High Energy High Intensity Hadron Beams

Slides:



Advertisements
Similar presentations
CERN Robert Aymar – WelcomeCARE-HHH BEAM07, CERN, 1 October, 2007 CARE-HHH-APD event BEAM’07 "Finalizing the Roadmap for the Upgrade of the LHC and GSI.
Advertisements

Study of the Luminosity of LHeC, a Lepton Proton Collider in the LHC Tunnel CERN June F. Willeke, DESY.
A.KOVALENKO SUPERCONDUCTING MAGNETS for NICA BOOSTER & COLLIDER NICA ROUND TABLE DISCUSSION - 3 JINR, Dubna, November 05, 2008.
CERN W. Scandale & F. Zimmermann HHH, CARE’07, CERN, October 29-31, 2007 High Energy High Intensity Hadron Beams
Two Scenarios for the LHC Luminosity Upgrade Walter Scandale, Frank Zimmermann Special PAF meeting We acknowledge the support of the European.
Name Event Date Name Event Date 1 CERN F. Zimmermann CARE06, INFN, Frascati, November 17, 2006 High Energy High Intensity Hadron Beams
Two Scenarios for the LHC Luminosity Upgrade Walter Scandale, Frank Zimmermann ACES workshop We acknowledge the support of the European Community-Research.
CERN F. Ruggiero & W. Scandale CARE Steering Committee, Paris, 11/04/2006 High Energy High Intensity Hadron Beams CARE-HHH Network: coordinators: F. Ruggiero.
SLAC Accelerator Department The PEP-II Accelerator John T. Seeman Assistant Director of the Technical Division Head of the Accelerator Department SLUO.
Name Event Date Name Event Date 1 LHC Upgrade We acknowledge the support of the European Community-Research Infrastructure Activity under the FP6 "Structuring.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
CERN F. Ruggiero CARE Steering Committee, CERN, 05/04/ 2004 High Energy High Intensity Hadron Beams CARE-HHH Network: coordinators: F. Ruggiero and W.
Name Event Date Name Event Date 1 CERN F. Zimmermann & W. Scandale HHH, CARE Meeting, Paris, April 17-18, 2007 High Energy High Intensity Hadron Beams.
HHH network Activity for the next 18 months Walter Scandale CERN CARE 06 Frascati, 16 November 2006.
Name Event Date Name Event Date 1 CERN W. Scandale & F. Zimmermann HHH, CARE 08, CERN, High Energy High Intensity Hadron Beams
Thoughts on crab cavity noise, Fritz Caspers, Bandwidth of cavity structure with loaded Q is nearly always MUCH higher than generator bandwidth.
Paris 5 September 2005 HHH Status progress W. Scandale CERN Accelerator Technology Department CARE-HHH Network: coordinators: F. Ruggiero and W. Scandale.
ESGARD NETWORK ACTIVITIES L. Rossi AT Division - CERN Workshop on Advanced Accelerator Magnets Archamps, F, March 2003.
FP7 - IA EUROLUMI Network Walter Scandale, Frank Zimmermann ESGARD-OMIA meeting CERN,
US LHC Accelerator Research Program Jim Strait For the BNL-FNAL-LBNL LHC Accelerator Collaboration DOE Meeting 18 April 2003 brookhaven - fermilab - berkeley.
1 BNL LARP Accelerator Physics Program Resources BNL role in national program BNL Accelerator Physics Program.
Global Design Effort ILC Crab Cavity Overview and requirements Andrei Seryi SLAC on behalf of ILC Beam Delivery and Crab-Cavity design teams Joint BNL/US-LARP/CARE-HHH.
J. Strait Fermilab 16 October 2006 Consideration on LHC upgrade from A US perspective.
