SVD Overview Christoph Schwanda Institute of High Energy Physics Austrian Academy of Sciences 8th Belle II VXD Workshop September 9-11, 2015 Trieste, ITALY.

Slides:



Advertisements
Similar presentations
A Low Mass On-chip Readout Scheme for Double-sided Silicon Strip Detectors 13th February 2013 C. Irmler, T. Bergauer, A. Frankenberger, M. Friedl, I. Gfall,
Advertisements

HFT Technical Overview September 26, HFT 2013 TPC FGT 2011 STAR Detectors Fast and Full azimuthal particle identification EMC+EEMC+FMS (-1 ≤ 
ATLAS SCT Endcap Detector Modules Lutz Feld University of Freiburg for the ATLAS SCT Collaboration Vertex m.
Electrical QA Markus Friedl (HEPHY Vienna) IPMU, 19 March 2012.
The Silicon Vertex Detector of the Belle II Experiment
Milestones and Schedule of SVD Construction Markus Friedl (HEPHY Vienna) on behalf of the Belle II SVD Collaboration BPAC October 2012.
Summary of the SVD session 19 March 2009 T. Tsuboyama (KEK)
The Belle II Silicon Vertex Detector Readout Chain Markus Friedl (HEPHY Vienna) TWEPP2012, 19 September 2012.
The Belle SVD Trigger  Tom Ziegler  Vertex 2002  Kailua-Kona, Hawaii, 4-8 th nov The Belle SVD Trigger Tom Ziegler on behalf of the Belle SVD.
The LHCb Inner Tracker LHCb: is a single-arm forward spectrometer dedicated to B-physics acceptance: (250)mrad: The Outer Tracker: covers the large.
M.Friedl, C.Irmler, M.Pernicka HEPHY Vienna
18 November 2010 Immanuel Gfall (HEPHY Vienna) SVD IR Mechanics 7 th B2GM.
SVD Mechanics 21th B2GM Florian Buchsteiner (HEPHY Vienna)
18 November 2010 Immanuel Gfall (HEPHY Vienna) SVD Mechanics IDM.
26 April 2013 Immanuel Gfall (HEPHY Vienna) Belle II SVD Overview.
The Belle Experiment at KEK Christoph Schwanda Institute of High Energy Physics (HEPHY) Austrian Academy of Sciences Symposium Wissenschaftliche Kooperation.
1 Belle II IR 2 Shuji Tanaka KEK Joint Belle II & superB Background meeting 2012//Feb/ 8-9th 1.
7 th B2GM SVD Summary 19 November 2010 Markus Friedl (HEPHY Vienna)
Noise and Capacitor M.Friedl, R.Thalmeier, H.Yin (HEPHY Vienna) 24 September 2015.
Status of SVD Readout Electronics Markus Friedl (HEPHY Vienna) on behalf of the Belle II SVD Collaboration BPAC October 2012.
Construction and Test of the First Belle II SVD Ladder Implementing the Origami Chip-on-Sensor Design 29 Sept TWEPP 2015, C. Irmler (HEPHY Vienna)
Super-Belle Vertexing Talk at Super B Factory Workshop Jan T. Tsuboyama (KEK) Super B factory Vertex group Please visit
The Belle II Silicon Vertex Detector Florian Buchsteiner (HEPHY Vienna)
Kodali Kameswara Rao TIFR, Mumbai
The CMS detector as compared to ATLAS CMS Detector Description –Inner detector and comparison with ATLAS –EM detector and comparison with ATLAS –Calorimetric.
Tsukuba-hall webcam 1 Beam Pipe and Vertex Detector extraction: on Nov. 10, 2010 Belle Detector Roll-out: Dec. 9, 2010 End-caps, CDC, B-ACC, TOF extraction:
SVD Mechanics Markus Friedl (HEPHY Vienna) BPAC, 26 October 2015.
Tasks and time scale T. Tsuboyama (KEK). DSSD production Test production by Micron and SINTEF (Talk by M. Valentan) HPK decided to restart DSSD business.
11 June 2015 Thomas Bergauer (HEPHY Vienna) Belle II SVD beam Test SPS 2015 SPS users meeting.
The Belle II Silicon Vertex Detector assembly and mechanics
10 September 2010 Immanuel Gfall (HEPHY Vienna) Belle II SVD Upgrade, Mechanics and Cooling OEPG/FAKT Meeting 2010.
Comments on ladder structure 5 Feb Toru Tsuboyama.
2 Oct C. Irmler (HEPHY Vienna) BPAC Preparation and SVD Schedule 6 th Belle II VXD workshop.
Overview SVD 21 Jan C. Irmler (HEPHY Vienna) 7 th Belle II VXD Workshop, Prague.
Next chance for Service test. In the next B2GM Use of old VXD KEK The screw connection may not work. -> double scotch tape for PXD PP mock 1/4.
Ladder Mount R&D T. Tsuboyama (KEK) 2 Oct T. Tsuboyama (KEK) 2 Oct
SVD DAQ Status Koji Hara (KEK) 2012/7/19 DAQ workshop1.
SVD QCG Report F.Forti. Outline Sep 09, 2015QCG Report, F.Forti2 view/Detector/SVD/SvdQCQAGrou p.
25th April 2013 C. Irmler (HEPHY), Y. Onuki (IPMU) Ladder Assembly Procedure Belle II – New Collaborators Meeting.
SVD Status Markus Friedl (HEPHY Vienna) SVD-PXD Göttingen, 25 September 2012.
VXD mechanics issues S.Tanaka. Remaining issues (short term) SVD ladder mount table –Mount arm design(KEK+SVD) –Origami cooling pipe assembly procedure.
Status & schedule of ladder parts production Oct. 2, 2014 Koji Hara (KEK)
24 September 2012 Immanuel Gfall (HEPHY Vienna) Annekathrin Frankenberger (HEPHY Vienna) SVD Status of Mechanics PXD-SVD Meeting Göttingen.
Schedule 24 September 2012 Christian Irmler (HEPHY Vienna) Joint PXD and SVD Meeting Göttingen.
SVD Slow Control Markus Friedl (HEPHY Vienna) DAQ/SC Kickoff Meeting, 8 November 2012.
H.-G. Moser, Jennifer Consortium Meeting, Rome, June 10-12, B factories - results and motivation for upgrade SuperKEB - how to reach 40x more luminosity.
Silicon Vertex Detector Schedule 23 July 2012 Christian Irmler (HEPHY Vienna) 12 th Open Meeting of the Belle II Collaboration.
Straw man layout for ATLAS ID for SLHC
Belle II status and plans
Florian Buchsteiner (HEPHY Vienna)
L.Vitale INFN and Univ. Trieste
9 September 2015 VXD Mechanics Summary Markus Friedl (HEPHY Vienna)
SVD Electronics Constraints
SVD Introduction Wetzlar SVD-PXD Meeting, 4 February 2013
The Software Library of the Belle II Experiment
 Silicon Vertex Detector Upgrade for the Belle II Experiment
Update on the SVD construction
7th Belle II VXD Workshop, Prague
Christoph Schwanda (HEPHY Vienna) For the Belle II SVD group
Discussion items SVD mechanics session.
Report on WP2 Activities
Katsuro Nakamura Sep. 10, 2015 VXD meeting
PXD Summary Tests PXD9 Pilot Production ASICs Components Plans:
The Silicon Vertex Detector of the Belle-II Experiment
Belle II - Introduction
Preparation of the CLAS12 First Experiment Status and Time-Line
SVD Mechanics Group Organization & Work packages
BPAC, 17 October 2017 VXD GND/EMC Markus Friedl (HEPHY Vienna)
The CMS Tracking Readout and Front End Driver Testing
SVD group organization, schedule, milestones
Presentation transcript:

SVD Overview Christoph Schwanda Institute of High Energy Physics Austrian Academy of Sciences 8th Belle II VXD Workshop September 9-11, 2015 Trieste, ITALY

Belle II Vertex Detectors PiXel Detector (PXD) Based on DEPFET pixels – see previous talk Silicon Vertex Detector (SVD) Double-sided silicon strip detectors (DSSDs) VXD requirements Fast – to operate in high background environment Better resolution at IP – to compensate reduction of boost wrt. Belle I Radiation hard (up to 100 kGy) Self-tracking capable – to track particles down to 50 MeV in pT SVD PXD

Belle II SVD Components Carbon fiber (CF) cone Outer CF shell End flange End rings Ladders Beam pipe PXD (inside SVD  individual sub-detector) 4 Layers double sided silicon strip detectors 2,3,4 or 5 sensors per ladder

SVD ladders L6 Ladder (Kavli IPMU) FWD L5 Ladder BWD L4 Ladder (TIFR) Layer Ladders Sensors / Ladder 6 16 5 12 4 10 3 7 2 SVD ladders L6 Ladder (Kavli IPMU) FWD module FWD Origami +z L5 Ladder (HEPHY) Origami ce BWD Origami -z L4 Ladder (TIFR) BWD module L3 Ladder (Melbourne) Cooling pipe FWD module (Pisa) Cooling pipe BWD module (Pisa) Cooling pipe

Ladder anatomy (L5) Origami hybrids (with APV frontend readout chips) Airex sheet (insulator) Sensors Carbon fiber sandwich ribs

FW/BW (Pisa) L3 (Melbourne) L5 (HEPHY) L4 (TIFR) L6 (Kavli IPMU) All sites have successfully assembled SVD ladders with the final components

