Report: GEOSS Common Infrastructure (GCI) Co-ordination team (CT) Alan Edwards Transitional Co-chair (European Commission) On behalf of the GCI-CT 18th.

Slides:



Advertisements
Similar presentations
© GEO Secretariat Agenda Item 3. GEO UPDATE. © GEO Secretariat Membership 67 members and 43 Participating Organisations – New Members:Latvia, Moldova,
Advertisements

Overview of Capacity Building Committee Activities GEO Capacity Building Committee Meeting Brussels – 14 September 2006 Errol Levy DG Research – European.
GEOSS Data Sharing Principles. GEOSS 10-Year Implementation Plan 5.4 Data Sharing The societal benefits of Earth observations cannot be achieved without.
AR – Issues for Attention Tactical and Strategic Guidance documents – what is the agreed approval/ publication process? –Strategic Guidance will.
Report of the Architecture and Data Committee (ADC) for the C4 Meeting Ivan B. DeLoatch, ADC Co-chair June 2008.
GEO-5 in Ottawa 1 29 November 2004 Draft GEOSS 10-Year Implementation Plan and Status Report on Reference Document Ivan B. DeLoatch, Toshio Koike, Robert.
Report: GEOSS Common Infrastructure (GCI) Co-ordination team (CT) Alan Edwards Transitional Co-chair (European Commission) On behalf of the GCI-CT 18 th.
1 GEOSS Monitoring & Evaluation. 2 1st GEOSS M&E WG meeting outcomes Agreed on 1.the final draft of Terms of Reference for the M&E WG 2.The plan for delivery.
C4 and EXCOM 12 Alan Edwards European Commission Report to Capacity Building Committee May 22, 2008.
GEOSS Common Infrastructure (GCI)
Alan Edwards European Commission 5 th GEO Project Workshop London, UK 8-9 February 2011 * The views expressed in these slides may not in any circumstances.
Roadmap for Sourcing Decision Review Board (DRB)
Slide # 1 Report to ADC AR Status Doug Nebert, POC U.S. Geological Survey.
Auditing, Assurance and Governance in Local Government
© GEO Secretariat The Group on Earth Observations – Status and Post 2015 Osamu Ochiai GEO Secretariat 41 st CGMS Tsukuba, Japan 8-12 July 2013.
Slide 1 WGISS CEOS WGISS 22, Annapolis September 2006 Report on GEO Architecture & Data Committee (ADC) Report on GEO Architecture & Data Committee.
How GEO works  Coordinating activities of Members and Participating Organisations  Supporting the development of capabilities for Observations, Processing.
2016 Transitional GEO Work Programme Discussion & CONSOLIDATION Session 10, 2015 GEO Work Plan Symposium Geneva, 7 May 2015 Alan Edwards (IPWG) Giovanni.
Report of the IOC Task Force on the GEOSS Common Infrastructure (GCI) Ivan DeLoatch, U.S. Geological Survey Alan Edwards, European Commission Co-chairs.
GEO Strategic Plan : Implementing GEOSS AN UPDATE GEO WORK PLAN SYMPOSIUM 05 MAY 2015 GENEVA, SWITZERLAND.
GEO Implementation Plan 2025 Barbara Ryan & Espen Volden GEO Secretariat SIT Workshop Agenda Item 15 CEOS SIT Technical Workshop CNES, Montpellier, France.
Alan Edwards European Commission & GEOSS Data Sharing Task Force Co-Chair 5 th GEO Project Workshop London, UK 8-9 February 2011 The GEOSS Data Sharing.
GEOSS components testing procedure 14 th ADC – Pretoria – 20 th May 2010.
IEEE /r3 Submission September 2008 John Notor, Cadence Design Systems, Inc.Slide 1 IEEE IMT-Advanced Review Process Date:
PACIFIC AID EFFECTIVENESS PRINCIPLES. Purpose of Presentation Provide an overview of Pacific Principles on Aid Effectiveness Provide an overview of Pacific.
P1516.4: VV&A Overlay to the FEDEP 20 September 2007 Briefing for the VV&A Summit Simone Youngblood Simone Youngblood M&S CO VV&A Proponency Leader