Flat-beam IR optics José L. Abelleira, PhD candidate EPFL, CERN BE-ABP Supervised by F. Zimmermann, CERN Beams dep. Thanks to: O.Domínguez. S Russenchuck,
Joint IR Studies: Operating Margins Nikolai Mokhov Fermilab bnl - fnal- lbnl - slac US LHC Accelerator Research Program LARP Collaboration Meeting SLAC.
LHC-CC Validity Requirements & Tests LHC Crab Cavity Mini Workshop at CERN; 21. August Remarks on using the LHC as a test bed for R&D equipment.
Beam-beam compensation at RHIC LARP Proposal Tanaji Sen, Wolfram Fischer Thanks to Jean-Pierre Koutchouk, Frank Zimmermann.
08/11/2007M. Giovannozzi – CARE-HHH-APD IR’071 Optics issues for Phase 1 and Phase 2 upgrades Massimo Giovannozzi, CERN Outline: –Option for Phase 1 and.
Tentative conclusions. Beam parameters new parameter sets with acceptable electron cloud & pile-up events 25 ns spacing ultimate beam with low  * - may.
Introduction of Accelerators for Circular Colliders 高亮度 TAU-CHARM 工厂 & 先进光源, 2014/09.
Global Collaborations Towards LHC Crab Cavity J. P. Koutchouk Thanks to Rama Calaga and Rogelio Tomas Crab Cavity Validity Requirement Workshop August.
Name Event Date Name Event Date 1 CERN LHC Phase-II Upgrade Scenarios CERN-KEK Committee, 3 rd meeting, Friday 12 December CERN Lucio Rossi – CERN/AT.
Name Event Date Name Event Date 1 CERN Super-LHC We acknowledge the support of the European Community-Research Infrastructure Activity under the FP6 "Structuring.
Lucio Rossi The High Luminosity LHC Project Distinguished Lecturer 2013.
ODR Diagnostics for Hadron Colliders Tanaji Sen APC.
Turnaround time in modern hadron colliders & store-length optimization
Collision with a crossing angle Large Piwinski angle
The FCC Magnet Program seen from CERN Meeting at ASC-2014, Charlotte, August 13t, 2014.
CERN, 11th November 2011 Hi-lumi meeting
Operating IP8 at high luminosity in the HL-LHC era
ICE SECTION The coolest place to be! Elias Métral
contribution to the round table discussion
Energy deposition studies on magnets. Aim. First applications
LUMI06 preliminary conclusions
D0 and its integrability
WP3 status Interaction Region design
High Energy High Intensity Hadron Beams
PROPOSALS FOR HIGH INTENSITY – HIGH ENERGY PROTON BEAMS
Optimization of Triplet Field Quality in Collision
WP10.3 LHC Crab Cavities Overview EUCARD SRF Annual Review
Follow-up of HL-LHC Annual meeting
Why Study Electron Clouds? Methods and Tools to Study Electron Clouds
CLIC-ILC BDS & MDI work.
HEHIHB - WP1 Accelerator Magnet Technology
Machine Plans for the LHC Upgrade
LHC Accelerator Upgrade
CSP Meeting CERN CERN Accelerators in th November 2010
Jean-Pierre Koutchouk, Frank Zimmermann
Scenarios for the LHC Upgrade
Measurements, ideas, curiosities
Walter Scandale, Frank Zimmermann 18 January 2007
Possible Scenarios for an LHC Upgrade
CLIC damping rings working plan towards the CDR
Frank Zimmermann & Walter Scandale
SLHC-PP kick-off meeting, CERN 9 April 2008
Thursday Summary of Working Group I
High Energy High Intensity Hadron Beams
High Energy High Intensity Hadron Beams
LHC Machine Advisory Committee, CERN 12th June 2008
HE-JLEIC: Do We Have a Baseline?
Presentation transcript:

