing Engineering Solutions Engineering Diploma Level 2 Unit 4 Producing Engineering Solutions An Approach to Unit Delivery and Assessment.
What Documentation Needs to be Submitted With an Approval Application?
U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration Approvals and Permits Division Isreal Mallard Transportation Specialist,
Application – Identifying, Listing Equipment, and Documentation
MICE hydrogen review Approval process. Process Working group Document pack PPD Director & ISIS Director Prerequisite testing Completed action list Approval.
HPU FILTERS LOW PRESSURE FILTER FROM APU UNIT. CLOSE APU HYDRAULIC FLUID VALVE. FILL FILTER WITH HYDRAULIC FLUID PRIO TO INSTALLATION. LUBRICATE GASKET.
Biosolids Annual Report A Step by Step Guide to Submittal.
1 HIGH ENERGY ACCELERATOR RESEARCH ORGANIZATION KEKB Review Committee/ NAKAI Hirotaka KEK Crab Cavity - Cryogenics - KEKB Crab Cavity Group - presented.
CONFIRMING ORDERS Purchasing and Accounts Payable Department 2015.
NCSX Water Systems Larry Dudek March 21, Plan for FY03 Review questionable legacy equipment and verify viability for NCSX New Scope: NB support.
06/02/20161 Benny Hoff TÜV NORD Sweden AB AFS 2005:2 Installations.
3017 North Stiles, Suite 100 Oklahoma City, OK Toll-Free
GLAST LAT ProjectFebruary 10, 2004 R. Johnson Tracker MCM Production Readiness Review 1 LAT QA has hired a full-time on-site representative (Donald Knaepple)
SCG-SH-0200 Southern Company Generation Clearance Procedure Awareness Training for Contractors and Nonlisted Personnel.
North & South America Regions GE TRS Compliance Summary
Unit 11: Calibrating Instruments
Lock Out & Tag Out.
Getting Started with the Grants Portal Grants
Technical Scope of Work
Part 2 Technician’s Guide & Workbook for Duct Diagnostics and Repair
Buy A&M Catalog/Punch-Out Training
ISUAL Product Assurance
Teleconference ACS – FREIA 10th May 2017
USAJOBS – Application Manager
Reimbursement Process Student Services Department
CIS Regions GE TRS Compliance Summary
RazorBuy Sole Source Form
OSHA Most Frequently Cited Serious Violations
Subsea 100 Global Services Products Presentation
Documentation status in WP 5 Goal: To collect all documentation/know-how needed in a structured way for the ESS installation, commissioning, operation,
First Article Inspection
Machine Guarding.
QPS EVALUATION SERVICES INC.
Technical Scope of Work
Setup Summary Great Plains November 2006.
Interested to become an EOQ Member?
Home You can view all Flo Fab rep order that been sold so you can easily get end user feedback Call factory for password.
Cryoplant Installation Design Summary
For the benefit of business and people
Buy A&M Receiving Training
Reliance Supplier Corrective Action Process
Device Apps Joseph Ngari| Program Manager.
Vendor Management The Pre-Qualification Package and You!
First Article Inspection
IECEx ExTAG Training Workshop 29th September
ESS Installation Binders Readiness Reviews Work Orders Mikael Jakobsson ESS Installation Manager Sep , 2018.
Installation Binder / IRR – an example
Workshop commissioning Installation Coordination at ESS
2.1. Monitoring of products placed on the market To verify the products comply with applicable directives EC declaration of conformity and technical.
Workshop on the Pressure Equipment Directive, Riga,
Supplier Guide to Jaggaer Sourcing Director
Practical Aspects and Running of the Project
ESS approach and support for Declaration of Conformity (CE-marking) Fredrik Håkansson ESS Accelerator Collaboration Board Meeting Trieste
CICA Project of the Year Entry Template
Standard Business Processes
Technology Maintenance
UK-wide study (lead R&D office in other UK nation)
Presentation transcript:

Generic GE TRS Compliance Summary Summary Required for all TRS Documents Submitted to GE

Vendor & Purchase Information 1. Vendor/Supplier Information 2. Product Information 3. Project Information – comes from drawing and/or specification 4. Provided by the vendor/supplier/ manufacturer

Support Documentation Steps If drawing or specifications require the documents to be submitted to GE, fill in with a “Yes”, if not “No” If drawing or specifications require the documents to be translated, fill in with a “Yes”, if not “No” Verify the documents are attached with submittal to GE

Pressure Equipment Steps Does your equipment include pressure equipment (valve, pressure vessels, pipping, tubing, boilers, etc)? If No, Check “No” & skip to next section (Electrical Equipment) If Yes, Check “Yes” & Fill out product information

Electrical Equipment Steps 1. Does your equipment include electrical equipment (controls, measurement devices, etc.)? If No, Check “No” & skip to next section (Measurement Devices) If Yes, Check “Yes” & move to the next question Identify drawing or specification “Zone” equipment will be installed in. If Zone 0, 1, 2 complete Hazardous Location certification information Complete other electrical certification information (UL,CSA,etc)

Measurement Devices Steps Does your equipment include measurement Devices (gauges, Thermocouples, sensors, etc)? If No, Check “No” & skip to next section (Machinery DoC/DoI) If Yes, Check “Yes” & Fill out product information

Machinery DoC/DoI Steps Does your equipment require a top level DoC/DoI ? If No, Check “No” & skip to next section (Additional Certification) If Yes, Check “Yes” & Fill out product information

Additional Certifications Steps Does your equipment require any additional certifications? If No, Check “No” & skip to next section (Declaration) If Yes, Check “Yes” & Fill out product information

Submit Documentation to GE Declaration Sign the declaration Submit Documentation to GE Collect &”package all the documentation identified in the TRS Summary Submit TRS Summary & identified documents to GE Sourcing via approved tools (SDX, documentum, etc.)