RINGRID review meeting, , Brussels

Slides:



Advertisements
Similar presentations
State University – Higher School of Economics
Advertisements

Remote Instrumentation Services in Grid Environment BoF Session Session leaders: Marcin Płóciennik.
1 Project overview Presented at the Euforia KoM January, 2008 Marcin Płóciennik, PSNC, Poland.
CIRAS PROJECT OVERVIEW
Enabling Access to Sound Archives through Integration, Enrichment and Retrieval WP1. Project Management.
INGAS General Assembly, Oulu, 25&26 May 2011 INGAS INtegrated GAS Powertrain 1 INGAS 30 months meeting Oulu, 25&26 of May 2011 General Assembly Coordinator.
Identification of critical success factors for implementing NLLS, through collaboration and exchange of expertise IDENTIFY LLP-2008-RO-KA1-KA1NLLS.
S3 Project aim The main goal, thus expected result, of the S3 project would be to strengthen tools used for Structural Fund policies (SF), through the.
Helsinki Sept 2007 S.Galés ERA-NET Supporting Cooperation for research infrastructures in all S&T fields 7 th FP Call Capacity Work Program: Infrastructures.
EVALUATION AND QUALITY ASSURANCE STRATEGY PRESENTED BY DR SHYAM PATIAR.
RTD/E.2/JL1 CARERA THE IMPACT OF CAP REFORM ON THE EMPLOYMENT LEVELS IN RURAL AREAS Kick off meeting CRETE; 16 – 17 March 2006 Martin Greimel Project Officer.
All Hands Meeting DORII Deployment of Remote Instrumentation Infrastructure Norbert Meyer PSNC October 20, 2009, Garching.
Overview  Full project name: Remote Instrumentation in Next- generation Grids  Type of project: SSA  Project start date: October 1st, 2006  Project.
WP1 presentation Christian Jagersma Bucharest, 1-4 March 2010 Agentschap NL (NL Agency)
The Preparatory Phase Proposal a first draft to be discussed.
The next call FP Infrastructures-5. FP Infrastructures-5 Call outline (1) All fields of S&T are covered Publication date: 4 November 2004.
Coordinating EC Research Projects Paul Drath Singleimage Limited 3 Foundry Walk St Ives Cambs PE27 5FW phone fax
Reporting Guidelines (FP5) Karen Fabbri Scientific Officer Natural & Technological Hazards DG Research European Commission Brussels
EPOCA – 11. June EPOCAConsortiumOrganisation.
InWEnt | Qualified to shape the future1 Internet based Human Resource Development Management Platform Human Resource Development Programme in Natural Disaster.
1 THE CITY OF TOMORROW AND CULTURAL HERITAGE Thierry PROST EUROPEAN COMMISSION - DG RTD Directorate I - Preserving the Ecosystem Tel: +32/2/ Fax:
International Bureau of the BMBF - Creating international research and education networks 1 Jörn Sonnenburg/ Martine Bonin Brussels 24 September 2009 ERA.Net.
Dr. Cecilia Blasetti - Elettra ST Elettra I3 IA-SFS Managing team Role of scientific background Dr. Cecilia Blasetti Elettra - Sincrotrone Trieste iii.
LEONARDO TRANSFER OF INNOVATION PROJECT “MEDIA TECH: The future of media industry using innovative technologies ” No. LLP-LdV-ToI-11-CY Kick-off.
Why a co-ordination action about Enhanced Geothermal Systems ? P. Ledru & A. Genter Engine Launching Conference February 2006 Orléans, France Opening.
Enabling Access to Sound Archives through Integration, Enrichment and Retrieval Annual Review Meeting - Introduction.
JCN, Justice Cooperation Network European treatment and Transition management of High Risk Offenders.
FP7-Infra : Design studies for European Research Infrastrutures 1st October 2011 – 31st December 2014 Duration 39 months – Periods : 2 (month.
INFSO-RI Enabling Grids for E-sciencE Policy and International cooperation Fotis Karayannis, NA5 activity leader All Activity Meeting.
Number: TR/06/B/F/PP/ WASTE-TRAIN VOCATIONAL TRAINING, EDUCATION, CONVEYING INFORMATION ON UP-TO-DATE WASTE MANAGEMENT PRACTICES TO DECISION MAKERS/STAFF.
EGEE is a project funded by the European Union under contract INFSO-RI NA5 M. Heikkurinen NA5 Activity Manager All Activity Meeting, 13 th September.
1 Project Coordinators’ meeting March 2010 NATIONAL TEMPUS OFFICES (NTOs) & HIGHER EDUCATION REFORMS.
EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks NA5: Policy and International Cooperation.
Co-ordination & Harmonisation of Advanced e-Infrastructures for Research and Education Data Sharing Research Infrastructures – Grant Agreement n
H. PERO, E uropean Commission European policy developments and challenges in the field of Research Infrastructures.
EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks NA5: Policy and International Cooperation.
2. The funding schemes ICT Proposer’s Day Köln, 1 February 2007 The ICT Theme in FP7 How to participate to ICT in FP 7.
Promoting Apulian participation in FP7 18th January 2008 ARTI Regional Agency for Technology and Innovation Mrs Rosanna Giannini Mr Paolo Zupa (Consultant)
WP3: Excellent researchers for the community Institutional framework for development of the third mission of universities in Serbia (IF4TM) Coordination.
Brussels, January 16th, Overview and status of the project.
ARIES WP2 Task 2.2 kick-off Coordination, support and enhancement of communication/outreach activities for accelerators in Europe Jennifer Toes (CERN),
AMICI WP1 – Management, coordination and dissemination
WP3 - Evaluation and proposal selection
BENCH-CAN Internal evaluation 2nd semester
NA5: Policy and International Cooperation
Year One: Project implementation overview
PSCE Conference Athens 23th November 2016
The OIE report 30th VICH SC Meeting / 4th VICH Outreach Forum Meeting
WP1 - Consortium coordination and management
PLANNED ACTIONS – UPCOMING DUTIES
WP 7 – Dissemination and Network Development
Support- IRDiRC Proposed Work Plan And Communication Strategy
FROM GAPS TO CAPS Risk Management Capability Based on Gaps Identification in the Baltic Sea Region (BSR)
EAFIP Athens 19th October 2016
IP Awareness and Enforcement: Modular Based Actions for SMEs
Modernization Maturity Model and Roadmap
A&M Workplan Objectives
WP5: Dissemination, studies, web portal and tools
Wrap-up & discussion EOSC Governance Development Forum workshop:
Background CRiteria for the IDentification of Groundwater thrEsholds BRIDGE Project Presentation Contract N° (SSPI) Co-ordinator: BRGM (Fr)
ENTSO-E IT project for Fundamental Electricity Data Transparency
WP2 Governance Per Öster
Coventry, Jun, 2016 – Coordination of activities related to WP3 –
DIRECT – DIsaster REsilient Communities and Towns
AMICI WP1 – Management, coordination and dissemination
CHAIN KoM – Rome, 13 December 2010
Background CRiteria for the IDentification of Groundwater thrEsholds: BRIDGE Co-ordinator: BRGM (Fr) Groundwater Characterisation workshop, 25 June 2004.
WP 1 Management and Coordination
Executive Project Kickoff
Presentation transcript:

RINGRID review meeting, 2007-04-27, Brussels Norbert Meyer, PSNC RINGRID review meeting, 2007-04-27, Brussels

RINGRID review meeting, 2007-04-27, Brussels Outline Overview Objectives Project structure Management Fulfilment of actions to reach objectives Plans Summary RINGRID review meeting, 2007-04-27, Brussels

RINGrid Overview Remote Instrumentation in Next-generation Grids Call: FP6-2005-Infrastructures-7 Specific Support Action Contract No.: 031891 18 months: from 1st October 2006 – 31 March 2008 12 partners 10 partners until January 2007 Budget: 999 165 Euro EC contribution: 770 650 Euro (77 %) RINGRID review meeting, 2007-04-27, Brussels

RINGRID review meeting, 2007-04-27, Brussels Participants 10 partners, 3 continents RINGRID review meeting, 2007-04-27, Brussels

RINGRID review meeting, 2007-04-27, Brussels Objectives Identification of instruments and user communities, definition of requirements Synergy between remote instrumentation and next- generation high-speed communications networks and grid infrastructures New generation e-Infrastructure Trend analysis and recommendations for designing next- generation remote instrumentation services Promoting egalitarian access to European e- Infrastructure opportunities Dissemination of project results to scientific and business groups of users RINGRID review meeting, 2007-04-27, Brussels