High Energy High Intensity Hadron Beams Network coordinated by W. Scandale and F. Zimmermann Input from L. Bottura, J.-P. Koutchouk, E. Laface, L. Rossi, D. Tommasini, K. Wittenburg, High Energy High Intensity Hadron Beams http://care-hhh.web.cern.ch/care-hhh/ HHH, CARE Meeting, Paris, April 17-18, 2007

HHH, CARE Meeting, Paris. April 17-18, 2007 CARE-HHH network Coordinate and integrate the activities of the accelerator and particle physics communities in a worldwide context, towards achieving superior High-Energy High-Intensity Hadron Beam facilities for Europe road map for the upgrade of the European accelerator infrastructure (LHC and GSI accelerator complex) coordinate activities and foster future collaborations dissemination and outreach WP1: Advancements in Accelerator Magnet Technologies (AMT) WP2: Novel Methods for Accelerator Beam Instrumentation (ABI) WP3: Accelerator Physics and synchrotron Design (APD) Participating institutes: CEA, CERN, CSIC-CIEMAT, CCLRC, DESY, GSI, INFN, PSI, TEU, WUT Associated institutes: CRPP, ENEA, TUBE, ESRF, UPSA, FZK, TEMF, US-LARP (BNL,FNAL,LBNL,SLAC), JINR, IHEP, KEK Additional collaborations: Texas A&M U., U. Geneva, U. Bologna F. Zimmermann & W. Scandale HHH, CARE Meeting, Paris. April 17-18, 2007

activities since CARE’06 Events: 3 HHH workshops held + HHH-US-LARP coordination meetings 8 further workshops/symposia planned Dissemination and outreach: presentations at 2 LHC-detector upgrade workshops, at 3 CERN & INFN management meetings, 3 departmental/project seminars 3 HHH workshop proceedings close to completion 3 articles published in CERN Courier HHH web sites maintained & developed Exchanges and education: several Russian, 2 US, and 1 EU accelerator physicist plus 3 representatives of European industry supported for HHH workshops 1 EU scientist supported for 2-week visit to CERN 5 doctoral students recruited for summer 2007: 3 EU summer students F. Zimmermann & W. Scandale HHH, CARE Meeting, Paris. April 17-18, 2007

HHH, CARE Meeting, Paris. April 17-18, 2007 workshops since CARE’06 4th CARE-HHH-ABI workshop on Simulation of BPM Front-End Electronics and Special Mechanical Designs,  Lüneburg, Germany, 30 November - 1 December 2006, Proceedings CARE-Conf-06-087-HHH Joint CARE-HHH-APD, CARE-ELAN, and EUROTeV mini-workshop on E-Cloud Clearing (ECL2), CERN, Geneva, 1-2 March 2007 CARE-HHH-APD mini-workshop on Crystal Channeling for Large Colliders: Machine and Physics Applications (CC-2007), CERN, 22-23 March 2007  F. Zimmermann & W. Scandale HHH, CARE Meeting, Paris. April 17-18, 2007

HHH, CARE Meeting, Paris. April 17-18, 2007 major presentations INFN CSN1 Meeting, Frascati, 28 November 2006 - “H8-RD22 Experiment to test Crystal Collimation for the LHC” W. Scandale LHCb Upgrade Workshop, Edinburgh, 11 January, 2007 - “LHC Upgrade Plan and Ideas - Scenarios and Constraints from the Machine Side,” invited talk, F. Zimmermann Joint AB & LHC Project Seminar, CERN, 18 January 2007 – “Baseline Scenario for the LHC Luminosity Upgrade, summary of the CARE-HHH LHC-LUMI-06 workshop” W. Scandale, F. Zimmermann ATLAS & CMS Detector Electronics Upgrade Workshop, CERN, March 2007 “Two Scenarios for the LHC Luminosity Upgrade” W. Scandale LHC Project Seminar, CERN, 15 March 2007 - “H8-RD22 Experiment to Test Crystal Collimation for the LHC” W. Scandale F. Zimmermann & W. Scandale HHH, CARE Meeting, Paris. April 17-18, 2007

deliverables & milestones compared with original plan (CARE’06) Stones (MS) and Intermediate Deliverables (ID). deliverables & milestones compared with original plan (CARE’06) 2004: HHH & HHH-APD web site => OK 2005: creation of first web-based beam dynamics code repository => OK http://oraweb.cern.ch:9000/pls/hhh/code_website.startup 2006: web based database for s.c. cables and magnets => OK, 40% complete http://sdb.web.cern.ch/sdb milestones: web reference for IR optics => OK http://care-hhh.web.cern.ch/care-hhh/SuperLHC_IRoptics/IRoptics.html booster synchrotron optics => delayed to 2007 structured list of intensity limits => nearing completion scaling laws for magnet and cryogenic cost => 2007 2 summer students + 1 doctoral student 1 summer student F. Zimmermann & W. Scandale HHH, CARE Meeting, Paris. April 17-18, 2007 The workshop on Coil Manufacturing Optimization was postponed to

