National Hydrology Project (NHP) NATIONAL INSTITUTE OF HYDROLOGY

Slides:



Advertisements
Similar presentations
EU funds’ evaluation plan , Latvia
Advertisements

PUBLIC SECTOR INTERNAL AUDIT IN THE REPUBLIC OF LITHUANIA Mr. Jonas Vaitkevičius Head of Internal Audit and Financial Control Methodology and Monitoring.
KA2 – Cooperation for innovation and the exchange of good practices Capacity Building in the field of Higher Education (CBHE) Application and selection.
Capacity Building Capacity building for financial Management Integral part for effective and efficient functioning of Financial Management Unit. Needs.
A WORKSHOP ON FINANCIAL MANAGEMENT IN HYDROLOGY PROJECT – PHASE-II Gujarat Water Resources Development Corporation Ltd. GWRDCGANDHINAGAR (GW Component.
The Issues of Budgetary Reform Unit 3. PFM Reform – Change Management Module 3.2. Preparing and managing a reform programme.
© HAUS The 2013 International Conference on Human Resource Development in the Public Sector - Leading Change & Quality Training Date 7-8 October 2013 Changes.
Session 13 CPIP Formulation Process Project for Capacity Development for Implementing the Organic Law at the Capital and Provincial Level (PILAC 2)
Session 17 Structure of the CPIP Book Project for Capacity Development for the Implementing the Organic Law at the Capital and Provincial Level (PILAC.
Human Resources Development Project for Water Supply Phase 2.
Financial Management Practices in Hydrology Project - I An Overview Central Ground Water Board.
National Hydrology Project Central Ground Water Board WB Mission: 1-15 September
NATIONAL INSTITUTE OF HYDROLOGY ROORKEE Sept. 14, 2015 NEW DELHI.
Year wise Budget Provision and Expenditure (R&D Division) Rs. in cr. YearBEREExpenditure (till Dec)
STATUS REPORT ON WA TASK DESCRIPTION: “Organize workshops on water observations, encompassing space-based, airborne, and in-situ observing systems,
SMS Planning.  Safety management addresses all of the operational activities of the entire organization.  The four (4) components of an SMS are: 1)
ASSOCIATION OF FINNISH LOCAL AND REGIONAL AUTHORITIES (AFLRA) NORTH-SOUTH LOCAL GOVERNMENT CO-OPERATION PROGRAMME BASIC COURSE MARCH 2009.
Central Water and Power Research Station Pune
Content of this presentation What is the ERA? What is the aim of the ERA? What does the ERA? What can the ERA do for you? Why the needs analysis? How the.
National Hydrology Project The Way Forward Dr. Amit Prasad 15 th September, 2015, New Delhi.
Consultant Advance Research Team. Outline UNDERSTANDING M&E DATA NEEDS PEOPLE, PARTNERSHIP AND PLANNING 1.Organizational structures with HIV M&E functions.
July 2007 National Quality Assurance and Accreditation Committee & Quality Assurance and Accreditation Project Role of Action Planning in The Developmental.
DESCRIPTION OF THE MONITORING AND EVALUATION SYSTEM IN POLAND Action Plan and the Two-year NRN Operational Plans.
Setting up your project for success Afternoon session.
Implementation of PRTRs as a tool for POPs reporting, dissemination and awareness raising Steering Committee meeting Madrid November 26.
THE INTRODUCTION AND SUPPORT OF RESEARCH PROJECTS AS PART OF THE FUTURE ROLE OF THE RCARO Dr Waqar Ahmad Dr John Easey.
National Hydrology Project Orientation Workshop 9 th May, 2016, New Delhi.
PFM reform – change management Module 3.2 Preparing and managing a PFM reform programme 1.
PUBLIC FINANCE IN THE REPUBLIC OF MOLDOVA: REFORMS AND THE DEVELOPMENT STRATEGY PLENARY SESSION OF THE TREASURY COMMUNITY OF PRACTICE JUNE 1-3, 2015, KISHINEV,
Monitoring and Evaluation Systems for NARS Organizations in Papua New Guinea Day 5. Session 14. Work Plan and Budget for M&E.
1 LAW On Public Finance and Budget and Tax Responsibility; Competences and Roles of Participants of the Budget Process # 181, of July 25, Plenary.
THE INTRODUCTION AND SUPPORT OF RESEARCH PROJECTS AS PART OF THE FUTURE ROLE OF THE RCARO Dr Waqar Ahmad Dr John Easey.
MSCOA Budget for Projects 11:30-13:00 Presented by National Treasury – 16 March 2016.
National Hydrology Project Dr
“Delivering as One” through Joint Programming and Joint Programmes
GOVERNMENT OF TELANGANA Irrigation & CAD Department
National Hydrology Project
SPMU Details Sl. No. Post under NHP Name Designation 1.
Geo-spatial Products, Services and Applications
NHP National Hydrology Project Surface Water CHHATTISGARH.
SCOA for Municipalities:
Introduction/Background Aim of the assessment was to assess the impact of the 3 institutions MOHCDGEC, PO-RALG and MOFP in the flow of funds from national.
Improved Regional Statistics in the Republic of Moldova
NATIONAL HYDROLOGY PROJECT
National Hydrology Project
Ministry of Water Resources, River Development and Ganga Rejuvenation
Implementation Arrangement under National Hydrology Project
Public Expenditure Management Peer Assisted Learning
National Hydrology Project
Global Forest Observations Initiative - GFOI
SCOA for Municipalities:
National Hydrology Project
GROUNDWATER DEPARTMENT - KERALA
National Hydrology Project
BHAKRA BEAS MANAGEMENT BOARD
mSCOA Budget for Projects 11:30-13:00
Details of SPMU (in position), Staff Strength etc
1st World Bank Mission under the National Hydrology Project
Status of Odisha Surface Water under NATIONAL HYDROLOGY PROJECT
The role of the Passport Indicators in Monitoring PFM Strategy
Sybi Hida ALBANIA February, 2005
UNECE/EFTA/Eurostat workshop
Sybi Hida ALBANIA February, 2005
NATIONAL HYDROLOGY PROJECT
Helene Skikos DG Education and Culture
Home Affairs Programme in Bulgaria: From Development to Actual Implementation Cooperation Committee Meeting 28 November
EXPERIENCE OF MANAGING RESEARCH FUNDS
5.b3 Monitoring & Reporting 2019
ICDS Systems Strengthening and Nutrition Improvement Project
Portfolio Committee on Communications
Presentation transcript:

National Hydrology Project (NHP) NATIONAL INSTITUTE OF HYDROLOGY ROORKEE

ROLE OF NIH IN NHP NIH is assigned with the following tasks in NHP: Planning and organising training programmes for capacity building of the Implementing Agencies (IAs). Purpose Driven Support (PDS): Initiation, Review and Monitoring. Centre of Excellence in Hydrological Modelling

Project Management Unit (PMU) at NIH Dr. Sharad K Jain, Director Project Coordinator Dr. Sanjay K Jain, Sc. ’G’ Nodal Officer Er. C P Kumar, Sc. ‘G’ PDS Coordinator Dr. A K Lohani, Sc. ’G’ Training Coordinator R&D Section Dr. Anupma Sharma, Sc. ‘D’, Dr. M K Sharma, Sc. ‘D’, Dr. R Thayyen, Sc. ‘D’, Mr. P K Agarwal Sc. ‘B’, Mr. Naresh Kumar, Sc. ‘B’ Training Section: Dr. Sumant Kumar, Sc. ‘C’, Dr. L N Thakural Sc. ‘C’, Dr. Ashwini Ranade Sc. ‘C’, Mr. Prabhash Mishra Sc. ‘B’, and Dr. Gopal Krishna, Mr. Manoj K Goel Center for Excellence in Hydrological Modelling Dr N C Ghosh, Sc. ‘G’, Dr Anupma Sharma, Sc. ’D’ M&E Section Mrs. Deepa Chalisgaonkar Sc. ‘F’, Mrs. Suman Gurjar Sc. ‘C’ Procurement Section Dr. Surjeet Singh Sc. ’D’, Mr. Manish Nema, Sc. ’C’ Finance Section Mr. S S Lamba, Finance Officer, Mr. Rajneesh Goel, Section Officer