RINGRID review meeting, 2007-04-27, Brussels Interactivity Interactive access to equipment is under special attention in this project Links to other projects, e.g. Int.eu.grid (interactivity), GridCC (instrumentation) Not only labour equipments, but also instruments like sensors, drivers of future infrastructure and future applications RINGRID review meeting, 2007-04-27, Brussels

RINGRID review meeting, 2007-04-27, Brussels Workpackages WP1 - Project management WP2 - Identification of instruments and user communities, definition of requirements WP3 - Evaluation and requirements for infrastructures WP4 - Future emerging trends and recommendations WP5 - Dissemination, standardisation and cooperation with other projects WP6 - Prototyping and verification RINGRID review meeting, 2007-04-27, Brussels

RINGRID review meeting, 2007-04-27, Brussels Time schedule M6 M12 M18 M3 M5 M7 M9 START END WP2 WP3 WP4 WP6 WP5 WP1 RINGRID review meeting, 2007-04-27, Brussels

Dependencies between Activities WP5 Project awareness and dissemination WP4 Future emerging ternds and recommendations WP3 Evaluation and requirements for infrastructures WP6 Prototyping and verification WP2 Identification of instruments and user communities WP1 Project Management EC Project Officer Managerial dependencies Work flow Dissemination information Started in Apr ‘07 Started in Dec ‘06 RINGRID review meeting, 2007-04-27, Brussels

RINGRID review meeting, 2007-04-27, Brussels Project lifetime definition of requirements infrastructure evaluation identification of instruments new users requirements new requirements future emerging trends and recommendations Conceptual design Adopting existing ‘black boxes’ Finding out the missing functionality Verification Use cases Influencing policy groups: e-IRG ETWG, OGF, ... prototyping and verification RINGRID review meeting, 2007-04-27, Brussels

RINGRID review meeting, 2007-04-27, Brussels Criteria of Success (1) Definition of recommendations and guidelines for the development of new user access solutions to Remote Instrumentation environments [deliverable WP4, month 11] Guidelines for the development of grid infrastructures for Remote Instrumentation environments [deliverable WP4, month 12] Establishing an OGF research/working group, which will focus on issues related to integration remote instrumentation with grid BOF RISGE (Remote Instrumentation Services in a Grid Environment ) OGF20 in Manchester, our session is on May 9th (Wedn) Later – RISGE research group RINGRID review meeting, 2007-04-27, Brussels

RINGRID review meeting, 2007-04-27, Brussels Criteria of Success (2) Organisation of seminars and workshops on emerging technology trends, combined with an international or national conference - guidelines for future research in this field (all WPs, at least 2 seminars) INGRID 2007 – Instrumenting the GRID (April 2007) Influencing the roadmap and development of eInfrastructure in Europe (contribution to e-IRG white papers) 3 partners in e-IRG (GUP, GRNET, PSNC) Identification of new groups of users related to scientific instruments (at least 2, month 5) Done Positive feedback received from two group of users related to the prototype based on conceptual design (month 18). RINGRID review meeting, 2007-04-27, Brussels

RINGRID review meeting, 2007-04-27, Brussels Project management (WP1) RINGRID review meeting, 2007-04-27, Brussels

RINGRID review meeting, 2007-04-27, Brussels Management Structure RINGRID review meeting, 2007-04-27, Brussels

RINGRID review meeting, 2007-04-27, Brussels Executive Board Coordination: Franco Davoli (CNIT) One representative of each partner 2 Meetings October 2006 (Poznań), April 2007 (Santa Margherita) 1 electronic vote – Amendment of the core contract Overall direction of the project Quorum – 7 partners present Decisions in most cases taken by majority of votes In special cases: unanimously, all partners present RINGRID review meeting, 2007-04-27, Brussels

External Advisory Board RINGRID review meeting, 2007-04-27, Brussels Independent experts: Roberto  Pugliese (ELETTRA, IT) Vasilis Maglaris (NTUA, GR) T. Charles Yun, (JIVE, NL) The first meeting with EAB is planned during the second RINGRID meeting (Sept. 2007) RINGRID review meeting, 2007-04-27, Brussels

RINGRID review meeting, 2007-04-27, Brussels Technical Committee Activity leaders: Franco Davoli (WP4) Yuri Kalvachev (WP2) Costas Kotsokalis (WP6) Thomas Prokosch (WP3) Marcin Lawenda (WP5) Norbert Meyer (coordinator) Meets every month – 7 meetings F2F meetings, teleconferences Management of technical aspects of the project Co‑ordination of work and information flow between activities Organization of periodical meetings for reviewing the overall technical progress and organization of work Recommendation and requesting changes in the project plan Defining the structure of deliverables Preparation of final project reports RINGRID review meeting, 2007-04-27, Brussels