Status at the assembly sites FW/BW (Pisa) Site passed final qualification review on May 29 and is now in production mode L3 (Melbourne) Site assembled two class C ladders (L3.902 and L3.903) and is now moving to the first electrically working ladder (class B) L5 (HEPHY Vienna) Site passed final qualification review on Aug 6 Very recently completed first production-grade ladder (L5.001) ® origami evaluation L4 (TIFR)/L6 (Kavli IMPU) Both assembled class C and B ladders, close to production readiness Main outstanding issue: shift of FW sensor

Results class C L3 survey

Ladder survey Results class C L5 survey Overview of average offsets of each Ladder [µm] Stefan Schultschik (HEPHY Vienna) 6th August, 2015

Results class C L4 survey

Results L6 survey

Ladder parts availability Sensors Three types of DSSD sensors: Micron (trapezoidal), small and large HPK (rectangular) After a detailed inventory and sensor grading revision, we conclude that sensors are in hand to produce the detector including 2 spares/layer with a safety factor (~20%) Only 5 small HPK sensors for L3 need to be reproduced (available ~end 2015) Origami In autumn 2014 we lost the origami mass production due to cracks in the PA0 lines PA0 redesign, origami pre-production, requalification

Source run with pre-production origami (Aug 28) Electric functionality of new origami confirmed!

First samples from the origami mass production expect for the second half of November

Other issues to follow-up Ladder mount procedure Decision on the concept at the June B2GM (ladder mount from the side) But many details to work out (ladder mount adapter – keep or remove, gluing of FOS fibers and NTC sensors, CO2 pipe attachment, …) Read-out electronics Redesign of the FADC board layout Trigger latency issue Does the L1 trigger arrive within 5 ms to the APV

Support structure assembly CMM measurement of assembled FWD-BWD structure (v1): Inoue-san will be done in Sep (after VXD meeting). I will show the data as soon as possible. Second trial of endring+endflange assembly (v2): Katsuro Order of modified jigs for FWD was taken place. They will appear the middle of Sep. We will try to assemble FWD half endrings in Nov. Support-rod reproduction: Suzuki-san We will employ ETP bushings for the new rod. But they will appear the end of Oct. Easy to achieve co-axis and squareness, and easy to adjust position in Z. Production: by the begin of Nov.

Ladder Mount Table Index plate 3D measurement system Considering cable routing, optimize index plate and fixation mechanism. by Oct. B2GM 3D measurement system change the stroke of movable stages. Division of half-structure Setup rails on table Division test Storages of half-structure (Toru) Above tasks are managed by Suzuki-san and Maki-san. Division Tool Index Plate Coordinate Measurement System

PXD region of interest gen FADC Readout System “COPPER” board RX x48 FADC Data stream CPU SVD FADC Zero supp. Formatter Repeater to HLT ~2m ~10m belle2link TX x1748 APV25s Aurora link TRG/CLK signals PXD region of interest gen VME to PXD x4 buffer Data size reduction FADC Ctrl APV trig gen Decoder Cu cable Trigger/ timing distributor Central TRG FADC-Ctrl SVD readout system Central DAQ Prototypes of all components have been developed.

SVD parallel session agenda Thursday morning

SVD parallel session agenda Thursday afternoon

Discussion items at this meeting Discussion time is foreseen during this meeting for a number of items, both in the plenary and in the parallel Most pressing item: organization of the March/April 2016 combined testbeam at DESY date/schedule goals and participating sub-systems sub-system contact persons and organization The idea behind the agenda is to discuss these items first within PXD/SVD separately (Thu) and then have a combined discussion (Fri)

Summary The SVD ladder production has started although not all assembly sites have been fully qualified L5.001 assembled, surveyed and electrically tested The origami pre-production has been successful – first mass production samples are expected for the second half of November The next challenge will be to fully develop and qualify the ladder mount At this meeting, we need to clearly define what we expect for the DESY testbeam Mar/Apr 2016 and set up the organisation

backup

The Belle II detector CsI(Tl) EM calorimeter: waveform sampling electronics, pure CsI for endcaps RPC μ & KL counter: scintillator + Si-PM for end-caps Time-of-Flight, Aerogel Cherenkov Counter → Time-of-Propagation (barrel), prox. focusing Aerogel RICH (forward) 4 layers DS Si vertex detector → 2 layers PXD (DEPFET) + 4 layers DSSD Central Drift Chamber: smaller cell size, long lever arm

SVD schedule Ladder Production schedule still consistent with a start of ladder mount in April 2016

VXD ( PXD + SVD ) Schedule High level milestones First mass production ladder (L4-L6) Oct. 2015 2nd beam test Jan.-Feb. 2016 Start of ladder mount to support structure Apr. 2016 SVD readiness in KEK Feb. 2017 PXD readiness in KEK Apr. 2017 PXD+SVD integration Jun. 2017 PXD+SVD combined cosmic ray test PXD+SVD installation Apr. 2018 Start of physics run 4Q 2018