HF “Slice test box” installation

Slides:



Advertisements
Similar presentations
LST Mechanical Design Review Utility Routing, Cableways & Crate Locations Peter Kim October 21, 2003.
Advertisements

M.PEGORARO Grounding Workshop 24th Jan 08 DT GROUNDING & SHIELDING Presented by A. BENVENUTI.
HCAL RBX PRR Overview Jim Freeman RBX PRR March 1-2, 2001.
KEK beam test H. Sakamoto. Purpose To optimize a concentration of the second dopant for scintillating fibers KEK beam test to study light yields for various.
1Daya Bay RPC HV FDR 6/17/2008 RPC HV cable pick-up noise issue C. Lu, Princeton University (6/17/2008)
RACKS AND CABLES Peter Kim SLAC LST Install Readiness Review May 5, 2004.
CMS WeekDec 2002E. Hazen HF Electronics Status Report E. Hazen, J. Rohlf, E. Machado Boston University.
CPR2 Optical Cables Joey Huston Michigan State University …taking optical signals from edge of CPR/crack detectors to PMT boxes mounted on back of wedges.
HCAL-Fermilab7 Feb 2003Hazen / Machado HF Electronics PMT Readout Update E. Hazen, J. Rohlf, E. Machado Boston University.
DRAFT HCAL digital optic link and trigger mapping DRAFT.
RPC system cable routing Yang Changgen, Guan Mengyun IHEP, Beijing.
E. Hazen, Boston University BU Meeting, Apr. 6, 2001 Front-end Readout of the CMS Hadronic Forward Calorimeter (HF) Conceptual Design (Summary) by Eric.
Performance of the DZero Layer 0 Detector Marvin Johnson For the DZero Silicon Group.
1 HF Laser/LED Calibration Studies L. Almeida, M. Baarmand, L. Caraway, M. Hohlmann, T. Qureshi, I. Vodopianov FLORIDA TECH 1->9 light splitter w/ pulsed.
Experimental Area Meeting V. Bobillier1 Good connection to earth (in many points) of every metallic parts to be installed in the cavern is very.
Infrastructure for LHCb Upgrade workshop – MUON detector Infrastructure for LHCB Upgrade workshop: MUON power, electronics, cable Muon upgrade in a nutshell.
1 SLEEVE Discussion Ianos Schmidt – U.Iowa Ugur Akgun – U.Iowa John Neuhaus – U.Iowa Lucien Cremaldi - U.Miss David R Winn – Fairfield And help from many.
ZTF Interconnecting Scheme Stephen Kaye
Marc Baarmand Total of 8 Calibration Boxes (CBOX) for HF  CBOX contains Small blue scintillator (UV → blue) 1×9 Splitter (each CBOX serves 9 PMT RO Boxes)
HCAL Fall meeting Oct 11 to 13, 2004 HF assembly, commissioning and integration Ianos schmidt The University of Iowa.
Reaction Plane Detector Safety Review Abigail Bickley, for the RxnP Group University of Colorado June 22, 2006 All data sheets can be found at:
HF Cabling Upgrade Options T. Shaw 30-OCT HF 2012 Upgrade Meeting 30-OCT-10 T. Shaw.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester July 8, 2013.
Anatoli Konoplyannikov Design and integration of HV, LED monitoring and calibration system for HCAL Overview of the subsystems design High voltage.
Figure 1: ICD Single Channel Block Diagram Schematic PMT High Voltage Supply (see Figure 4 & 4a) LED Pulser PMT Calibration (see Figure 6) ICD Scintillator.
Design Progress Allen Ellis 18-September
N 2 Laser 300  QQ 150m HF  HF + 9 PMT Boxes  QP Calib Box 1  4 Counting Room HF Calibration Optical Fiber Path 9 PMT Boxes / Quad 24 PMT Tubes.
Karsten Heeger, Univ. of Wisconsin UW, June 3, 2010 The DM-Ice Test Detector Detector Concept Mechanical Assembly Vessel Options Logistics Considerations.
Reaction Plane Detector Safety Review Abigail Bickley, for the RxnP Group University of Colorado June 22, 2006.
1 SLEEVE Discussion Ianos Schmid – U.Iowa Lucien Cremaldi - U.Miss David R Winn – Fairfield And help from many 30 Oct 2010 Agun, Winn.
CEDAR Support Structure Peter Sutcliffe 24 th January 2011.
Chiho Wang Duke University 1 TRT Barrel integration Status / Schedule Chiho Wang.
1 CKOV1 at the MICE Experiment CKOV1 to perform mu/pi id w TOF0/TOF1. Progress since CM16 CKOV1 Fabrication and Installation TOF0 CKOV1 TOF1 EMCAL TOF2.
HF 2008 : Status and Plans CMS Week, February 2008 Aldo Penzo HCAL Commissioning Status (INFN-Trieste, Italy) (23 February 2008)
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester June 24, 2013.
Electronic Report Pigi. HV-LV-ADC status Sometimes “repaired boards” are not working properly and so I would like to propose you to: – Test and qualify.
HF UPGRADE PROJECT Y. Onel For HF Upgrade Project Collaboration 1.
Infrastructure for LHCb Upgrade workshop – MUON detector Infrastructure for LHCB Upgrade workshop: MUON power, electronics Muon upgrade in a nutshell LV.
PHENIX Safety Review Overview of the PHENIX Hadron Blind Detector Craig Woody BNL September 15, 2005.
Plans and Progress on the FPGA+ADC Card Pack Chris Tully Princeton University Upgrade Workshop, Fermilab October 28, 2009.
Christopher Cowden Advisor: Mario Spezziga Project: CMS HF (Forward Calorimeter)
E Ethernet C CAN bus P Profibus HV HV cables LV LV cables (+busbar) S Serial (RS232) Signal cable Other/Unknown Liquid or Gas Cable and/or Bus PCI-XYZ.
The ICD Project Alan L. Stone Louisiana Tech University All D0 Meeting - 7 September 2001.
CDMS II Shielding To Installation To Construction From Design.
Status of NEWCHOD E.Guschin (INR), S.Kholodenko (IHEP), Yu.Kudenko (INR), I.Mannelli (Pisa), O.Mineev (INR), V.Obraztsov (IHEP), V.Semenov(IHEP), V.Sugonyaev.
Sensitivity of HO to Muons Shashi Dugad for HO group India-CMS Meeting 6-7 Oct
Outline Upgrade status of the ECAL/HCAL HV control mezzanine board;  Firmware design,  Setup for making functional tests and validation FPGA firmware.
TRIPLEGEM and VFATs at The Test Beam Area TRIPLEGEM and VFATs at The Test Beam Area N. Turini……reporter Eraldo Oliveri! Eraldo Oliveri main worker! N.
Karsten Heeger, Univ. of Wisconsin UW, June 3, 2010 The DM-Ice Test Detector Detector Concept Mechanical Assembly Vessel Options Logistics Considerations.
Faculty of Physics, University of Belgrade Collaboration meeting, Dubna 8 th of April, ToF-LR Upgrade Jovan Puzović, Faculty of Physics, Belgrade.
RICH Readout Plans F. Bucci, M. Piccini on behalf of the RICH WG.
Belle-II bKLM RPC Readout Power & Ground Discussion 12 th Belle II General Meeting Gerard Visser Indiana University CEEM 7/24/2012.
HCAL Fall meeting, Nov 11-13,`04 HCAL digital optic link and trigger mapping Ianos Schmidt The university of Iowa.
HF ROBOX PRR3 Apr 2003E. Hazen HF Front-End Electronics ● System Description – Overview – PMT Board, ROBOX, Patch Panel – Signal Cable, Front-end boards.
TOF Update GlueX Collaboration Meeting Jefferson Lab May 12, 2009 Paul Eugenio & Alexander Ostrovidov Florida State University.
HF Test station at P5 A.Mestvirishvili.
SuperB meeting, Frascati
HF “Slice test box” fabrication and installation
PMT cabling Gian Luca Raselli INFN Pavia
EMU Slice Test Run Plan a working document.
ROBOX modification plans
Chamber Design and Integration RE3/1 and RE4/1
Fiber Installation for RUN 3&4
HF Test station at P5 A.Mestvirishvili.
Pierluigi Paolucci - I.N.F.N. Naples
LST Module Installation
Directional Optical Module Integration
Setup for testing LHCb Inner Tracker Modules
FOCAL LINE MODIFICATION OF THE E/W ARM OF THE NORTHERN CROSS RADIOTELESCOPE The modification consisted in removing the entire focal line from sector 3.
Commissioning of the CMS Hadron Forward Calorimeters Phase 1 Upgrade
Presentation transcript:

HF “Slice test box” installation HF ECR follow up, Dec 3, 2010 Ianos Schmidt

Replaces eight lowest eta PMT’s with Hamamatsu R7600U-200-M4 PMT’s Slice test readout box Replaces eight lowest eta PMT’s with Hamamatsu R7600U-200-M4 PMT’s Existing “plate 2” Existing PMT shields For 16 standard HF PMT’s Base board for new PMT’s: Conventional resistive bases provides“Reference” signals for QIE Ground connections to shields Safety ground “Mini Plate 2” New PMT shields

Slice box assembly cross-section for R7600U PMT’s Shield Ground strap Base board Plate II PMT Kapton insulator “Iron” shield ~17mm PMT to light guide Optical coupling (“sleeve”) Plate I Light guide mirror Light guide assembly (part of wedge)

Readout box with shields Shields plug into existing readout box “Plate1”

R7600U PMT’s and base board

Slice test box with new shields and base board

Box tested in BAT904 Test setup: Slice box HF front end crate + Calibration Unit HF LASER/LED light distribution fibers and CLI HF front end cables HF HV supply + CAEN supply HV adapter cable, later installed in USC TESTS: Laser/LED Channel mapping verification HV mapping Gain/single PE CAEN HV supply test HV cable adapter test Pedestal and light tightness HF ROB test unit Simulates calibration light distribution of HF wedge * Big thanks to Halil Saka for his work in 904

Location of new PMT’s IPHI 67 Covered PMT (IETA 29, short) New PMT’s are located on HF+ at IPHI 67 and cover towers IETA 29 to IETA 32

Locations of interventions Spare HV cable routing (from cable storage near rack X3U72 to IPHI 67) Light guide Mirror replacement IPHI=3 Removal of position measurement arm Readout box replacement IPHI=67

HF+ IPHI 3 light guide mirrors replaced AFTER BEFORE

Sleeves in IPHI 3, IETA 29 TEFLON Mirror TYVEK “Telescopic” Sleeve made of 3M radiant mirror film (“HEM”). Non conductive. TEFLON IETA 29S Mirror Light guide tube TYVEK IETA 29L In HF+ IPHI 3 all mirrors were replaced with standard “German Mylar”. HEM sleeves were installed everywhere except IETA 29S and IETA 29L which have Teflon and Tyvec sleeves respectively.