L. Benussi On Behalf of LNF crew

Slides:



Advertisements
Similar presentations
Kondo GNANVO Florida Institute of Technology, Melbourne FL.
Advertisements

KLOE II Inner Tracker - FEE Status Antonio Ranieri RD51 Collaboration Meeting Paris October 2008 INFN-Bari S ervizio E lettronico L aboratori F rascati.
Muon Tracking FEE R.E. Mischke Los Alamos 10 September, 1999 presentation to the PHENIX Muon Arm Technical Advisory Committee.
Large Area, High Speed Photo-detectors Readout Jean-Francois Genat + On behalf and with the help of Herve Grabas +, Samuel Meehan +, Eric Oberla +, Fukun.
Design and test of a high-speed beam monitor for hardon therapy H. Pernegger on behalf of Erich Griesmayer Fachhochschule Wr. Neustadt/Fotec Austria (H.
GEM Design Plans Jason Gilmore TAMU Workshop 1 Oct
Panda PCB for prototype status report by D Malkevich on behalf of the ITEP group ITEP.
U niversity of S cience and T echnology of C hina Design for Distributed Scheme of WCDA Readout Electronics CAO Zhe University of Science and Technology.
25/05/2010 RD51 Collaboration Meeting Cisbani-Musico-Minutoli / Status JLab Electronics 1 Status of the APV25 electronics for the GEM tracker at JLab Evaristo.
Gif++ CR tracker setup G. Aielli for the RPC collaboration.
VC Feb 2010Slide 1 EMR Construction Status o General Design o Electronics o Cosmics test Jean-Sebastien Graulich, Geneva.
DE/dx measurement with Phobos Si-pad detectors - very first impressions (H.P Oct )
25/05/2010 RD51 Collaboration Meeting Cisbani-Musico-Minutoli / Status JLab Electronics 1 Status of the APV25 electronics for the GEM tracker at JLab Evaristo.
GE1/1 GEM technology - High trigger performance during of late Phase I and throughout Phase II -Demonstrator in YETS2016 approved Plan for installation.
GEM chambers for SoLID Nilanga Liyanage University of Virginia.
F. Sabatié Slides from D. Attié, S. Procureur June 18 th, 2014 Forward-Tagger Tracker – Status & Plan – – Status & Plan –
GEM R&D Update Kondo Gnanvo. Outline  GEM R&D and assembly facilities at UVa  Cosmic test results  Update on the 40 × 50 cm 2 GEM prototype  Plans.
QCAL upgrade status FE electronic replacement actual status future design test E. Santovetti KLOE General meeting December 2002.
AMS HVCMOS status Raimon Casanova Mohr 14/05/2015.
Update on the Triple GEM Detectors for Muon Tomography K. Gnanvo, M. Hohlmann, L. Grasso, A. Quintero Florida Institute of Technology, Melbourne, FL.
Total Cross Section, Elastic Scattering and Diffraction Dissociation at the LHC January 17, 2003TOTEM plenary meeting -Marco Bozzo1 CSC detectors for T1.
SoLiD/PVDIS DAQ Alexandre Camsonne. DAQ limitations Electronics Data transfer.
Status of the Cylindrical‐GEM project for the KLOE‐2 Inner Tracker Danilo Domenici (INFN-LNF) on behalf of the KLOE-2 collaboration Villa Olmo, Como –
Readout Architecture for MuCh Introduction of MuCh Layout of Much ( proposed several schemes) Read ASIC’s Key features Basic Readout chain ROC Block Diagram.
09/10/2010 RD51 Collaboration Meeting Cisbani-Musico-Minutoli / Status JLab Electronics 1 Status of the APV25 electronics for the GEM tracker at JLab Evaristo.
NA62 straw readout Characterization and qualification of the frontend electronics Detector and interface to frontend Small readout system Plans Expected.
Quality control for large volume production GEM detectors Christopher Armaingaud On behalf of the collaboration GEMs for CMS.
Front Tracker: main technical solutions 40x50 cm 2 module Front Tracker Chamber: 40x150 cm 2  Use COMPASS approach: 3xGEM, 2D readout - one significant.
11 October 2002Paul Dauncey - CDR Introduction1 CDR Introduction and Overview Paul Dauncey Imperial College London.
GEM R&D updates from Chinese groups Yuxiang Zhao University of Science and Technology of China May 24,
Status of the PSD upgrade - Status of the PSD cooling and temperature stabilization system - MAPD gain monitoring system - PSD readout upgrade F.Guber,
PSD upgrade: concept and plans - Why the PSD upgrade is necessary? - Concept of the PSD temperature stabilization and control - Upgrade of HV control system.
RD51 GEM Telescope: results from June 2010 test beam and work in progress Matteo Alfonsi on behalf of CERN GDD group and Siena/PISA INFN group.
Results on a Large Area triple-GEM Detector at LNF 5 th RD51 Collaboration Meeting Freiburg, 25 May 2010 D. Domenici - LNF.
05/12/2014 Gerrit Jan Focker, BE/BI/PM 1 PSB-Injection H - and H 0 Dump detectors and Stripping Foil current measurement.
Update on works with SiPMs at Pisa Matteo Morrocchi.
Upgrade of the MEG liquid xenon calorimeter with VUV-light sensitive large area SiPMs Kei Ieki for the MEG-II collaboration 1 II.
NSS2006Shengli Huang1 The Time of Flight Detector Upgrade at PHENIX Shengli Huang PHENIX Collaboration Outlines: 1.Physics motivations 2.Multi-gap Resistive.
FEE for Muon System (Range System) Status & Plans G.Alexeev on behalf of Dubna group Turin, 16 June, 2009.
G.F. Tassielli - SuperB Workshop XI LNF1/11 02/12/2009 Status report on CLUster COUnting activities G. F. Tassielli on behalf of CLUCOU group SuperB Workshop.
Flex Cable Readout unit Si Sensor 256 analog lines Interconnect board NCC signal packaging concept PA board -This is the calorimeter – all pads in the.
1 Projectile Spectator Detector: Status and Plans A.Ivashkin (INR, Moscow) PSD performance in Be run. Problems and drawbacks. Future steps.
Status of Prototype Preparation (I) Wander Baldini On behalf of the Ferrara SuperB group SuperB Workshop, LNF Dic. 2-nd 2009.
A. Calcaterra, R. de Sangro, G. Felici, G. Finocchiaro, P. Patteri, M. Piccolo INFN LNF XIII SuperB General Meeting DCH-I parallel session Elba, 30 May.
Trigger & Tracking detector for CMS
Status of hardware activity in CNS Taku Gunji Center for Nuclear Study University of Tokyo 1.
TOTEM CSC construction and Quality Control Status report A.Krivshich Petersburg Nuclear Physics Institute March 07, 2006 CERN.
A High Eta Forward Muon Trigger & Tracking detector for CMS A High Eta Forward Muon Trigger & Tracking detector for CMS Archana Sharma For CMS High Eta.
G. Drake Electronics for DHCAL R&D Oct. 13, 2005 p. 1.
GEM Integrated PCB readout and cooling
“Medium Term”: VFAT2 + SRS readout system
Work on Muon System TDR - in progress Word -> Latex ?
Results with the RPC system of OPERA and perspectives
KLOE II Inner Tracker FEE
FEE for TPC MPD__NICA JINR
Jinfan Chang Experimental Physics Center , IHEP Feb 18 , 2011
Results achieved so far to improve the RPC rate capability
A proposal to equip the high eta muon stations with High Rate GRPC
GRAND instrumental challenges
KRB proposal (Read Board of Kyiv group)
On behalf of the GEMs for CMS Collaboration
Tassielli G.F. INFN Lecce & Università del Salento
M. Alexeev on behalf of Torino TIGER Test Group
Status of the Front Tracker GEM
   Calorimetry et al.    SUMMARY 12 contributions Tile HCAL
Alberto A. Colavita, INFN, TS
Beamstrahlung Monitor
RPC FEE The discriminator boards TDC boards Cost schedule.
Electronics for the PID
A DLC μRWELL with 2-D Readout
Presentation transcript:

L. Benussi On Behalf of LNF crew Readout R&D @ LNF L. Benussi On Behalf of LNF crew

Main LNF activities on GE1/1 Studies on alternative gas mixtures Studies on different GE1/1 gap size Studies on GE1/1 material ageing (on going at Studies on GEM foils tensioning (see Moire slides) Studies on readout optimization and strips layout(?)

Alternative gas mixtures studies HOW-TO Use a small 10X10 cm2 GEM chamber (Allow fast gas exchange) ✓ DAQ fast high sample (2 GHz) digital oscilloscope. (Allow precise signal recording and detailed offline analysis) ✓ Good time resolution trigger (<1ns) ✓ FEE with high gain and analog readout (presently the GEM signal is amplified by means of a VME amplifier) ✗ Low noise (as much as possible…) readout. ✗

Work in Progress items FEE with high gain and analog readout ✗ Low noise (as much as possible…) readout. ✗ In collaboration with Tonio we have designed a dedicated PDB readout board for a 10X10 cm2 GEM chamber. This board integrates a board designed by Bari for the GASTONE analog chip, and an improved version of the default 10X10 cm2 Rui’s readout board. The PDB board as X-Y readout. One view is done with strips. The other one is done with pads read trough vias (a la Kloe). Improved shield and grounding will ensure low external noise pick-up. The GASTONE chip analog version allow single strip readout and has an high gain, with an integration time of 90ns. It has also a relative low internal noise. It is the only chip that presently allow single strip readout.

PBC layout Improved strip readout shielding and grounding X-Y readout a la Kloe GASTONE board

PCB layout The PCB layout as been finalized and is now read to be sent to the firm for production We will ask to produce 3 – 5 boards. A survey of possible interested firms has been already done. The cost ranges around 2 k€

Issues The availability of GASTONE chips is limited. We have 4 chip, Bari has 15 chips but they want to use them to instrument 3 eta partition of their GE1/1-IV prototype (12 chips). However 4 chips allow us to fully readout one single view (Y or X) We have to discuss if it is reasonable to find money for a new GASTONE analog chip production.

Why? We will improve the results obtained so far both from S/N ratio both in terms of DAQ rate and data quality. Better grounding and shielding improve S/N. Fully 10X10 readout improve statistics and speed up DAQ rate (at least a factor 3 from present situation). Integrated PCB (X-Y and GASTONE boards) remove connectors and cables, sources of external noise pick-up. High GASTONE gain increase our sensitivity on low amplitude signals. High GASTONE gain allow better S/N ratio discrimination during offline analysis. There are no other possible solution on the market!!