Environmental Acquisition Strategy Performance-Based Contracting

Slides:



Advertisements
Similar presentations
Template: Making Effective Presentation about Your Evidence-based Health Promotion Program This template is intended for you to adapt to your own program.
Advertisements

DEQ Mission By the end of the decade, Virginians will enjoy cleaner water available for all uses, improved air quality that supports communities and ecosystems,
Water Quality Trading Claire Schary Water Quality Trading Coordinator U.S. Environmental Protection Agency, Region 10, Seattle, WA Region 10, Seattle,
Soldiers On Point for the Nation…On Point for the Environment Army Overhauls Cleanup Program Management Russ Marshall April 2004.
1 U.S. Army Corps of Engineers – Environmental Community 4/27/2015 USACE PERSPECTIVES ON CONTRACTING PROGRAMS FUDS FOCUS Robert F. Lubbert, P.E. 14 April.
2014 Federal Farm Bill Overview 3/14/14. Conservation Compliance 2 “Recoupling” federal crop insurance premium support benefits to HEL and wetland conservation.
Green Remediation An Overview of the State of the Practice
Small Projects & Tailoring Using the PPA 1:15 – 2:15 Teresa Kinley, OPHPR With Panelists: Susan Wilkin, NCCDPHP Andy Autry, NCBDDD Carol Waller, NCEH/ATSDR.
ENVIRONMENTAL MANAGEMENT PLAN
Adjusting EPLC to your Project Colleen Robinson & Teresa Kinley Friday, February 6, 2009.
Ch3. CP AND ENVIRONMENTAL MANAGEMENT SYSTEMS Course on Cleaner Production Middle East Technical University Department of Environmental Engineering Ankara.
RIB Launch 26 th March 2010 National Environmental Management: Waste Act.
Eric R. Johnson Hillsborough County, (Tampa) FL
 Materials – Highest & Best Use  Public Health  Safety  The Environment  Safety  Reliability  Performance  Flexibility  Productivity Improve Mobility.
1 Facilitating Reuse at RCRA Sites: Innovative Technologies for Groundwater Characterization and Cleanup Introduction Walter W. Kovalick Jr., Ph.D. Associate.
Click to edit Master title style Click to edit Master subtitle style PBC Lessons Learned A Contractor’s Perspective June 29, 2005 Tushar Talele ARCADIS.
Donald R. Rainey, Sr., CPPB/VCO Director, Office of General Services Virginia Department of Social Services.
© 2007 Noblis, Inc. Assessment of Performance-Based Contracting Presented to: 2007 REGION 4 ENVIRONMENTAL PROTECTION AGENCY / DEPARTMENT OF DEFENSE / STATES.
I n t e g r i t y - S e r v i c e - E x c e l l e n c e Headquarters U.S. Air Force Base Conversion Directorate Presented by Lt. Col. Daniel Welch AFCEE/BC.
Module N° 8 – SSP implementation plan. SSP – A structured approach Module 2 Basic safety management concepts Module 2 Basic safety management concepts.
Environmental Programs Update SAME Northern Virginia Post Monthly Meeting Rob Sadorra, MBA, M.Eng., P.E. Director, Environmental Restoration Division NAVFAC.
Project Management Learning Program 19 – 30 April 2010, Mekong Institute, Khon Kaen, Thailand Assumptions and Risk.
UNEP Training Resource ManualTopic 7 Slide 1 The purpose of mitigation is to: F find better ways of doing things F enhance environmental and social benefits.
Stuart A. Hazlett Deputy Director, OUSD(AT&L) Defense Pricing Defense Procurement and Acquisition Policy A Presentation to NCMA Pentagon 8 September 2011.
