ELCITA UPDATE March 2017.

Slides:



Advertisements
Similar presentations
Progress and Status COMPANY SWITCHES INSTALLED A/V CABLE INSTALLED THEATRICAL CABLE INSTALLED ORCHESTRA LIFT IS OPERATIONAL STAGE.
Advertisements

Recycling Program Benefits: New Products & Environmental Savings Iowa State University February 8, 2007.
Cost Estimation System Tool
6 th Street Water Main And Street Reconstruction 2013.
Update of Downtown Rail Improvements DFWI & Chamber Stakeholders February 26, 2014 Alonzo Liñán, PE, PTOE City of Fort Worth.
Briefing on Cape Town’s Integrated Rapid Transit System 2009.
District 2 System Preservation Projects for FY 14 and FY 15 Gregory B. Holsey - District Engineer Thomas S. Revelle - Assistant District Engineer – Project.
MODERN VENTURES (Pty)Ltd t/a NORTHERN GATEWAY CITY PORTION 2 OF 36-NQ
CAMPAN VALLEY RESIDENTIAL LAYOUT PROJECT PHOTOS-FEBRUARY 15 th 2015.
VTA Light Rail System and Safety Enhancements MTC Railroad Crossing Seminar May, 21, 2008.
Nick Johnson, PE Senior Project Manager October 1, 2012.
Alachua County Board of County Commissioners March 24, 2009 Main Street Milling & Resurfacing Project Project Update & Plan Approval.
What does PWD do for our City?. Administrative Services Engineering Operations.
Project Update Colorado Esplanade Project.
21 st Sep Election Process July & August
TCC Budget Highlights Capital Budget - $190.43M Operating Budget - $384.9M Total Budget – $575.33M.
ELCITA Update 25 th August Update – Estate Management E – Toilets 8 e-toilets operational and work order placed for 4 more e-toilets Under Ground.
October E – Toilets 8 e-toilets operational and work order placed for 4 more e-toilets. Under Ground Drainage System Completed & Tender Published.
Greetings from Spa Eco City & the creators of Frangipani Country Estates!! Greetings from Spa Eco City & the creators of Frangipani Country Estates!! 1.
US 36 Commuting Solutions Northwest Rail Westminster Segment/Eagle P3 Oct. 14, 2014.
February Skywalk Contract Awarded to M/s mayaPRAXIS to provide Architectural & Structural feasibility report of Skywalk system for Electronics.
We recycle! Enjoy Learning Science. We recycle! It is made of glass. It is made of metal. It is made of cardboard. It is made of plastic.
November E – Toilets 8 e-toilets operational and 4 more e- toilets work in progress. Under Ground Drainage System Completed & Tender Published.
Light Rail Project Community Light Rail Support Plan Committee 14 August 2014 Kensington Kingsford.
Approve Change Order No. 4 for the Caylor Wholesale Meter Modification Item 4B.
June Skywalk M/s mayaPRAXIS have submitted the draft report - Preliminary Feasibility Study on Skywalk system for Electronics city phase 1. E.
Big Cypress Basin Capital Project Update Jeffrey Kivett, P.E., Director Operations, Engineering and Construction Division Jeffrey Kivett, P.E., Director.
Reconstruction of Beach Drive Reconstruction of Beach Drive National Park Service U.S. Department of the Interior Rock Creek Park National Park Service.
White Pigeon Community Schools
We would like to list below an update on the Progress of the Project.
ELCITA UPDATE April 2017.
ELCITA UPDATE February 2017.
Pioneer Road Relocation and Reconstruction Project
ELCITA UPDATE JULY 2017.
ELCITA Update December 2015.
Fun Facts: James M. Bennett High School
ELCITA UPDATE January 2017.
ELCITA UPDATE AUGUST 2017.
ELCITA UPDATE November 2016.
When Nature and Humans Collide
ELCITA Update May 2016.
ELCITA Update April 2016.
Eagle P3 Project Update RTD Board of Directors Sept. 2, 2014.
SKYWARDS TECH PARK.
We would like to list below an update on the Progress of the Project.
ELCITA UPDATE SEPTEMBER 2017.
ELCITA UPDATE October 2016.
Construction Report March 25, 2010.
ELCITA UPDATE August 2016.
A Vision For Camberwell – Improving Streets and Public Spaces In SE5
Condominiums Community
Udaipur Smart City SUMMARY OF PROGRESS
ELCITA UPDATE November 2017.
Electronics City Industrial Township Authority
ELCITA Update March 2016.
ELCITA UPDATE March 2018.
ELCITA UPDATE April 2018.
ELCITA UPDATE July 2016.
ELCITA UPDATE December 2016.
SE 12th Street Roadway Improvements February 8, 2005.
ELCITA Update January 2016.
25th Avenue Grade Separation
25th Avenue Grade Separation
ELCITA UPDATE September 2016.
A133 IPSWICH ROAD SCHEME COMMUNICATION UPDATE ( )
A133 IPSWICH ROAD SCHEME COMMUNICATION UPDATE ( )
ELCITA UPDATE June 2019.
ELCITA UPDATE August 2019.
ELCITA UPDATE July 2019.
ELCITA UPDATE April
Presentation transcript:

ELCITA UPDATE March 2017

Smart City Project Initiatives for Test bed M/s Velankani (By Design) have provided 50 Nos of 5 MP Cameras. 14 have been installed & the balance installation is in progress.