@2002 Copyright, Itreya Technologies CMMI kick off July 2005.
GEOSS Common Infrastructure Internal Structure and Standards Steven F. Browdy (IEEE)
GEO Work Plan Symposium 2012 ID-01 Advancing the GEOSS Data Sharing Principles.
ADC Meeting # 2, Seattle, July 2006 Slide # 1 Overview of ADC activities (Committee) Ivan Petiteville, CEOS Meeting # 2, Seattle, July 20-21, 2006.
GEO ADC meeting, Washington DC, USA, Sep Slide # 1 DA DA Virtual Constellations Ivan Petiteville, CEOS GEO ADC Meeting, Washington DC,
Alan Edwards Co-chair / European Commission On behalf of the Data Sharing Task Force 21 st Meeting of the GEO Executive Committee Geneva, Switzerland
® GEOSS AIP 5 Water SBA Update HDWG June 2012 Matt Austin NOAA Stefan Fuest KISTERS Jochen Schmidt NIWA.
Initial Operating Capability Task Force (IOCTF) Status Briefing September 21, 2008.
Task ID_01 “Advancing GEOSS Data Sharing Principles” The Group on Earth Observations Data Sharing Activities for 2013 Reported by Lerato Senoko 29 th EXCOM:
GEOSS Common Infrastructure (GCI) & GCI-Coordination Team (GCI-CT) Ivan Petiteville, GCI-CT Co-chair GEO Architecture & Data Committee meeting Campos do.
Robert S. Chen Co-chair/Data Sharing Task Force Geneva, Switzerland 1-3 February 2011 Implementation of the GEOSS Data Sharing Principles.
Data Sharing Task Force Update Ivan DeLoatch, USGS, ADC Co-chair Alan Edwards, EC, DSTF Co-chair ADC/CBC Joint Committees Meeting Sao Paulo, Brazil 28.
Architecture Task AR Status Presented to the July Meeting of the GEO and Architecture and Data Committee Dr. Thomas C. Adang AR Point.
The Data Sharing Working Group 24 th meeting of the GEO Executive Committee Geneva, Switzerland March 2012 Report of the Data Sharing Working Group.
GEOSS Common Infrastructure Initial Operating Capability Directions and Discussion Presented to GEO ADC Geneva May
IEEE /r5 Submission November 2008 John Notor, Cadence Design Systems, Inc.Slide 1 IEEE IMT-Advanced Review Process Date:
GEO ADC Co-Chair meeting USGS, Reston, Dec Slide # 1 AR Interface implementations for GEOSS George Percivall
GEOSS Common Infrastructure Slides prepared by Alessandro Annoni, JRC Jay Pearlman, IEEE and GEO Secretariat.
INTERNATIONAL ELECTROTECHNICAL COMMISSION «Harmonization of the national accreditation system of Eurasian countries» 23 December 2013 Moscow World Trade.
Work Plan Work Plan Management (Document 21)
© GEO Secretariat Work Plan Management Update GEO Work Plan Symposium 30 April – 2 May 2012.
CEOS Response to GEOSS Water Strategy
Reporting, Monitoring and Evaluation
INSPIRE and the role of Spatial Data Interest Communities (SDIC)
Subgroup 2 - Foundational Tasks structure review and recommendations for the WP Francisco Chavez (POGO, lead), Ivan Petiteville (CEOS), David.
AR Doug Nebert, POC-elect GEO ADC Co-Chairs Meeting,
The Standards and Interoperability Forum
GEOSS Data Sharing Principles
Implementation Strategy July 2002
Flooding Walkdown Guidance
Work Plan Management GEO Work Plan Symposium 30 April – 2 May 2012
Validation & conformity testing
GEOSS EVOLVE Osamu Ochiai GEO Secretariat CEOS WGISS-43
Closing Plenary.
Outcomes from the GEO Ministerial and GEO-X Plenary
ESS Vision 2020: ESS.VIP Validation
Memorandum of Understanding
Informal document GRVA nd GRVA, 28 Jan Feb. 2019
IEEE IMT-Advanced Review Process
IEEE IMT-Advanced Review Process
IEEE IMT-Advanced Review Process
Comments on IMT-Advanced Review Process
IEEE IMT-Advanced Review Process
Chair: Jin Seop Park, Republic of Korea Secretary: Thomas Kinsky, OICA
Presentation transcript:

Report: GEOSS Common Infrastructure (GCI) Co-ordination team (CT) Alan Edwards Transitional Co-chair (European Commission) On behalf of the GCI-CT 18th Meeting of the GEO Executive Committee Geneva, Switzerland 22-23 March 2010 1

GCI-CT: Background 2009 GEO VI Plenary endorsed the GCI architecture recommended by the IOC TF. single GEO Web Portal (GWP) and a single Clearinghouse (CH) GCI Coordination Team (GCI-CT) created to define the selection process and oversee the long-term operations of GCI. GCI-CT Kick-off Meeting, Feb 23-24, 2010.

GCI-CT: recent Activities Weekly telecons since GEO Plenary Draft functional test procedures (Feb 18, 2010) GCI-CT Kick-off meeting (Feb 23-24, 2010) Consolidation of Work Plan & Consolidated Requirements Definition of Selection Process and Test Logic Agreement of Weights on criteria Draft Letter with criteria to GCI Providers Letter sent to GCI Component Providers (2 March 2010)

GCI-CT: recent Activities Meeting GCI-CT and Test Teams (INPE, JRC) (3 March 2010) Optimization of test logic Consolidation of Work Plan Establishment of rating system Assessment of Test Procedures by Test Teams (INPE, JRC) (8 March 2010)

GCI-CT: Deliverables to ExCom-18 GCI-CT Terms of Reference: ExCom Document 8 Recommendations for Long-Term Operations of the GCI: updated version of 5 March 2010 Action (Work) Plan: updated version of 5 March 2010 Note, further update still needed to reflect the Test Phases and associated milestones dates. Consolidated Requirements – updated Note, further update still needed to include a new requirement relative to the time notice (90 days) for a GCI Provider to inform the GEO Secretariat in case of their cessation of GCI operations.

GCI-CT: Terms of Reference Purpose The GCI-CT is to oversee the development, implementation, and operation of the GEOSS Common Infrastructure in support of the GEO.

GCI-CT: Terms of Reference Objectives: The GCI-CT is convened: to provide guidance on the sustained operation of the integrated GCI and its components in light of known and evolving requirements, whilst adhering to agreed architecture standards and principles; to provide recommendations including provisions for resource needs, when appropriate, addressing sustainability and transparency of GCI operations; to engage the GEO Members, PO and component providers in assuring sustained and scalable operations of the GCI to realise the full potential of GEOSS; to facilitate collection of sufficient resources of documented quality in the GCI.

GCI-CT: Terms of Reference Approach and Functions (abbreviated): GCI-CT reports to the Plenary and Executive Committee; The GCI-CT shall be composed of a balance of technical and non-technical representation; Tasking of specific research or investigations to sub-teams of experts will be made by the GCI-CT to address identified issues; GCI operations shall accommodate the voluntary nature of contributions and build on existing efforts, conforming to the Recommendations for Long-Term Operations of the GCI.

GCI-CT: Membership (Currently 32 in total) Australia 1 Austria 1 Brazil 1 CEOS 1 China 1 EC 2 ESA 1 ESIP Fed 1 EUMETSAT 1 Finland 1 France 1 Germany 1 IEEE 2 Italy 2 Japan 3 Madagascar 3 OGC 1 Pakistan 2 UIC (USA) 1 USA 4 WMO 1

GCI-CT: Membership Transitional Co-Chairs (from the IOC-TF to the GCI-CT), through to 31 July 2010: Ivan DeLoatch (USGS) Alan (“Ivan”) Edwards (European Commission) Ivan Petiteville (CEOS) Formal Co-Chairs: NONE at PRESENT

GCI-CT: Action (Work) Plan Item 5 Operations oversight – Based on operational statistics and monitoring of GCI and GEOSS resources, identify and address operational issues and remedies from a policy and technical perspective. CT undertakes this activity as a primary function. Operations teleconferences Identification and registration of GEO resources Systems policies

GCI-CT: Action (Work) Plan Item 1 Define criteria for qualification of GCI components, and for Portal / Clearinghouse selection. GWP = GEO Web Portal CL = Clearinghouse CSR = Component and Service Registry Inform providers on criteria by March 2nd, 2010 and solicit response before March 15th, 2010.

Single versus multiple GWPs & CLs GCI-CT: Selection of a single CL & GWP Single versus multiple GWPs & CLs Endorsed by Plenary GWP1 GWP2 GWP3 CSR CL1 CL2 CL3 USER USER USER GWP1 GWP2 GWP3 GWP CL CL CSR CSR Current GCI configuration IOC phase 2008-2009 Single CL / multiple Web Portal GCI configuration operational phase 2010-2015 Single CL / single Web Portal GCI configuration operational phase 2010-2015

GCI-CT: Selection of a single CL & GWP The GCI-CT has defined 6 criteria to select a single CL and single GWP which are aligned with the aim of ensuring the long-term operations for 2010-2015 and : 4 criteria to be met by all GCI Providers 2 additional criteria to be met by the Component and Service registry (CSR), CL and GWP (verification by tests)