RINGRID review meeting, 2007-04-27, Brussels Quality Assurance D1.1 - Quality Assurance Plan And Risk Assessment The following quality objectives are defined in the scope of this project: All deliverables are to be handled in on time and subjected to a review process, so that their contents can be found satisfactory both by Project Management and by the European Commission All RINGrid Partners should follow the same set of conventions and metrics All reviews are to be conducted at the scheduled times and their results are expected to be satisfactory, as defined in the objectives of each review. RINGRID review meeting, 2007-04-27, Brussels

Quality Assurance (cont.) RINGRID review meeting, 2007-04-27, Brussels Deliverable review process schema Established internal review team RINGRID review meeting, 2007-04-27, Brussels

RINGRID review meeting, 2007-04-27, Brussels Managerial Report (Month6, draft version) RINGRID review meeting, 2007-04-27, Brussels

Managerial Report (draft version) RINGRID review meeting, 2007-04-27, Brussels

Managerial Report (cont.) RINGRID review meeting, 2007-04-27, Brussels

Managerial Report (cont.) RINGRID review meeting, 2007-04-27, Brussels

10 Deliverables released on time Fulfilment of Actions to Reach Objectives 10 Deliverables released on time Project web page available since the begining General folder & leaflet Presentations on several national and international conferences: Europe, Asia, South America Present on Supercomputing 2006 exhibition Tampa, U.S., Nov. 2006 Local dissemination activities Co-organised INGRID 2007 RINGRID review meeting, 2007-04-27, Brussels

RINGRID review meeting, 2007-04-27, Brussels Three days workshop, 70+ participants Focused on research instrumentations Presentations & demos Conference proceedings to be published by Springer RINGRID review meeting, 2007-04-27, Brussels

Fulfilment of Actions to Reach Objectives Kick-off meeting (Oct. 2006) – Poznań (PSNC) First general meeting (April 2007) – Santa Margerita (CNIT) RINGRID review meeting, 2007-04-27, Brussels

RINGRID review meeting, 2007-04-27, Brussels Deliverables Review of results: WP2, WP3, WP5, WP1 D1.1 Quality assurance plan and risk assessment D1.2 Activity report and plan for using and disseminating knowledge D1.3 Activity and management report (Month6 - draft version) D2.1 List and description of European and non-European institutions - owners of the scientific instruments with the potential of applying remote instrumentation philosophy. Identification list and description of potential beneficiaries (institutes) of access to identified remote instrumentation. D2.2 Creation of data base with information collected in D2.1 D2.3 Formal specification of requirements defined by potential end-users and instrumentation owners, identified in D.2.1 D3.1 State of the art in (research) networks and grid infrastructures with respect to remote instrumentation D5.1 Dissemination and exploitation plan D5.2 RINGrid Web Pages finished D5.3 Project leaflet/brochure WP1 WP2 WP3 WP5 RINGRID review meeting, 2007-04-27, Brussels

RINGRID review meeting, 2007-04-27, Brussels Next Steps BOF at OGF20 (Manchester, May 2007) Remote Instrumentation Services in a Grid Environment (RISGE) Joint booth of RINGrid, GRIDCC, int.eu.grid, gEclipse Partners of RISGE research group General meeting in IASI (Sep. 2007) to summarise the actions done by WP3 and WP4 to establish the project architecture to define use cases of the prototype and verification phase (WP6) IMEKO conference (Sept. 2007) - RINGRID session 1Q2008 – Prototype and verification phase – meeting March 2008 – to collect feedback from the group of users RINGRID review meeting, 2007-04-27, Brussels

RINGRID review meeting, 2007-04-27, Brussels Summary Deliverables on time Collected requirements from users State of the art. – e-Infrastructure Two project F2F meetings INGRID 2007 – Instrumenting the Grid Accepted BOF at OGF20 Defined next steps and actions RINGRID review meeting, 2007-04-27, Brussels

RINGRID review meeting, 2007-04-27, Brussels Thank YOU ! www.ringrid.eu meyer@man.poznan.pl RINGRID review meeting, 2007-04-27, Brussels