FRCSW Advanced Technology Innovation (ATI) Intermittent Wiring Initiatives Overview 25 July 2017 JTEG Brett Gardner, ATI Avionics STL.

Slides:



Advertisements
Similar presentations
A BPM Framework for KPI-Driven Performance Management
Advertisements

Organizational & Intermediate Level Wire Tester Acquisitions (FY-07)
F/A-18E/F SUPER HORNET BLOCK II MULTI-YEAR PROCUREMENT
JHP Case Study Introduction 1 UNCLASSIFIED notional data for notional program.
ECLYPSE The System Engineering Challenges of Implementing an Automatic Wire Analyzer (AWA) System for the Naval Aviation Community 6th Annual Systems Engineering.
Team 7 / May 24, 2006 Web Based Automation & Security Client Capstone Design Advisor Prof. David Bourner Team Members Lloyd Emokpae (team Lead) Vikash.
Distribution Statement A: Approved for Public Release; Distribution is unlimited. 1 Electronic Warfare Information Operations 29 MAR 2011 Val O’Brien.
Office of the Secretary of Defense Defense Microelectronics Activity (DMEA) Defense Microelectronics Activity (DMEA) Doug Casanova Defense Microelectronics.
ARIES Project Meeting, L. M. Waganer, Jan 2009 Page 1 Debrief of Dr. Whelan’s TRL and Aerospace & R&D Risk Management Debrief of Dr. Whelan’s TRL.
Centers for Disease Control and Prevention Office of the Associate Director for Communication Electronic Health Records/Meaningful Use and Public Health.
Copyright Statement Copyright William F. Hogue, This work is the intellectual property of the author. Permission is granted for this material to.
Readiness-Based Sparing addresses a challenge common across DOD
Federal Aviation Administration CLEEN (Continuous Lower Energy, Emissions and Noise) Program Technologies Development AIAA Aerospace Sciences Meeting Jim.
CS410 - BLUE GROUP Final Presentation communicate2Me.
1 | Program Name or Ancillary Texteere.energy.gov Water Power Peer Review WET-NZ Multi-Mode Wave Energy Converter Advancement Project Justin Klure, Program.
Server Virtualization: Navy Network Operations Centers
Unit I Module 2 - NAVAIR RCM Policy and Organization
© Grant Thornton | | | | | Guidance on Monitoring Internal Control Systems COSO Monitoring Project Update FEI - CFIT Meeting September 25, 2008.
Future Airborne Capability Environment (FACE)
Agricultural Innovation Program (AIP) November 2011.
A-Gas II- Video Detection for Damage Prevention Kickoff Meeting Kickoff Meeting July 27, 2009 New York, NY P&L E-Communications, LLC.
Development of Methodologies for Independent Verification and Validation of Neural Networks NAG OSMA-F001-UNCLASS Methods and Procedures.
GREG CAPPS [ ASUG INSTALLATION MEMBER MEMBER SINCE:1998 ISRAEL OLIVKOVICH [ SAP EMPLOYEE MEMBER SINCE: 2004 GRETCHEN LINDQUIST [ ASUG INSTALLATION MEMBER.
Carl G. Ray Program Executive Small Business Innovation Research Small Business Technology Transfer SBIRSBIR To increase small business participation.
Next Generation ISEA Roadmap
Proposition 1 Workshop: the Grant Application Process July 2015.
Digital recordkeeping strategy for mobile work processes Joel Smith HPRM System Administrator.
CAPT Brian Hinkley Director, Fleet EW Center 15 October 2009
Doing Business with the Naval Air Systems Command Presented to: SMART PROC 2015 Presented by: Ken Carkhuff Deputy Associate Director NAVAIR Office of Small.
Small Business Innovation Research Program (SBIR) Presented by Sharina Broughton.
UNCLASSIFIED Project Stepstone Dave Pierce9 December 2009 Deputy Director Army Spectrum Management Office HQDA CIO/G6.
LOG235/236 Performance Based Logistics Bruce Hatlem Logistics Functional IPT September 2007.
Power to the Edge A Net-Centric DoD NII/DoD CIO IT Acquisition Management Transformation Rapid Improvement Team (RIT) Principals Meeting November 18, 2003.
Technology Insertion Program for Savings (TIPS) Last Updated: 15 July 2014 (make sure to include this on all slides, Arial 9) CLASSIFICATION PROPOSED SOLUTION/EXECUTION.
Heat Network Demonstration SBRI: policy context & objectives for the competition Natalie Miles Heat Strategy and Policy (Heat Networks)
National Aeronautics and Space Administration NASA SBIR/STTR A holistic Approach LK Kubendran, PhD, MBA Portfolio Executive Commercial Partnerships Programs.
Performance Based Logistics
Technology Transfer at SSC Atlantic
DoD Template for Application of TLCSM and PBL
Insider Connectivity Review & Savings Analysis
Additive Manufacturing Measurement Uncertainty Emerzon Cruz Guandique
A connected home solution
DUAL POLARIZATION AND ZDR CALIBRATION IMPROVEMENTS 5.2(6)
CAD/PAD Development Process
Maintenance Ticketing Gateway (MTG) CEMR/MEDIACC Replacement
WP1 – Smart City Energy Assessment and User Requirements
Demand Control Field Trials
Realized Savings to Date: $10M+
AMT Toolkit for MCM Sales
Innovations Technology. Forward
GSSLLC (C) ALL RIGHTS RESERVED
24 April 2018 Janice Bryant, Strategic Innovation Manager
DoD Automatic Test Systems (ATS) Strategies
Transferability in Practice?
Funding from the Local Perspective
Workshop Session 1: Overview
YOW Shuttle Project The 3rd Annual Ottawa AV Summit April 4th, 2018
KIRIBATI IW R2R PROJECT OUTLINE OF PRESENTATION: PROGRESS
Workshop Session 1: Overview
2016 Maintenance Innovation Challenge
CONCEPT TITLE Category Overview: Graphic: Description: Value to NASA:
DIMETRA™ EXPRESS SYSTEM SERVICES
Director, Tactical Innovation Implementation Lab (TIIL)
Tracie Wills Senior Commissioning Officer
Wide Ideas Idea Management Software Idea Management Process
Driving Successful Projects
Augmented Reality Monitoring System for Aircraft Wiring
Concept Development Template
Executive Sponsor: Rick Padilla-State Maintenance Bureau Chief
OU BATTLECARD: WebLogic Server 12c
Presentation transcript:

FRCSW Advanced Technology Innovation (ATI) Intermittent Wiring Initiatives Overview 25 July 2017 JTEG Brett Gardner, ATI Avionics STL

Intermittent Fault Detection & Isolation System (IFDIS) OPERATIONAL NEED Objective: Provide an Intermittent Fault Detection & Isolation System (IFDIS) that uses current and voltage to constantly monitor the Unit Under Test while it undergoes vibration/temperature cycles. Value to Naval Warfighter: Increase the quality of avionics components delivered to the fleet. Streamline the repair process To test this, FRCSW sent 5 ready for issue Generator Control Units GCUs to be tested with the IFDIS. Four of the five came back with intermittent faults and the exact location of the faults for easy repair. Gap or Science & Technology Objective (STO): Reduction of Total Ownership Cost Impact if Not Addressed: Continue to sell units that have failures when the aircraft is in flight. This is an SBIR project. Picture or Graphic Here: that illustrates technology or concept to a non-expert Resolution <250 KB PROPOSED SOLUTION Intended: Test across all circuits at once to detect intermittent faults as short as 50 nanoseconds . Technical approach: Originally an Air Force SBIR project with Universal Synaptics. The system passed through USAF Phase I and II and has been implemented at FRCSW a CIP project 2015/16 SBIR phase 3 purchase. Weapon systems impacted: F-18 CGU with potential for all NAVY WRA chassis Where this is already used: Air Force, for F-16 radar. Other sites that can use this: FRCSE and FRCE STATUS ASSESSMENT TRL: Current: 9 Schedule: IFDIS installed 2015 Expand capability for additional aircraft components through awareness; additional costs include development of unique test cable sets and test spectrum program for UUT. FRCSW Pilot program to evaluate impact to Depot $$ to implement IFDIS testing. 10 F18 Super Hornet GCU’s will be evaluated Performance: CIP Funds were obligated for this project in February 2014 and fully expended 2016. Cost: $3,500,000 ; including TPS for all variants of F18 CGU Current/potential Barriers: Lack of technical requirement to direct testing.