Smart City Project Initiatives for Test bed 43 Nos of Modified Street light poles have been erected on Infosys Avenue & Pump house road.

Smart City Project Initiatives for Test bed Smart Water Meter supplied by M/s GAIA has been installed in IFIM. TCL are providing the network Connectivity.

Smart City Project Initiatives for Test bed M/s Tejas Network are providing Network design for entire EC & POE switches for the cameras on the test bed. M/s Multiproe have been finalized for supply & installation of Video wall at our command Centre. M/s Wipro Ltd are the integrated partner for Smart City Interface. M/s P Park E are providing parking sensors through LORA network.

LOCATION MAP FOR RELOCATING SKYWALK FROM HP to ELECTRONICS CITY SIGNAL (from West Phase to East Phase)

PROPOSAL FOR RELOCATING SKYWALK FROM HP to ELECTRONICS CITY SIGNAL (from West Phase to East Phase)

PROPOSED 400 KLD STP at KSSIDC COMPLEX

Estate Management Modification of existing street light poles with LED lights, Splitters, Camera, Advertisement Board, etc West Avenue 1 –Infosys avenue West Avenue 8 – Pump house Road E – Toilets 20 e-toilets Installed & Operational Estate survey Final Data check & Software Training work in progress

Footpath Works – Completed Footpath Work along East Avenue 1 (TCS Road) Footpath Work along West Lane 1 (MSME Road)

Footpath & Drain Work along East Lane 1 (Hical Road) Footpath Works – Completed Footpath & Drain Work along East Lane 1 (Hical Road)

Footpath Works – Completed Footpath works near Erkadi Systems – West Avenue 2 RCC Culvert near Erkadi Systems – West Avenue 2

Footpath & Drain Works – Under Progress West Avenue-9 (Petrol Bunk Road) West Avenue-8 (Police Station Side)

Footpath Works – Under Progress Pavers Laying Work near C-dot (West Avenue – 1) Footpath works near Siemens – West Avenue 1

Sump Works – Under Progress 3KL Capacity UG Sump for E- Toilet (HP Avenue) 3KL Capacity UG Sump for E- Toilet (BWSSB)

Sump Works – Under Progress 3KL Capacity UG Sump for E- Toilet (Opp DMart) 3KL Capacity UG Sump for E- Toilet (Tech Mahindra)

Fabrication Work – Under Progress Providing MS Railing for pedestrian safety – West Avenue 1 (Infosys Avenue)

Other Works – Completed 2 Nos of Cattle trap at 300KLD STP Sewer line works opp HICAL East Avenue 3 (Tech Mahindra Road)

Chain-link fencing for Siemens RMU Yard Fabrication Work – Completed Chain-link fencing for Siemens RMU Yard

Estate Management Contract Awarded Proposed construction of Drains, laying of Pavers, Kerb stones and Drain cover slabs from Xime Junction to Tata power rear gate & TCS Gate no 2 to Edizi Tools junction (East Avenue 2 & 4), East Phase Providing and laying of Asphalting using 60/70 grade bitumen from Edizi Tools to TCS gate no 3 via Y-Junction, (East Avenue 1& 4). East Phase Along Café Corner & JP IT Park Road

Estate Management Contracts on Anvil Providing House Keeping Services to ELCITA within e-city Industrial Township Area. Modification of existing street light poles with LED lights, Splitters, Camera, Advertisement Board, etc Construction of Concrete Drains, laying of Pavers, Kerb stones and Drain cover slabs Erkadi System to Arvind Mills (West Phase) Construction of 400 KLD STP in KSSIDC Land, West Phase. Construction of 500 KLD STP in KIADB Land, East Phase.

Total E-waste Disposed – 4 Tons SUSTAINABILITY Total E-waste Disposed – 4 Tons Total compost Sold and used – 6 Tons Total waste managed for last two years - Paper recycled 255.7 Tons Plastic recycled 370.8 Metal recycled 21.5 Glass recycled 87 Other Dry waste recycled 57.6 Total Dry Waste recycled 792 Average capacity use of ELCITA STP - 200 KLD

Thank You