Accelerator Magnet Technologies WP1: Advancements in Accelerator Magnet Technologies (AMT) F. Zimmermann & W. Scandale HHH, CARE Meeting, Paris. April 17-18, 2007

Superconductors Database (SDB) http://sdb.web.cern.ch/sdb database structure complete web interfaces complete since January’07 collaboration with FNAL and BNL on magnet & cable data sharing main work left to do: creation of automatic tools which import data from existing databases, e.g., for LHC, Tevatron and RHIC, to SDB core this last task will be completed with the help of two summer students in 2007 Courtesy E. Laface F. Zimmermann & W. Scandale HHH, CARE Meeting, Paris. April 17-18, 2007

HHH, CARE Meeting, Paris. April 17-18, 2007 SDB example Courtesy E. Laface F. Zimmermann & W. Scandale HHH, CARE Meeting, Paris. April 17-18, 2007

HHH, CARE Meeting, Paris. April 17-18, 2007 AMT activity OSOM design of 2 T pulsed superferric magnet, follow-up of ECOMAG cable and coil in the iron configured to minimize loss; conceptual design that dissipates less than 10 W/m in the superconducting coil, and a warm iron (i.e. negligible loss power); two variants: wide iron and compact version with correction coil, both suitable for a PS upgrade. other options also examined, such as transmission-line magnets using large current (typically 100 kA), and open gap magnets; these options were discarded because of practical issues (bending radius, magnet size); summary report within next few weeks [L. Bottura] also ongoing: comparison of s.c. and n.c. options for fast cycling “PS2” F. Zimmermann & W. Scandale HHH, CARE Meeting, Paris. April 17-18, 2007

HHH, CARE Meeting, Paris. April 17-18, 2007 AMT exchanges F. Broggi (Milano) visited CERN for 2 weeks in April to work on heat deposition in low-b region Primary goal: change of energy deposition versus distance  between triplet and IP. First study showed little dependence. Question byh US-LARP. Present activity: consolidate the conclusions and explore other parts of the parameter space; collaboration with C. Hoa/CERN on precise FLUKA description of IR1 and IR5, including exact magnetic fields (well advanced); set up a few PC's running the latest version of FLUKA (done); switch to latest FLUKA source (DPMJET), used at CERN; confirm the Valencia results with the latest descriptions, source and FLUKA version; prepare a study program of study showing parameter regions still to be explored;  investigate these (aperture, insertion length, crossing angle) [J.-P. Koutchouk] E. Laface visited FNAL & BNL for 1 week to coordinate work on s.c. database F. Zimmermann & W. Scandale HHH, CARE Meeting, Paris. April 17-18, 2007

HHH, CARE Meeting, Paris. April 17-18, 2007 planned AMT workshop 27-28 September: CARE-HHH-AMT workshop on Heat Generation and Heat Transfer in Superconducting Magnets (THERMOMAG’07), Paris, 2 days minimizing and evacuating heat in the next generation of superconducting magnets for high intensity particle accelerators, such as the IR magnet for the LHC luminosity upgrade and the fast cycling magnets for FAIR and for the LHC injector chain upgrade; identify the state of the art on (1) cooling techniques (fluids and regimes), (2) heat transfer mechanisms, (3) modeling of heat transfer from coils to cooling system, (4) heat transfer experiments; identify a common set of thermal design criteria F. Zimmermann & W. Scandale HHH, CARE Meeting, Paris. April 17-18, 2007

Accelerator Beam Instrumentation WP2: Novel Methods for Accelerator Beam Instrumentation (ABI) F. Zimmermann & W. Scandale HHH, CARE Meeting, Paris. April 17-18, 2007

