Town Road Survey - What You Should Know 1_24_17

Slides:



Advertisements
Similar presentations
GUNTER PARK SURVEY BY: PAIGE GARNER. POOlS FIBERGLASS POOL Advantages: The gel coat surface of the fiberglass pool shell is nonporous. This inhibits.
Advertisements

Wyoming County Paved Roads Management and Monitoring Khaled Ksaibati, Ph.D., P.E. STIC June, 2014.
City of Bloomfield Hills Asset Management Plan. Outline Overview plan Challenges and community input Recommendations for others.
Low Volume Road Solutions By: Jason Panter. Seal Coats What is a Seal Coat? – Thin surface treatments – Binder & Aggregates.
California Chip Seal Association 2007 Award of Excellence in Contracting Innovative Process Category International Surfacing Systems City of Antioch 2007.
The Dyer Partnership Engineers and Planners City of North Bend Pavement Management Plan & Street Utility Fee Analysis February 11, 2014.
City of Willows Pavement Management Program Road Maintenance Needs March 25, 2014.
Town of Southbury Department of Public Works 2014.
City of Auburn Hills Road Asset Management Program February 21, 2014 SEMCOG University.
 Narrow roadway, with no shoulders  Poor pavement condition  AADT 405/150 – Low Traffic Volume  Ideal candidate for P.I.P.
Pavement Design Terms and Concepts
Why Pavement Maintenance and Preservation? Sponsored by: Minnesota T 2 Center Presented by: Michael Marti, P.E. SRF Consulting Group, Inc. Dan Wegman,
City of Somersworth Presentation to City Council on Pavement Management Presented by: Joe Ducharme, Jr., P.E. Contract City Engineer & Britt E. Audett,
Herriman City Engineering Department.  Herriman City has experienced tremendous growth over the last several years  Many new subdivisions and associated.
PAVEMENT MAINTENANCE II Part 1b: Chip Seal Construction Idaho Roads Scholar Program.
Pavement Preservation in South Carolina J. C. “Clem” Watson, P.E. Chief Engineer for Operations South Carolina Department of Transportation.
Project Manager: Tim Brown Project Editor: Tabatha Doughty Project Engineer: Drew Furry Project Engineer: Jim Walter.
Crane Bridge Design STJ Engineering Matt Albert AJ Chandler Noah Fehrenbacher Jake Gennicks Jake Wilhoit Rose-Hulman Institute of Technology.
Success with Alternatives to Paving Mr. Chuck Fromelt Day County Highway Superintendent Webster, South Dakota.
Pavement Maintenance II
LHTAC1 LOCAL HIGHWAY JURISDICTION EFFICIENCY  Add Reporting/Performance measures to the Road and Street Finance Report  Undertake a study to evaluate.
Pavement Preservation Protecting the Investment and the Environment R. Gary Hicks CP2 Center, Chico, CA Prepared for CEAC 2014 Conference March 26-28,
Wes Marshall, P.E. University of Connecticut March 2007
Eliminates having to use quarried road base material saves cost of quarrying, transport and time. Cheaper road construction costs – 20% > Unique ability.
Cultural change through the implementation of accredited safe work systems Submission by Accurate Asphalt & Road Repairs Pty Ltd to AUSTSTAB Awards for.
Town Road Redevelopment Plan Concept Introduction & Overview Town of Boulder Junction 1 December, 2015.
Managing Road Maintenance Efficiently and Economically (Doing it Right the First Time) 2015 SDATAT Annual Road Conference Mr. Ken Skorseth SDLTAP Special.
WEDGEWOOD COVE HOA STREET PAVING/RESURFACING PROJECT.
“resurfacing hotline” (512)
Multi-Layer Systems By Vadim Kravtsov Intermountain Slurry Seal, Inc 1.
Chip Seal Design Chapter 2. North America (ranked by prevalence) Empirical / Past Experience No Design Method Own Method McLeod (1960’s) - Asphalt Institute.
The Highway Fund – Planning, Measuring, and Reporting Mike Holder, PE, Chief Engineer 2015 CAPA / DOT Workshop February 24, 2015.
Full Depth Reclamation
Chip Seal Best Practices by: Larry Galehouse, P.E., P.S., Director National Center for Pavement Preservation.
GRAVEL MI. HARD SURFACE1100 MI. BRIDGES308 CULVERTS (36” or Bigger)855 RAILROAD22 MI.
Jerry L. Larson IRMCA Indiana LTAP Basics of a Good Road
2013 Roads and Sidewalk Capital Programs Roads and Parks Maintenance Department Development & Infrastructure Division December 2, 2013.
Brookeville Bypass Final Design Presentation Initech May 6, 2004.
PROJECT SELECTION RIGHT TOOLS, RIGHT TIME, RIGHT PROJECT Presented by Joe Ririe, PE PAVEMENT ENGINEERING INC. September 9, 2015.
CITY OF BELLEVILLE ROAD IMPROVEMENTS PROGRAM
Deschutes county road department otta seal gravel road conversion pilot project December 7, 2016 oaces chip seal workshop.
Alabama Asphalt Pavement Association
Town Road Improvement Project Plan
City of Charlottesville
Town Road Improvement Project Communication Plan
Pothole Patching Alternatives
General Road Construction Information
Boulder Junction Town Road Improvement Project
Pierce County Pavement Preservation Program
City of Abilene Pavement Condition Survey 2017 Results and Discussion
Jefferson County SA Red Rocks Site Approval
Boulder Junction Town Road Improvement Project
General Road Construction Information
Town of Clayton 2016 Pavement Condition Survey
Boulder Junction Town Road Improvement Project
Kent County Road Commission Partnering with 21 Townships serving over 235,000 residents and 1312 miles of Local Roads.
World Class Air conditioning Services Available - A+ Mechanical is best solution of Air conditioning services, with proper installation as well as maintenance.
Street Improvement Plan
Pavement condition index calculation
PAVEMENTS CEE 320 Steve Muench.
Paramix mid-term meeting in Barcelona November 13, 2002
Introduction to Pavement Design
Deep Crack Sealing with Chipseal
Participatory Road Program neighborhood meeting Donahoo 174th Street
How to install pavers..
UTILIZING GRINDINGS ON RURAL ROADS:
Pavement Structural Analysis
Pavement Preservation Philosophy utilizing Pavement Management Systems
KENT COUNTY Safety Edge Projects
Presentation transcript:

Town Road Survey - What You Should Know 1_24_17

Town Roads What you should know! Mileage: 93.17 miles surveyed 29.01 miles – No improvement work currently required ( 29% ) 64.16 miles – Improvement work required ( 71% ) Survey Criteria: Occupancy (low = 1, high = 5) Traffic (low = 1, high = 5) Condition (poor = 5, good = 1) Additional one half to one full point awarded for single access roads) Maximum points awarded 15 Town Road Survey - What You Should Know 1_24_17

Town Roads What you should know! Road Survey Categories: Town Road Survey - What You Should Know 1_24_17

Town Roads What you should know! Key Survey Results: High Priority Roads (High Occupancy, High Traffic, Worst Condition) were designated to become asphalt roads making them the most expensive to fix. Allen Rd / High Lake Rd. / High – Fishtrap Lake Rd feed the largest number of residents. North Creek Road (4.5 Miles) is the single longest town road and a key emergency road between Hwy M and Hwy H. Newcomb Rd (3.5 Miles) and Fallon Rd (2.0 Miles) are long, single access roads. Town Road Survey - What You Should Know 1_24_17

Town Roads What you should know! Top 20 Roads: Town Road Survey - What You Should Know 1_24_17

Town Roads What you should know! Road Cost Estimate Matrix Matrix is based on 2015 data and will be updated to create the final plan options. Road Improvement Levels / Costs: Gravel to Gravel - $40,000 per mile Gravel to Chip Seal - $60,000 per mile Chip Seal to Chip Seal - $95,000 per mile Chip Seal to Asphalt - $155,000 per mile Asphalt to Asphalt - $155,000 per mile Note: 2015 Cost Data – REQUIRES UPDATING Town Road Survey - What You Should Know 1_24_17

Town Roads What you should know! Road Survey Mileage / Cost Summary The first 19 miles of road (worst shape, highest traffic, highest occupancy) would require 41% ($2,635,600) of the total budget ($6,391,300), and cover 20% of the total miles of town roads. Town Road Survey - What You Should Know 1_24_17

Town Roads What you should know! Road Materials: Asphalt Average Life span of an asphalt road without maintenance is 16 years to total failure. With regular maintenance and repair, it can be extended to 30 years or more. Asphalt is applied over the top of gravel, usually in two layers. The typical finished thickness is 3 ½”. Chip Seal Chip seal was originally designed as a cost effective asphalt maintenance surface not necessarily a stand alone road surface. A chip seal surface is applied to a gravel base to provide a wearing surface and dust free environment. Town Road Survey - What You Should Know 1_24_17

Town Roads What you should know! Road Materials: Chip Seal A gravel road is prepped for chip seal by grading and compacting to add the appropriate slope and grade for proper water drainage. A chip seal surface is applied in two coats. The first coat, a 5/8” chip. Is applied to create a base layer of top of gravel. The second layer, a 1/4” or 3/8” chip, is applied on top of the base to create the surface layer. The finished surface is less than inch in thickness. Town Road Survey - What You Should Know 1_24_17