FUNDS RECEIVED AND EXPENDITURE Fund received 2016-17 : Rs. 2,88,80,000 Expenditure : Rs. 1,00,82,399 Fund received 2017-18 : Rs. 3,14,00,000 Expenditure : Rs. 10,46,411

Equipments Approved (2017-18) Revised Equipments to be Approved MAJOR PROCUREMENT 2016-17 and 2017-18 The procumbent of equipments were proposed under annual work plan and approved under component A for the year 2016-17 and 2017-18. For the year 2016-17 the equipments were proposed for three labs. (no list was provided), while for the year 2017-2018, the list and cost of the approved equipments for three labs of NIH are given in the table below.   Total budget for the year 2016-17 and 2017-18 is Rs. 4.2 crore. The revised budget for the two years is same i.e. Rs. 4.2 Crore. Equipments Approved (2017-18) Total Budget (Crore) Revised Equipments to be Approved HYDROLOGICAL INVESTIGATION (HI) LAB Dual Carbon C13 Isotope analyser 1.0 Element Analyser (CNS) Tritium Enrichment Unit Normal Scintillation Counter Liquid Nitrogen Plant 0.50 0.20

Revised Equipments to be Approved MAJOR PROCUREMENT 2016-17 and 2017-18 Equipments Approved Total Budget (Crore) Revised Equipments to be Approved SOIL WATER LAB. Ion Chromatograph with auto sampler and necessary accessories, CHNS analyzer with biomass converter, Millipore water system (ultrapure), Air Pycnometer, Microwave digester, Tension Infiltrometer : 6 nos 1.00 Same, no change 1.0 WQ LAB. Gas Chromatograph Mass Spectrophotometer GCMS 0.70 GC-MS Dedicated Auto Titrator TOC Analyzer 0.40 For HI, WQ and Soil Water Lab. for the year 2016-17 1.50

NIH Nodal Agency for training needs Training needs analysis Formation of expert committee for Preparation of training calendar Identification of training institutes Course contents and modules Oragnisation of training courses as per training calendar

Training/Workshops organised Total 39 training and workshops have been oragnised under NHP since 2015. Out of which some of the courses have been organised by NIH. NIH has oragnised training courses on i. Basics of Hydrology, Ground water hydrology, HEC based modelling solutions, Hydrologic forecasting etc. Beside this, some of the courses have been organised jointly with CWC and CWPRS. Some times, it is difficult to get sufficient number of participants for the training course.

PURPOSE DRIVEN STUDIES (PDS) One of the main focus of NHP is to take up R&D studies in the form of Purpose driven studies (PDS). PDS would address the specific issues of water management problems identified within the area of operation of implementing agencies and of public concern. Outcome of the studies are expected to provide feasible and cost effective methodologies for replication in other areas situated in similar hydrological and hydro-geological setup. To Total PDS received 30 Presented during first R&D Session (13-14 July, 2017) 26 Sent for approval/revision : 20

PFMS: Public Financial Management System National Institute of Hydrology, Roorkee is already registered on PFMS. The Bank Account No. 35527112389 (NHP) is linked to the PFMS. Soon NIH PFMS account will be operational.

WAY FORWARD Oragnisation of trainings as per the training calendar and as per the need/requirements of the IAs R&D session of the PDS received from IAs Preparation of bid documents of all the equipments Studies to be carried out in the Centre of Excellence of modeling

THANKS