HHH, CARE Meeting, Paris. April 17-18, 2007 4th ABI workshop 27 participants: 6 CERN, 7 DESY, 5 GSI, 1 CEA, 2 RAL, 2 Globes Electronics, 3 Kyocera, 1 FNAL topics: BPM sensors, BPM electronics, cold BPMs proceedings almost ready, will be published as CARE-Conf-06-087-HHH F. Zimmermann & W. Scandale HHH, CARE Meeting, Paris. April 17-18, 2007

HHH, CARE Meeting, Paris. April 17-18, 2007 planned ABI workshop End of 2007: HHH-ABI annual workshop on Tools for Diagnostic Systems at High-Intensity (Pre-) Accelerators; Emittance Preservation and Measurements in the Accelerator Chain, GSI, Germany F. Zimmermann & W. Scandale HHH, CARE Meeting, Paris. April 17-18, 2007

and synchrotron Design WP3: Accelerator Physics and synchrotron Design (APD) F. Zimmermann & W. Scandale HHH, CARE Meeting, Paris. April 17-18, 2007

HHH, CARE Meeting, Paris. April 17-18, 2007 CERN Courier 2, 2007 F. Zimmermann & W. Scandale HHH, CARE Meeting, Paris. April 17-18, 2007

LHC upgrade parameters 25 ns, smaller b* 50 ns, long transverse emittance 3.75 protons per bunch 1.7 4.9 bunch spacing 25 50 beam current 0.86 1.22 longitudinal profile Gauss Flat rms bunch length 7.55 14.4 beta* at IP1&5 0.08 0.25 full crossing angle 100 381 Piwinski parameter 0.60 2.5 peak luminosity 15.5 8.9 events per crossing 296 340 initial lumi lifetime 2.1 5.3 effective luminosity (Tturnaround=5 h) 3.6 3.5 4.6 6.7 e-c heat SEY=1.4(1.3) 1.04 (0.59) 0.36 (0.1) SR heat load 4.6-20 K 0.36 image current heat 0.33 0.78 gas-s. 100 h (10 h) tb 0.06 (0.56) 0.09 (0.9) D0 + crab wire comp. two LHC upgrade scenarios developed at LUMI’06: 25 ns and 50 ns spacing F. Zimmermann & W. Scandale HHH, CARE Meeting, Paris. April 17-18, 2007

HHH, CARE Meeting, Paris. April 17-18, 2007 upgrade bunch structures 25 ns 50 ns nominal ultimate & 25-ns upgrade 50-ns upgrade, no collisions @S-LHCb! 50-ns upgrade with 25-ns collisions in LHCb new alternative! new baseline! F. Zimmermann & W. Scandale HHH, CARE Meeting, Paris. April 17-18, 2007

HHH, CARE Meeting, Paris. April 17-18, 2007 luminosity evolution 25 ns spacing 50 ns spacing average luminosity initial luminosity peak may not be useful for physics F. Zimmermann & W. Scandale HHH, CARE Meeting, Paris. April 17-18, 2007

HHH, CARE Meeting, Paris. April 17-18, 2007 event pile up 50 ns spacing 25 ns spacing F. Zimmermann & W. Scandale HHH, CARE Meeting, Paris. April 17-18, 2007

HHH, CARE Meeting, Paris. April 17-18, 2007 25 ns, low b*, with leveling 50 ns, long bunches, with leveling events/crossing 300 run time N/A 2.5 h av. luminosity 2.6x1034s-1cm-2 150 14.8 h 2.9x1034s-1cm-2 75 9.9 h 26.4 h 1.7x1034s-1cm-2 assuming 5 h turn-around time F. Zimmermann & W. Scandale HHH, CARE Meeting, Paris. April 17-18, 2007

HHH, CARE Meeting, Paris. April 17-18, 2007 luminosity evolution with leveling 150 events / crossing 25 ns spacing 50 ns spacing average luminosity F. Zimmermann & W. Scandale HHH, CARE Meeting, Paris. April 17-18, 2007

