Positioning system Hardware

Slides:



Advertisements
Similar presentations
New (and old) oceanographic tools 2012 Workshop DHP 2012 Tina Miller-Way.
Advertisements

Work Package 2 / 3 TECHNOLOGIAL & PROCEDURAL HARMONISATION FixO3 General Assembly 14 th to the 16 th October 2014, Heraklion-CRETE ANTARES, CNRS, D.Lefevre,
LabVIEW 7.1 Tutorial. Measurement Lab. MECH262-MECH261 Imran Haider Malik January 16, 2006.
Concepts for Integrating Ocean Science Sensors on Submarine Cables.
Kay Graf Physics Institute 1 University of Erlangen ARENA 2006 University of Northumbria June 28 – 30, 2006 Integration of Acoustic Neutrino Detection.
1 MANO: An AUV for Engineering and Science Research Alison Proctor.
Status of the ANTARES Neutrino-Telescope Alexander Kappes Physics Institute University Erlangen-Nuremberg for the ANTARES Collaboration WIN´05, 6.–11.
Measurement System Evaluation pp Needed because total variance of process recorded is the sum of process variation and measurement variation.
Kay Graf Physics Institute University of Erlangen TeV Particle Astrophysics II Madison, WI, USA August 28 – 31, 2006 Towards Acoustic Detection of UHE.
ENGINEERING APPLICATIONS Telecommunication Long Distance Communication Handle large number of channels Signalling purposes Computer Networks Connecting.
Sebastian Böser Acoustic test setup at south pole IceCube Collaboration Meeting, Berkeley, March 2005.
Deep-sea neutrino telescopes Prof. dr. Maarten de Jong Nikhef / Leiden University.
D. Lefèvre et al. Meust Marseille Oxygen Dynamics in the Ocean Lefèvre, D., A. Robert, C.Tamburini, M. Boutrif, S. Martini K. Arnaud, S. Beurthey,
LIGURIAN NODE : MULTIDISCIPLINARY SCIENCE Dominique Lefèvre LMGEM Christian Tamburini LMGEM Anne Robert LMGEM Stéphanie Escoffier.
1 S. E. Tzamarias Hellenic Open University N eutrino E xtended S ubmarine T elescope with O ceanographic R esearch Readout Electronics DAQ & Calibration.
Calibration Savvy. Calibration and Conformance  Calibration: Check a measurement against a known universally recognized standard to determine any deviation.
Measuring pressure. Conductivity, Temperature and Depth (CTD) Despite the name, all CTDs actually measure pressure, which is not quite the same thing.
Power Plant Construction and QA/QC Section 5.4 – Key Systems and Components Engineering Technology Division.
ODINBLACKSEA Meeting, Ostende October BULGARIAN ACADEMY OF SCIENCES INSTITUTE OF OCEANOLOGY BGODC 2010 BULGARIAN NATIONAL OCEANOGRAPHIC DATA.
INSTRUMENTATION NEEDS FOR THE CALIBRATION UNIT …AS A WORK DOCUMENT Pascale Keller KM3Net Meeting CPPM, january 2013 Inputs from : Miguel Ardid, Tassos.
S. Viola VLVνT 2015, Rome – 14/09/2015 Characterization and testing of the KM3NeT acoustic positioning system F. Simeone VLVνT 2015 – Rome, 14/09/2015.
Review of Positioning in ANTARES Dr. Lee F. Thompson Department of Physics and Astronomy University of Sheffield Special thanks to Vincent Bertin, CPPM.
Luciano Trasatti - VLVnT09 - Athens PORFIDO Physical Oceanography by RFID Outreach.
Calibration Methods and Tools for KM3NeT V. Kulikovskiy on behalf of the KM3NeT collaboration.
Salvatore Viola, INFN-LNS VLVνT 2011, Erlangen - October 12-14, 2011 Salvatore Viola 5th International Workshop on Very Large Volume Neutrino Telescopes.
KM3NeT Pylos meeting, April, 2007 Some preliminary studies for the positioning calibration of KM3NeT Miguel Ardid Universitat Politècnica de València.
Calibrating the first four IceCube strings Kurt Woschnagg, UCB L3 Detector Characterization IceCube Collaboration Meeting, Bartol, March 2004.
The ANTARES Project Sino-French workshop on the Dark Universe Stephanie Escoffier Centre de Physique des Particules de Marseille On behalf of the ANTARES.
Shipboard Technical Support (STS) Calibration Facility
NEMO-O DE NEMO First results from the NEMO Test Site G. Riccobene, for the NEMO Collaboration The NEMO Collaboration is performing the Phase 1 of the project,
Calibration of Under Water Neutrino Telescope ANTARES Garabed HALLADJIAN October 15 th, 2008 GDR Neutrino, CPPM, Marseille.
Acoustics in Phase IIG. Riccobene Oct. 17, 2012 NEMO Phase II Acoustic positioning system (or the “zombie”) FACTS: - Standard ACSA-LBL calibration procedure:
F. Simeone – University “Sapienza” and INFN Sec. Roma1RICAP 11 Conference Roma May 2011 The data acquisition and transport design for NEMO phase.
Simona Toscano In the frame of KM3NeT consortium VLV T workshop - Toulon, April 2008.
G. Larosa, M. Ardid (for the KM3NeT Consortium) Institut d’Investigació per a la Gestió Integrada de les Zones Costaneres - Universitat Politècnica de.
Status and Advances on the Acoustic Positioning System for KM3NeT Giuseppina Larosa, IGIC-UPV KM3NeT General Meeting, Nikhef 28-31/03/2011.
VLVNT’08 - ToulonM. Ardid – Positioning System of the ANTARES Neutrino Telescope Positioning system of the ANTARES Neutrino Telescope Miguel Ardid (IGIC.
The sector of the Antares line to be deployed in the NEMO site Davide Piombo – INFN sez. Genova
Acoustic transceivers for the KM3NeT positioning system Miguel Ardid KM3NeT General Meeting Marseille, January 29 – February 1, 2013.
ATM-900 Series Acoustic Telemetry Modems Introduction and Overview Communication Group: Justin Manley – Senior Director of Business Development Debbie.
Isabella Amore VLV T08, Toulon, France April 2008 International Workshop on a Very Large Volume Neutrino Telescope for the Mediterranean Sea Results.
LIDO Demonstration Mission (LIDO-DM) “LIstening to the Deep Ocean” The DM objectives are: geo-hazard and bio-acoustics LIDO-DM will operate a first nucleus.
Status of the LIDO East Sicily Station F.Bruni.
M. Circella – ANTARES connectionINFN Comm. II, 5/6/2008 The ANTARES Connection Marco Circella --- INFN Bari 1.
G. Riccobene, INFN-LNS Pylos - Km3Net General Meeting April 2007 G. Riccobene Acoustic positioning system for NEMO phase II.
Umberto Emanuele IFIC (CSIC-UV), Valencia (Spain) Status of Time Calibration System forKM3NeT.
Marseille 29 January 2013 Diego Real IFIC (CSIC – Universidad de Valencia) Instrumentation for Optical Calibration: Laser Beacon and Nanobeacon.
SEA operations – June 2012 Short summary report R. Papaleo 22 june 2012.
LNF NEMO group oceanografia Orlando Ciaffoni, Marco Cordelli, Roberto Habel, Agnese Martini, Luciano Trasatti SC CT 16/4/2013.
Giorgio Riccobene, LNS-INFN KM3NeT WPF/L Meeting, NIKHEF 5-7/07/2010 Status of the Acoustic Calibration System for KM3NeT.
Calibration and Instrumentation: Overview and General Issues Robert Lahmann WPFL meeting Amsterdam 6-July-2010.
Summary of Calibration and Instrumentation Session Robert Lahmann KM3NeT Collaboration Meeting, CPPM, 31-Jan-2013.
DOM developments Mini DOM PPM-DOM in Antares PPM future WP F-L.
Status of the NEMO tower validation Integration Tests Improvements Deployment program M.Anghinolfi- km3-day meeting )
CLB/DAQ meeting, Paris APC, 05 September DAQ in infrastructure and DU foot P. Lamare (CPPM)
Pre-Production Models for KM3NeT
PORFIDO Use neutrino telescopes infrastructure (power, communication)
PORFIDO Use neutrino telescopes infrastructure (power, communication)
Deep-sea neutrino telescopes
DOM acceptance and calibration
On behalf of Patrick Lamare
Interdisciplinary Activity ANTARES
T. Eberl for Robert Lahmann and the Erlangen acoustic group
M.Taiuti on behalf of the NEMO Collaboration
Overview of AMADEUS and Positioning for KM3NeT
Ocean Instrumentation
COM – LMGEM CPPM Tamburini C., Robert A., Fuda JL., Lefèvre D…
Stephen Farrington, PE (Transcend)
The Instrumentation Unit of The KM3NeT Calibration Unit
Nanobeacon: A low cost calibration instrument for KM3NeT
Presentation transcript:

Positioning system Hardware 2 hydrophones x (14 + 1 floors) = 30 x 9 towers = 270 hydrophones LBL transmitter x 1 floor x 9 towers = 9 transmitters Proposed Lay-out --- (Digital hydrophones) “Positioning” (low cost – 800 €) hydrophones on 13 floors = 187 k€ “Scientific” (2000 €) hydrophones on 2 floors = 36 k€ (including cables and connectors) “Positioning” preamplified hydrophones (-180 dB re 1V/uPa) “Scientific” preamplified hydrophones (-170 dB re 1V/uPa) LBL Transducers (low cost e.g. Sensor X30 - 500 €) x 9 towers = 3.5 k€ Acoustic emitter board (autocalibrating LBL-USBL R&D included) = 40 k€ Tests of LBL-USBL compatibility will start soon using PEGASO USBL (already discussed with M. Musumeci and K. Leismuller)

Positioning system Software /DAQ Signal recognition LBL autocalibration Hydrophone Triangulation Visualization Estmated cost : 50 k€ Shore DAQ, Computing & storage

Oceanographic instrumentaion Standard : CTD, transmissometers, Current meters, pressure gauge Proposal 1: Instrumentation line with 10 instruments 3 CTDs (1, 7,14), 3 Cstar (2, 8, 13), 3 DCS (3, 6,12) , 1 Pressurge gauge (tower base) Proposal 2: Instruments on 3 towers: PREFERRED Tower 1: 3 CTDs (1, 7,14) and 1 Pressurge gauge (tower base) + Oxygen sensor (verify) Tower 2: 3 Cstar (1, 7, 14) --- no: Check better instruments !!! Tower 3: 3 DCS (1, 7,14) ADCP Profiler - check Sound velocimeters – check Optode (on-board DCS) - check CTD SBE Microcat 37 DCS Aanderaa Cstar Absolute Pressure Gauge : Paroscientific

Oceanographic instrumentaion High space&time sampling : Porfido Proposal : 2 towers equipped with 1 “Porfido” system per floor (1 OM) Sensors: 1 (or 2) tower with high precision Thermometers 1 (or 0) tower with high precision pressure sensors LNF working on conductivity sensors (need strong R&D in my view) Other ?

Optical calibration instrumentaion Laser beacon and nano beacon Nanobeacon : Valencia available to start production Laser Beacon: New project from Valencia group (R&D). Valencia proposes 1 or 2 LB to be installed on tower bases.