GCI-CT: Selection criteria The GCI component provider commits to providing the necessary level of resources, (financial – both "in-kind" and actual, personnel, etc.), that will enable the sustained operation, enhancement and maintenance of the GCI during the period 2010 – 2015; The GCI component provider identifies the GEO Member or Participating Organisation "sponsoring" their operational engagement with GEO;

GCI-CT: Selection criteria The GCI component provider agrees to accept, abide by and implement the requirements set out in the GCI Consolidated Requirements document; The GCI component provider gives a guarantee that should it be obliged to cease its GCI support activities, a 3rd Party can fully take over the operation and maintenance of the corresponding GCI component(s), free from any restraints arising from software copyrights, IPR and with the availability of all necessary technical documentation;

GCI-CT: Selection criteria A GCI capabilities evaluation is undertaken to verify the compliance of the GCI component with the Consolidated Requirements and a rating is provided for objective comparison of offerings where multiple offers are made; A general usability assessment is conducted and offerings of GCI components are rated based on their subjective suitability for end-user needs.

GCI-CT: Selection criteria Weight (in %) Short Description 1 10 Financial support for 2010-2015 2 20 "Sponsoring" letter 3 Accept to implement the Consolidated Requirements 4 No restriction on S/W (intellectual property rights, etc...) if transferred to Third Party 5 25 Tests related to Consolidated Requirements 6 Usability Testing = 50 % = 50 % Functional testing Usability testing

GCI-CT: Action (Work) Plan Item 2 Verification Test Plan, specific tests are developed to evaluate Consolidated Requirements for each GCI component. Update Consolidated Requirements Document March 1st, 2010 (One further update required); Test development – Individual tests are developed and grouped into test scenarios for specific GCI components February 27, 2010; Publish tests – Test suites for each GCI component type are published to the providers. March 19, 2010.

GCI CP Selection Process: Testing Phases Testing aims at Verifying the implementation of the CSR, CLs and GWPs against Consolidated Requirements  functional testing Involving the User Community to evaluate the Usability of the GCI through the use of the GWPs  usability testing GCI Testing Teams Brazil (INPE) and European Commission (JRC) volunteer to run the Functional Tests US (EPA) volunteer to run the Usability Tests. Optimize the limited test resources by organizing the testing in two phases Phase 1: functional test of CSR and 3 CLs identify a single CL for phase 2  reduce number of phase 2 tests by factor 3 Phase 2: functional and usability test of 3 GWPs coupled to CL identified in phase 1

GCI-CT: Action (Work) Plan Item 3 GCI Component Testing Roadmap – Phase 1 Responses to GEO SEC letter with criteria (19 Mar): Action: Providers Self-Testing by CSR, CL, GWP (22 to 26 Mar) Action: Providers Phase 1: CSR, CL testing (29 March to 13 Apr) Action: JRC & INPE Report of CSR, CL testing (20 Apr) Action: JRC & INPE Clearinghouse to be selected for test phase 2 (27 April) Action: GCI CT

GCI-CT: Action (Work) Plan Item 3 GCI Component Testing Roadmap – Phase 2 GWP to reconfigure their systems (28 April to 6 May) Action: GWP Providers Phase 2: GWP testing with selected CL (7 to 17 May) Action: JRC & INPE Phase 2: GWP Usability testing with sel. CL (17 to 20 May) Action: US EPA Interim Reports of 1) GWP testing and 2) Usability testing (28 May) Action: 1) JRC and INPE, 2) US EPA Final Reports of 1) GWP testing and 2) Usability testing (Mid-June) Action: 1) JRC and INPE, 2) US EPA

GCI-CT: Action (Work) Plan Item 4 GCI Component Provider Selection Process Based on the selection criteria and the results of the usability and the functional testing: GCI-CT will prepare recommendations to approve the operation of single GCI components for each function. Due end-May 2010; Finalize document to recommend the most-highly qualified provider solutions to Executive Committee. Due mid-June 2010. Note: The version of the Action Plan submitted to EXCOM needs to be updated to reflect the revised schedule shown.

GCI-CT: Conclusion As requested by Plenary, updated versions of the GCI-CT documents have been prepared and submitted to EXCOM. All of these are “living documents”. In particular, the GCI-CT Action Plan should be seen as a “dynamic living document”, subject to frequent revision during 2010.

GCI-CT: Conclusion The process is underway that will lead to a recommendation on the single Clearinghouse and GEO Web Portal being prepared for EXCOM, with the expectation that this recommendation can be made available by mid-June 2010. It is important that this timescale is adhered to, as there is a clear need to complete the selection process as soon as possible, in order to allow the selected GCI Component Providers to work together to ensure that a truly operational GCI is implemented in advance of the GEO Ministerial Summit.