HHH, CARE Meeting, Paris. April 17-18, 2007 dynamic b squeeze for 50-ns option DN150 F. Zimmermann & W. Scandale HHH, CARE Meeting, Paris. April 17-18, 2007

HHH, CARE Meeting, Paris. April 17-18, 2007 dynamic bunch length change for 50-ns option we might also reduce the charge/bunch and go for shorter bunches F. Zimmermann & W. Scandale HHH, CARE Meeting, Paris. April 17-18, 2007

HHH, CARE Meeting, Paris. April 17-18, 2007 IR upgrade optics “compact low-gradient” NbTi, b*=25 cm <75 T/m (Riccardo De Maria, Oliver Bruning) “modular low gradient” NbTi, b*=25 cm <90 T/m (Riccardo De Maria, Oliver Bruning) “low bmax low-gradient” NbTi, b*=25 cm <125 T/m (Riccardo De Maria, Oliver Bruning) standard Nb3Sn upgrade, b*=25 cm ~200 T/m, 2 versions with different magnet parameters (Tanaji Sen et al, Emmanuel Laface, Walter Scandale) + crab-waist sextupole insertions? (LNF/FP7) early separation with b*=8 cm, Nb3Sn includes D0; either triplet closer to IP or Q0; being prepared for PAC’07 (Jean-Pierre Koutchouk et al) compatible with 50-ns upgrade path F. Zimmermann & W. Scandale HHH, CARE Meeting, Paris. April 17-18, 2007

HHH, CARE Meeting, Paris. April 17-18, 2007 crab waist scheme initiated and led by LNF in the frame of FP7; first beam tests at DAFNE later in 2007 Hamiltonian minimizes b at s=-x/qc realization: add sextupoles at right phase distance from IP focal plane F. Zimmermann & W. Scandale HHH, CARE Meeting, Paris. April 17-18, 2007

HHH, CARE Meeting, Paris. April 17-18, 2007 phased LHC upgrade recent CERN management decision: early IR upgrade (“phase-1”): based on NbTi magnets, implemented ~2012 “low-gradient” large-aperture NbTi optics solutions developed by HHH are three good candidates IR optics selection by Lyn Evans in 2007; input from HHH studies more ambitious Nb3Sn upgrade and higher luminosity planned in a 2nd phase F. Zimmermann & W. Scandale HHH, CARE Meeting, Paris. April 17-18, 2007

HHH, CARE Meeting, Paris. April 17-18, 2007 ECL2 workshop 35 participants: 16 CERN (4 AB/ABP, 1 AB/OP, 7 AB/RF, 2 AT-VAC, 2 TS), 3 German enamel industry (Eisenwerke Dueker, Wendel Email), 4 US (BNL, Cornell, LBNL & SLAC), 1 KEK, others from European institutes (Astec, LNF, DESY, ANKA, U. Rostock, CELLS, U. Sannio, ESRF) topics: CERN NEG coating facility, motivation, technological solutions, simulations, beam measurements, impedance, - for PS2, SPS upgrade, LHC upgrade, CLIC & ILC F. Zimmermann & W. Scandale HHH, CARE Meeting, Paris. April 17-18, 2007

ECL2: solutions against electron cloud slotted vacuum chamber (W. Bruns) New! enamel electrodes (F. Caspers) New! electrete inserts (F. Caspers) New! NEG coating (P. Chiggiato) slotted chamber enamel-based electrode F. Zimmermann & W. Scandale HHH, CARE Meeting, Paris. April 17-18, 2007

HHH, CARE Meeting, Paris. April 17-18, 2007 CC-2007 topics: critical review of experimental results crystal production technologies application of bent crystals to LHC collimation system assessment of new crystals through experiments at SPS and Tevatron use of crystals for diffractive physics co-sponsored by INTAS 45 participants: INFN Genova, U. Ferrara, INFN Legnaro, PNPI Gatchina, IHEP Protvino, FNAL, JINR Dubna, INFN Frascati, INFN Roma, U. Manchester, U. Texas, F. Zimmermann & W. Scandale HHH, CARE Meeting, Paris. April 17-18, 2007

