Traffic Management System Real Time Motorist Information

Slides:



Advertisements
Similar presentations
Gainesville ATMS: A Regional Success! October 29, 2012 Matthew Weisman, PE ITS Operations Engineer - City of Gainesville, Fl 2012 Transpo – Bonita Springs.
Advertisements

Statewide Construction Database (SCD) Florida Department of Transportation Production Management Office June 29, 2006.
Alachua County BoCC Meeting November 8, Project Background and Location Study Purpose Study Activities Bridge Alternatives Evaluation Schedule.
Hillsborough County Metropolitan Planning Commission (MPO) Prepared for: Prepared by: Intelligent Transportation Systems Committee November 17, 2011 URS.
Transportation Operations Master Plan John Ward ITS-Pennsylvania Panel Discussion Vision for Achieving Regional Mobility through ITS November 23, 2010.
Background Why Plan For Transportation? Facts You Should Know Expectations Projects and Costs Conclusions/ Next Steps.
AVONDALE ROAD ITS 2006 COUNTYWIDE GRANT. AVONDALE ROAD ITS OVERVIEW OVERVIEW Location Location Avondale Road between Novelty Hill Road and NE 132 nd St.
Presented by: SAGE KAMIYA, P.E., PTOE
State of Florida Department of Transportation SR 7 (US 441) Value Engineering Study September 24-28, 2001 Segment III - From North of Hollywood Blvd to.
Board of County Commissioners November 8, Recommendation Project Background and Location Traffic Analysis Comparison of Alternatives Public Meeting.
The North Carolina Department of Transportation. An 11.5-mile stretch of a major highway in Raleigh is in dire need of repair after a construction problem.
1 Integrating personal and public transport information Fred Gangemi, Steer Davies Gleave June 21 th 2012.
Travel Options Online Trip Planner For Statewide Mobility Paula Hammond, P.E. Secretary Washington State Department of Transportation Kathryn Taylor Director.
Green Light-Go Program Pennsylvania’s Municipal Signal Partnership Program April 7, 2015 Daniel Farley Chief, Traffic Signal and Arterial Management Section.
Gainesville Area Traffic Management System. Traffic Management System  In 1984, the original Traffic Signal Master Plan was developed for the Gainesville.
ICM San Antonio – IH-10 Corridor Brian Fariello, TxDOT.
ICM Minnesota – Interstate 394 Brian Kary, Minnesota Department of Transportation.
Presentation to the Orange County-City of Orlando Consolidation of Services Study Commission Transportation Committee Meeting September 8, 2005.
ITS America 2005 Enhanced Transit Information CIN RTO Consumer Information Network Regional Transit Organization Presented by: Jesus A. Martinez, P.E.
Rapid Transit Investment Plan David Armijo, CEO March 19, 2010.
GROWTH MANAGEMENT Working With Transportation Concurrency Management Systems Florida Department of Transportation Companion to the Booklet “Working with.
From Planning to Pouring: The Evolution of Safe Routes to School Julie Walcoff, Ohio DOT, Columbus, OH Alex Smith, Columbus Public Health, Columbus, OH.
TSM&O FLORIDA’S STATEWIDE IMPLEMENTATION Elizabeth Birriel, PEElizabeth Birriel, PE Florida Department of TransportationFlorida Department of TransportationTranspo2012.
Department of Transportation Transit Rebranding New Brand Identity City Council November 4, 2013.
Broward Complete Streets Technical Advisory Committee (TAC) Meeting Monday August 10, 2015.
California’s Strategic Growth Plan Ken De Crescenzo Federal Liaison California Department of Transportation.
Florida Department Of Transportation District IV Office of Modal Development Commuter Choices 2004 Summit 2004 Summit.
Southeast Michigan Council of Governments. Working Together to Improve Regional Operations through Traffic Incident Management Working Together to Improve.
Tom Norton, Executive Director Colorado Department of Transportation American Association of State Highway and Transportation Officials September 9, 2003.
Cellular Probes Kansas City Evaluation Cellular Probe Feasibility Study Cellular Probe Feasibility Study.
Orange County Traffic Signal System Consolidation of Services Study Commission Meeting September 8, 2005.
A partnership between DCF Circuit 8 and The Alachua County Board of County Commissioners December 2008-August 2009 Project Final Report.
Calgary, Cochrane, CRAZ. Why?Why?  Estimated 16 million cars on the road in Canada  Of these 80 percent occupied only by their driver  Estimated 30,000,000.
ALACHUA COUNTY TRANSPORTATION PRIORITIES FOR FLORIDA DEPARTMENT OF TRANSPORTATION WORK PROGRAM Fiscal Year 2010/11 – 2014/15 Presentation to Board of County.
ZOM A request for a minor amendment to the existing South Pointe PD (Planned Development) 110 acres West Newberry Road.
Bay County’s Intelligent Transportation System (ITS) Keith C. Bryant, P.E., PTOE Public Works Director Bay County, FL 2015 TRANSPORTATION SYMPOSIUM November.
Florida’s First Eco-Sustainable City. 80,000+ Residential Units 10 million s.f. Non-Residential 20 Schools International Clean Technology Center Multi-Modal.
City of Palm Coast - Flagler County Association of Realtors Home for the Holidays Special Event CITY COUNCIL BUSINESS MEETING NOVEMBER 3, 2015.
1 Florida Department of Transportation ITS Performance Measures Breakout Session 2 – Elizabeth Birriel, P.E.
Traffic Management System Status Update February, 2008.
MetroPlan Orlando Board Meeting Agenda Briefing Board of County Commissioners February 10, 2016.
1 MPO Public Involvement Efforts During 2012 Presented to the: CMS/ITS on January 16, 2013 PAC on January 25, 2013 TAC on January 28, 2013 CAC on January.
Safer Work Zones Through ITS Interim Traffic Management System Florida Department of Transportation Tahira Faquir.
Internet Marketing Agency – Website Design and SEO Company
POINCIANA PARKWAY TPO BOARD MEETING APRIL 12, 2012.
A Partner For Growth.
Integrating Transit and Highway Solutions In High Volume Corridors
Citizens Academy 2016 Public Works and RTS.
Traffic Signal Data Sharing to Support Automated Vehicle Applications
Nevada Next Generation 511 System 9 months to design, test and deploy
Project Overview – Phase 1
S.R. 30A / U.S. 98 / Panama City Beach Parkway
Proposed Medicaid Hospital Outpatient Prospective Payment System
Project Status & Right-of-Way Acquisition
Helping you make smarter travel choices
PROJECT LOCATION Project begins at Garden Lane (East of I-4)
Intelligent Transportation Society of Virginia: The Next Generation VDOT’s New 511 Traffic Information Program Transportation Video & Data (TVD) Status.
GUARANTEED ENERGY SAVINGS Performance Contracting
Transportation Research Board 2004 Annual Meeting
2018 Adopted Budget February Financial Plan
State Transportation Bond Funds
Fortify: The I-40/440 Rebuild Project
Transportation Task Force Mission and Vision
STP Shared Local Fund: Project Evaluation Criteria
ITE Midwestern District Conference June 20, 2017
Technology In Action Session: An On-Demand Sunday Transit Application
State Transportation Bond Funds
North-South Corridor Bus Rapid Transit Project
State Transportation Bond Funds
Broward County & South Florida Commuter Services Partnering to change how people travel and help reduce fuel usage 20% by 2020.
Presentation transcript:

Traffic Management System Real Time Motorist Information Public Works Department Traffic Management System Real Time Motorist Information

Traffic Management System 4 Agency Partnership

Funding Partnerships Local Funding Methodology: City, County, MTPO, FDOT and University Staff worked together to develop a funding methodology for this project. The methodology is similar in nature to FDOT’s for funding traffic signal maintenance. The intersection is broken down by the ownership of each approach to the traffic signal. If the county owns 2 approaches and the city owns 2, each agency pays for 50% of the improvements at that intersection.

Funding Partnerships The University of Florida pays their fair share based upon ownership and trip generation surrounding the campus. The University of Florida’s fair share was subtracted from the total and the “fair share” percentages applied to the whole.

Funding Commitments Agency City County U.F. FDOT Committed $ 3.1 mil

Funding Partnerships Transportation Regional Improvement Plan (TRIP) On February 1, 2007, the Regional Transportation Partners (Alachua MTPO and Marion County MPO) approved and adopted the Regional Transportation Plan Application was made to FDOT for TRIP program funding for the maximum 50% match. On November 29, 2007, FDOT executed the TRIP Agreement and awarded funding at the full 50% of total cost ~$9.1 million.

Phasing Costs Phase I Phase II Phase III Phase IV Total $ 7.5 million $ 820,000 $ 18.2 million Note: In 2006 Dollars

Phase I

Phase II

Phase III

Phase IV

Traffic Management Center The Traffic Management Center is now on-line:

Traffic Management Center With the Traffic Management Center on-line and the roadway corridors on-line, it is necessary to provide public access to the TMS and real time information to motorists. The Public Works Department has developed a series of items to provide this information including a brand to tie it all together.

TMS Brand / Logo

Real Time Information We have developed a webpage for motorists to utilize to get real time information: www.gac-smartraffic.com We have created a twitter account: @GACSmarttraffic You can “like us” on facebook by searching: Gainesville / Alachua County Smartraffic

Real Time Information Via the website, twitter or facebook, motorists will be able to get real time traffic information either from the pc or from their smart phone. If there is a long term incident, such as the Williston Road & I-75 Overpass, incident, we will post that with details on our webpage. If it is a real time incident, we will post on twitter and facebook. Then re-post when the issue is resolved.

Website

Real Time Info - Actual

Marketing Campaign We have developed a marketing campaign to help get the word out to the public regarding the our project and the public access points. In order for the real-time information to have an impact, there has to be real time users. This will help reduce congestion and delay during an event or incident.

Coming Attractions Web application with a real time corridor map with travel time information; In route real time travel time and incident information on major corridors; Mobile web-site for smart phones;

Questions? www.gac-smartraffic.com