Voyager – On-aircraft Demonstration via CRADA OPERATIONAL NEED Objective: Demonstrate Ncompass/Voyager- Intermittent Fault Detection & Isolation System (IFDIS) capability on aircraft wiring. Value to Naval Warfighter: Increase the reliability of aircraft wiring in the Fleet. Streamline the repair process. Increased TOW for critical Aircraft systems. Gap or Science & Technology Objective (STO): Reduction of Total Ownership Cost-increase reliability and TOW for aircraft systems. Impact if Not Addressed: Continue to have system failures when the aircraft is in flight due to intermittent wiring issues. Ncompass/Voyager PROPOSED SOLUTION Intended: Use neural network to check all lines simultaneously and continuously. Current testing methods utilize sequential voltage checks; one connection at a time. Ncompass/Voyager technology can detect intermittent faults as short as 50 nanoseconds in aircraft wiring. Technical approach: Cooperative Research and Development agreement (CRADA) to demonstrate Ncompass/Voyager technology on F18 and other Navy platforms. Weapon systems impacted: F-18, and other platforms that are available. Where this is already used: Commercial. Other sites that can use this: FRCSE and FRCE STATUS ASSESSMENT TRL: Current: 9 Schedule: FY17 CRADA – in work ECD 12/17. Test F18 and other platforms using AWTS TPS wiring harness. Nose steering cable and CGU AC cables have been obtained. Performance: Expect improved wire testing capability. Cost: TBD Current/potential Barriers: None

AMUET – Wireless On-aircraft Demonstration via FCT OPERATIONAL NEED Objective: Demonstrate Solavitek AMUET wireless Intermittent Fault detection via Foreign Comparative Testing (FCT)/NCMS project on F/A-18 aircraft wiring. Collaborate with Air Force will demonstrate intermittent and all wiring testing capabilities of AMUT System. Value to Naval Warfighter: Increase the reliability of aircraft wiring in the Fleet. Streamline the repair process. Increased TOW for critical aircraft systems. Gap or Science & Technology Objective (STO): Reduction of Total Ownership Cost-increase reliability and TOW for aircraft systems. Impact if Not Addressed: Continue to have system failures when the aircraft is in flight due to intermittent wiring issues. PROPOSED SOLUTION Intended: Demonstrate wireless technology to detect intermittent faults as short as 50 nanoseconds in aircraft wiring using wireless capabilities. Technical approach: Demonstration of AMUET technology on F18 and other platforms. Weapon systems impacted: F-18, V-22 and other platforms as available. Where this is already used: Commercially Other sites that can use this: All FRCs STATUS ASSESSMENT TRL: Current: 6 Schedule: FY18 FCT program Test F18 and other platforms FY17/18 Nose steering cable and GCU AC cables are the initial systems of interest, other systems tested as funding and time permits. Performance: Expect improved wire testing capability Cost: Initial Pilot $170K funded by Navy FCT office. Managed by NCMS. Cost of AMUET wireless systems and TPS TBD. Current/potential Barriers: Wireless capability requires IT Authority to Operate (ATO). As a back up system can operate with 10 Base-T

Future ATI Demonstration Opportunities CRADA with Eclypse International to demonstrate intermittence capability of AWTS Partner with Eclypse to evaluate technology. Software updates to AWTS provide for intermittence capability. Collaborate with 4.8 Lakehurst to verify intermittence capability of AWTS. Anticipate October 2018 project start date.