HHH, CARE Meeting, Paris. April 17-18, 2007 PRL article on 2006 SPS experiments published last week! including CARE acknowledgement SPS crystal collimation test F. Zimmermann & W. Scandale HHH, CARE Meeting, Paris. April 17-18, 2007

HHH, CARE Meeting, Paris. April 17-18, 2007 2007 crystal experiments 7 weeks of SPS runs allocated to collaboration Goals: test multi-strip crystals check the effect on ions verify their fragmentation and e.-m. dissociation  inside the crystal, test the effectiveness of crystal collimation for ILC Support: CARE-HHH , INTAS-CERN, INFN-NTA, Russian Foundation for Basic Research, CERN AB and AT Departments F. Zimmermann & W. Scandale HHH, CARE Meeting, Paris. April 17-18, 2007

HHH, CARE Meeting, Paris. April 17-18, 2007 APD exchanges R. De Maria (grad student) visited FNAL for 1 month in February-March to work on heat deposition in low-b region for NbTi “low-gradient” IR optics solutions Collaboration with N. Mokhov, US-LARP W. Scandale visited FNAL for 1 week in February to participate in Tevatron crystal experiment Two graduate students (U. Dorda, G. Sterbini) will participate in RHIC beam-beam compensation experiments for two weeks this June, in the frame of HHH/US-LARP collaboration F. Zimmermann & W. Scandale HHH, CARE Meeting, Paris. April 17-18, 2007

HHH, CARE Meeting, Paris. April 17-18, 2007 planned APD workshops CARE-HHH-APD CERN-GSI bi-lateral working meeting on Collective Effects–Coordination of Theory and Experiments, CERN, Geneva, Switzerland 1-5  October: CARE-HHH-APD event BEAM’07 , CERN - mini-workshop on LHC Injectors Upgrade & FAIR PS2, SPS enhancements, GSI upgrades - mini-workshop on LHC Beam Parameters Upgrade beam parameters and upgrade scenarios; e.g. bunch spacing, operation with large Piwinski angle, luminosity performance - Francesco Ruggiero Memorial Symposium (Oct. 3) 7-9 November: CARE-HHH-APD workshop on LHC IR Upgrade (LUMI'07), INFN Frascati, Italy new low-beta quadrupoles, detector-integrated dipoles and quadrupoles, crab cavities, wire compensation, experience with new DAFNE IR F. Zimmermann & W. Scandale HHH, CARE Meeting, Paris. April 17-18, 2007

Francesco Ruggiero Memorial Symposium 3 October 2007 during HHH-APD BEAM’07 Tentative speakers: S. Berg, C. Biscari, O. Bruning, W. Chou, M. Furman, K. Hirata, A. Mostacci, L. Palumbo, C. Petit-Jean-Genaz, S. Petracca, E. Picasso, W. Scandale, J. Thomashausen, F. Zimmermann ,… F. Zimmermann & W. Scandale HHH, CARE Meeting, Paris. April 17-18, 2007

Gantt chart for next 18 months AMT and ABI F. Zimmermann & W. Scandale HHH, CARE Meeting, Paris. April 17-18, 2007

Gantt chart for next 18 months APD F. Zimmermann & W. Scandale HHH, CARE Meeting, Paris. April 17-18, 2007

HHH, CARE Meeting, Paris. April 17-18, 2007 Conclusions numerous high-impact workshops focused activities in many frontier areas - crystal collimation, slim magnets, e-cloud suppression, low-angle crab cavities, beam-beam compensation, novel optics design schemes, fast cycling s.c. magnets, new beam diagnostics results benefit global accelerator community - code repository, s.c. database, intensity limits enhanced dissemination & training effort - mutual visits between partner labs, publications, seminars, web pages, summer students and graduate students HHH is “high-return investment for Europe” F. Zimmermann & W. Scandale HHH, CARE Meeting, Paris. April 17-18, 2007