Integrated Risk Management Charles Yoe, PhD Institute for Water Resources 2009.
I n t e g r i t y - S e r v i c e - E x c e l l e n c e 1 Air Force Center for Environmental Excellence Dale Clark, AFCEE/ICC Air Force Center for Environmental.
2 2 Eleanor Spector Vice President, Contracts Lockheed Martin Corporation August 5, :30-10:15AM Industry Acquisition Issues.
Wildlife Program Amendments CBFWA Members Meeting – Sept
Module 6: Alternatives. 2  Module 6 contains three sections: – 6.1 Development and Screening of Alternatives – 6.2 Detailed Analysis of Alternatives.
1 Joseph P. Nicolette, Vice President, CH2MHILL Keith Hutcheson, Associate, Marstel-Day, Inc. April 8, 2004 Use of a Net Environmental Benefits Analysis.
Presented by Michael W. Sydow, PE Chief, Environmental and IIS Management Branch USAED Savannah Performance Based Contracting A USACE Perspective.
Tools and Techniques for Project Portfolio Management Jon Lewis - Director, Ninth Wave.
Greener Cleanups in the Region 10 PCB Program Michelle, Mullin R10 PCB Coordinator Clu-In Webinar November 17, 2015.
ORDER ENVIRONMENTAL PROTECTION PROGRAM WORKSHOP OVERVIEW OF ORDER Larry Stirling
Project Management Strategies Hidden in the CMMI Rick Hefner, Northrop Grumman CMMI Technology Conference & User Group November.
I n t e g r i t y - S e r v i c e - E x c e l l e n c e Headquarters U.S. Air Force The Air Force Military Munitions Response Program For: Mr. William.
Small Business and Subcontracting. Subcontracting for Small Business 6 steps to successful subcontracting 6. Report Contractor performance 1. Consider.
Contracting Officer Podcast Slides
Meeting Present and Emerging Strategic Human Resource Challenges
Restoration and Regulation Discussion
An Overview on Risk Management
Access to Information, Participation in Decision-Making and Justice in the OECS: some thoughts Peter A. Murray OECS Secretariat.
Commercial Item Acquisitions: A Brief Update
Post Award Peer Review Briefing Slides
Monitoring and Evaluation Systems for NARS organizations in Papua New Guinea Day 4. Session 12. Risk Management.
European Commission “Intelligent Energy for Europe”
Restoration and Regulation Discussion
Improving Community Safety through procurement practice and process Tim Oakley Head of Consultancy Trusted procurement for better buildings and homes.
Small Business and Subcontracting.
CMMI Overview.
Alternate Acquisition
Federal Acquisition Service
Transformation of The AF Programs to Performance Based Management
Sacramento County Stormwater Quality Program
URBAN STREAM REHABILITATION
Design-Build Acquisition and Contract Incentives July 19, 2018
Performance Based Contracts
“Solid Waste Management: Line Item Expense or Resource Management“
Delta Water Supply Project
PRE-QUALIFIED AND PREFERRED SUPPLIER PROGRAM
Part III: Strategy in Action
Georgia Environmental Protection Division
Performance Based Contracting A USACE Perspective
Design-Build Acquisition and Contract Incentives May 9, 2019
Restoration and Regulation Discussion
Sacramento County Stormwater Quality Program
Financial Control Measures
Post Award Peer Review Briefing Slides
National Waterways Conference
Presentation transcript:

Environmental Acquisition Strategy Performance-Based Contracting

AGENDA PERFORMANCE-BASED CONTRACTING (PBC) NAVFAC PBC EXPERIENCE ACQUISITION BUILDING BLOCKS AND WORKLOAD PLAN ENVIRONMENTAL ACQUISITION TRANSFORMATION ACQUISTION STRATEGY EXECUTION CONCERNS SUMMARY WAY AHEAD

Performance-Based Contracting (PBC) What is PBC? Structuring all aspects of an acquisition around the purpose of the work to be performed. PBC actions (task order) describe “what” is required (expected outcome) and places the responsibility on the contractor for determining “how” to deliver or meet the desired outcome on the contractor.

Performance-Based Contracting (PBC) Each PBC action need to include: Performance Objectives (task): Define the work in measurable outcome, mission related terms. Performance Standards: Define what is acceptable (quality, quantity and timeliness) tied to performance objectives Performance Assessment Plan or Quality Assurance Plan: Identifies acceptable quality levels for the objectives. Describes how performance will be measured. Incentives: Addresses how to manage performance that does or does not meet objectives. Performance Requirements Matrix: Documents in a summary table all the performance objectives, standards, assessments and incentives developed for a proposed contract action.

Performance-Based Contracting (PBC) NAVFAC issued specific PBC guidelines on 26 Oct 04 : PBC eligibility (applies to non-Brooks Bill work only) Responsibilities and level of approval Directs increased use of PBC Training the workforce Explains the elements of PBC Established reporting requirements PBC is incorporated in our Acquisition Strategy. It is a tool in our approach to execute the program. It is to be used where it makes sense. The majority of our contract tools can have PBC components. DoD IG Research Project identifies PBC as an area of future audit interest.

Performance Base Contracting (PBC) PBC Concerns Perception that PBC equates to Guaranteed Fixed Price (GFP) and GFP not necessarily in line with Management Guidance (worst first) At IR sites that are not well characterized you will pay for the uncertainties related to unforeseen conditions. Arbitrary PBC goals may have unintended consequences for the program.

Performance Base Contracting (PBC) Indications are PBC strategies may lead to more cost effective acquisitions, better value and greater competition. NAVFAC has been using PBC techniques since 1999; however, not all the elements were present in our contract actions, some PBC examples include: Charleston Naval Base. Combination of real estate transfer and environmental cleanup. Kings Bay. Chemical Oxidation in landfill hot spots, we established targets for reduction of contaminant levels. Whiting Field. Milestones established for achieving certain contaminants reductions with a one year funding hold back to insure desired outcome. Stockton and Mare Island, CA: Environmental Service Cooperative Agreement which is a combination of Guaranteed Fixed Price with Performance Base Contracting. The contractor assumes all responsibility for the action Cost Plus Remediation Contracts Navy wide. We move select remediation efforts from a completed EECA which sometimes is less than 35% drawings and specs and move forward with a remedial action.

Execution Plan Building Blocks Annual Plan Controlling Factors: Funding controls (ER,N) Amount of Reimbursable work (Compliance and BRAC) Ability to contract work Cleanup goals (ER,N) % Cleanup vs Study % High risk Use small amount to fund MED/LOW priority if it will close an installation (ER,N) Reuse Priority and completing installation (BRAC) Economy of Scale 1. There is an optional slide on relative risk site evaluations at the end of the brief that can be used if the RAB has not been briefed or needs a quick refresher on relative risk evaluations. 2. ER,N clean up Goal is 70% of project targets. 3. Percentage of high relative risk ER,N project site cost is 80% project target for FY97 and 70% FY98 and out.

ENVIRONMENTAL ACQUISITION STRATEGY EXECUTION 2005 Environmental Acquisition Strategy Objectives Continue emphasizing Small Business participation Establishes Command base-line for Small Business goals @ 40% Increase use of fixed priced contracts Encourages Environmental Multiple Award Remedial Action Contracts Considered suitable for work such as UST/AST, Asbestos and LBP Removal, Site Restoration, Monitoring Well Abandonment, Well-defined excavation and soils disposal, Remedial Action Operations/Long-Term Maintenance Work, Transportation and Disposal. Increase use of performance-based contracting strategies Promotes innovative technologies in contract work Expedite close-out of contract task orders Reduces high levels of unexpended funds Meet Legislative and DoD requirements Limits on large business IDIQs (>$130M)

Summary We have changed our acquisition strategy to adapt to new polices and the evolving nature of the program. We have a variety of tools available to address environmental requirements and flexibility to surge if needed. PBC initiatives have been incorporated in our strategy. Concern that a push for a mandatory PBC goal may have an unintended negative impact on program execution

Way Ahead Looking at innovative contract mechanisms that provide quality service at a lower cost and close sites quickly. Performance Environmental Restoration Multiple Award Contract (PERMAC): combine design and construction under a fixed price contract. Looking at emphasizing incentives within the performance base framework with our fixed price and cost plus contracts.