Liaison Report from Date: July 16, 2015 July 2015 Month Year

Slides:



Advertisements
Similar presentations
Doc.: IEEE Submission July 2007 John Notor, Cadence Design Systems, Inc.Slide 1 Overview of FCC ET FNPRM ISM Band Spectrum.
Advertisements

Doc.: 18-12/0022 Submission March 2012 MJ Lynch & Associates LLCSlide 1 RR-TAG Opening Report Notice: This document has been prepared to assist IEEE
Doc.: 18-13/0093r1 Submission July, 2013 Michael Lynch, MJ Lynch & Associates LLCSlide 1 RR-TAG Closing Report Notice: This document has been prepared.
Submission doc.: IEEE /XXXXr0 Month Year John Doe, Some CompanySlide 1 Insert Presentation Title Here Date: YYYY-MM-DD Authors: Notice: This document.
Submission doc.: IEEE /0089r1 January 2015 Steve Shellhammer, QualcommSlide 1 3GPP LAA Liaison Approval Process Date: Authors: Notice:
Doc.: IEEE /0732r0 Liaison July 2015 Rich Kennedy, MediaTekSlide 1 RR-TAG (802.18) to Liaison Report Date: Authors:
Doc.: 18-12/108r0 Submission October 26, 2012 Slide 1 FCC TV Band Incentive Auction: Impact on Unlicensed Operation Notice: This document has been prepared.
Doc.: IEEE /0014r0 & /0425r0 Submission March 2007 Rich Kennedy, OakTree WirelessSlide 1 RR-TAG Liaison Report Mar07 IEEE
Doc.: 18-14/0078 Submission November, 2014 Michael Lynch, MJ Lynch & Associates LLCSlide 1 RR-TAG Closing Report Notice: This document has been prepared.
Doc.: 15-16/0109r00 Submission Liaison Report from Date: 21 January, 2016 January 2016 Jay Holcomb, Itron, Inc.Slide 1 Notice: This document has.
Doc.: IEEE /0047r0 Submission March 2012 Reinhard Gloger, Nokia Siemens NetworksSlide Liaison Report Notice: This document has been prepared.
Doc.: 18-15/0043 Submission July 17 th, 2015 Michael Lynch, MJ Lynch & Associates LLCSlide 1 RR-TAG Closing Report Notice: This document has been prepared.
Doc.: 18-15/0034 Submission July, 2015 Michael Lynch, MJ Lynch & Associates LLCSlide 1 RR-TAG Opening Report Notice: This document has been prepared to.
Doc.: IEEE /0185r0 Submission September 2012 Prabodh Varshney, NokiaSlide af Liaison Report Notice: This document has been prepared to.
Doc.: IEEE RR-TAG_Nov05_Liaison_Report.ppt Submission November 2005 Peter Murray, MotorolaSlide 1 RR-TAG Liaison Report IEEE
Sept 2017 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Liaison Report on for July 2017] Date.
RR-TAG Liaison Report May 2007 IEEE
September 2015 Opening Report
Nov 2017 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Liaison Report on for July 2017] Date.
IEEE Liaison Report to IEEE
March 2018 Project: IEEE P Working Group for Wireless Specialized Networks (WSNs) Submission Title: [Liaison Report on for March 2018] Date.
November 18 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: TG4d Closing Report for Hawaii July 2007.
January 2018 Project: IEEE P Working Group for Wireless Specialized Networks (WSNs) Submission Title: [Liaison Report on for Jan 2018] Date.
July 2015 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: IG THz Waikoloa July 2015 Closing Plenary Slides.
March 2017 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Liaison Report on for March 2017]
RR-TAG Liaison Report IEEE
July 2017 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Liaison Report on for July 2017] Date.
May 2018 Interim Project: IEEE P Working Group for Wireless Specialized Networks (WSNs) Submission Title: [Liaison Report on for March 2018]
March 2016 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Liaison Report on for Mar 2016] Date.
doc.: IEEE <doc#>check
July 2016 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Liaison Report on for July 2016] Date.
Auto SG July 2016 Opening Report
IEEE (RR-TAG) Liaison Report
Liaison Report from Date: September 20, 2012 September 2012
IEEE (RR-TAG) Liaison Report
Radio Resource Measurement for TVWS application under FCC rules
Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title:[SG-PSC Closing Report] Date Submitted: [May.
September 2016 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Liaison Report on for September.
November 2016 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Liaison Report on for November.
September, 2015 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [TG4s Closing Report for September 2015]
RR-TAG Liaison Report IEEE
Liaison from to Date: 13May2017 July 2017 Name
November 2014 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: TG3d San Antonio 2014 Closing Plenary.
Auto SG July 2016 Closing Report
WAC SG November 2016 Opening Report
EC Motions – November 2005 Plenary
March 2010 doc.: IEEE /0194r0 March 2010
Jul 12, /12/10 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: TG4n Chinese Medical Band Closing.
July 2008 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: FCC Comments Supporting MBANS ET Docket
November 2018 Opening Report
July 2014 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: TG3d San Diego July 2014 Closing Plenary Slides.
RR-TAG (802.18) to Liaison Report
RR-TAG Liaison Report Mar07 IEEE
Submission Title: [WG-RR TAG Liaison Report January08]
RR-TAG Liaison Report IEEE
March 2019 Liaison Report Date: Authors: March 2019
RR-TAG Opening Report Date: November 8, 2015 Authors: March, 2016
<month year> doc.: IEEE <030158r0> <March 2003>
RR-TAG Liaison Report IEEE
RR-TAG Liaison Report IEEE
802.11af Liaison Report Date: Authors: January 2013
September 2014 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: TG3d Athens September 2014 Closing Plenary.
RR-TAG Liaison Report IEEE
RR-TAG Liaison Report Jan07 IEEE
Comments to IEEE /68 Date: Authors: September 2009
January 2015 Opening Report
January 2015 Opening Report
RR-TAG Liaison Report IEEE
Jan 2008 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: TeraHertz Closing Report Date Submitted: January.
November 2014 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: IG THz San Antonio November 2014 Closing.
Presentation transcript:

Liaison Report from 802.18 Date: July 16, 2015 July 2015 Month Year doc.: 15-13/0083r0 July 2015 Liaison Report from 802.18 Date: July 16, 2015 Notice: This document has been prepared to assist IEEE 802.15. It is offered as a basis for discussion and is not binding on the contributing individual(s) or organization(s). The material in this document is subject to change in form and content after further study. The contributor(s) reserve(s) the right to add, amend or withdraw material contained herein. John Notor, Notor Research John Doe, Some Company

July 2015 Overview This document summarizes the activities of the IEEE 802.18 Radio Regulatory Technical Advisory Group (RR-TAG) during the IEEE 802 July 2015 Plenary Meeting at the Hilton Waikoloa, Waikoloa Beach, Big Island, HI. John Notor, Notor Research

Documents Reviewed/Discussed (1/2) July 2015 Documents Reviewed/Discussed (1/2) Review of PARs Due to the limited number of .18 meetings scheduled because of meeting room availability, 802.18 did not undertake a formal review of PARs for this meeting. 18-14/0048r02; status on comments on draft new recommendation ITU-R M.[V2X] and ITU submission process. 18-15/0028r00: FCC NPRM: AMENDMENT OF PARTS 15, 73 AND 74 of the FCC rules for the preservation of one vacant TV band channel for wireless mics and TVWS devices. There was discussion about preparing an 802 submission to this proceeding, but, given the limited time frame (comments due August 3) and the limited number of 802.18 meetings scheduled for the July plenary, no action was taken. 18-15/0029r00: NCTA to FCC: LTE-U Will Gravely Harm Wi-Fi; ET Docket No. 15-105. 18-15/0030r00: “Technology trends of active services in the band above 275 GHz” from ITU-R WP 1A. John Notor, Notor Research

Documents Reviewed/Discussed (2/2) July 2015 Documents Reviewed/Discussed (2/2) 18-15/0032r00: Review latest version of the work going on in ITU-R WP1A on ITU-R SM.[SMART_GRID] (Question 236). 802.18 circulated the latest version of the draft report to the Chairs of 802.11, 802.15, and 802.24 asking if there was interest in further editing the document. 802.24 responded with interest. 18-15/0033r00: Study on Question ITU-R 210-3/1 “Wireless power transmission. 802.18 contacted EC chairs to see if there was any interest in responding to this document. 802.19 responded with possible interest. 18-15/0035r00: National experience on the implementation of the digital dividend in Brazil. 18-15/0036r00: FCC: Chanel sharing by full power/class A stations outside the broadcast television spectrum incentive auction context. 18-15/0037/39r00: Comment Deadlines Set in Further Citizens Broadband Radio Service Rulemaking, SFNPRM Proceeding No. 12-354 - 3550-3650. John Notor, Notor Research

FCC Documents Approved July 2015 FCC Documents Approved No documents for submission to the FCC were created. John Notor, Notor Research

ITU-R Documents Approved July 2015 ITU-R Documents Approved No documents for submission to ITU-R were created. John Notor, Notor Research

July 2015 802.18 Meeting Close The RR-TAG adjourned in AM2 on Thursday. The next face to face meeting of the RR-TAG will be at the September 2015 Plenary Meeting at the Centara Grand Hotel, Bangkok. John Notor, Notor Research