SPMU Details Sl. No. Post under NHP Name Designation 1.

Slides:



Advertisements
Similar presentations
PCU OFFICE HOD OFFICE PROCESS FOR RELEASE OF FUND DDO OFFICE.
Advertisements

Karnataka Watershed Development Project Financial Management Arrangements.
1 Process of Data entry in Budget Proformae. 2 Outline General Instructions Proforma – A:Receipts Proforma – B1:Expenditure Non Plan Proforma – B2:Expenditure.
CENTRAL WATER COMMISSION. Hydrology Project Phase-I  To establish a functional hydrological information system.  To improve institutional capacity 
OBJECTIVES OF PMS  PMS is a web based application for monitoring progress of all projects undertaken by CPWD  Monitoring of projects both at pre and.
Funding for a brighter tomorrow 1 POWER SECTOR CONCLAVE 14th – July Avkash Saxena General Manager (APDRP) Power Finance Corporation Ltd. Restructured.
Govt. Engineering College Kozhikode TEQIP –II VII th Review meeting th April 2015.
IRCC Orientation Programme Life cycle of a Sponsored Project.
 PPP Projects ◦ Re structuring of Brownfield Airports (Delhi & Mumbai Airports) ◦ Greenfield Airports (Hyderabad & Bangalore Airports)  AAI Projects.
Capacity Building Capacity building for financial Management Integral part for effective and efficient functioning of Financial Management Unit. Needs.
HOW TO WRITE A BUDGET…. The Importance of Your Budget Preparation of the budget is an important part of the proposal preparation process. Pre-Award and.
Field Visit to DPO-Khurda Team-I M.P.,Gujarath,Jharkand,U.P., Chattisgarh,Nagaland, Chandigarh,Daman&Diu Shri Gopalan, Consultant,Edcil.
Presentation on Financial and Procurement Procedure to be followed by the Institute Management Committees.
A WORKSHOP ON FINANCIAL MANAGEMENT IN HYDROLOGY PROJECT – PHASE-II Gujarat Water Resources Development Corporation Ltd. GWRDCGANDHINAGAR (GW Component.
DINALEDI CONDITIONAL GRANT: RD QUARTER PERFORMANCE.
National Portal for Sarva Shiksha Abhiyan - RTE 15 th July, 2013 Annexure H.
Mid Day Meal Scheme AWP&B Arunachal Pradesh.
Paulius Baniūnas Ministry of Finance of the Republic of Lithuania EU Structural Support Management Department Monitoring and Analysis Division SYSTEM OF.
National Hydrology Project The Way Forward Dr. Amit Prasad 15 th September, 2015, New Delhi.
PRTR Project reporting Steering Committee Meeitng and Inception Workshop PRTR Project November 2015 UNITAR/GEF/PRTR2/SCM1 Pre 10.
Ministry of Finance Financial management and control of the Operational Programmes, co- financed under the Structural funds and the Cohesion fund of EU.
National Hydrology Project Orientation Workshop 9 th May, 2016, New Delhi.
Welcome. Contents: 1.Organization’s Policies & Procedure 2.Internal Controls 3.Manager’s Financial Role 4.Procurement Process 5.Monthly Financial Report.
National Hydrology Project Dr
National Hydrology Project World Bank Mission at Bengaluru (17th and 18th of August 2017) Kerala SW.
Review of Implementation of Smart Cities Mission
Treasury of the Republic of Kazakhstan
GOVERNMENT OF TELANGANA Irrigation & CAD Department
National Hydrology Project
NATIONAL HYDROLOGY PROJECT.
GOVERNMENT OF ANDHRA PRADESH GROUND WATER AND WATER AUDIT DEPARTMENT
National Hydrology Project (NHP) NATIONAL INSTITUTE OF HYDROLOGY
National Hydrology Project
National Hydrology Project
WEL COME 1st World Bank Mission under the National Hydrology Project
First World Bank Mission. FIRST WORLD BANK MISSION
Proposals for State: ……..
Geo-spatial Products, Services and Applications
NHP National Hydrology Project Surface Water CHHATTISGARH.
Introduction/Background Aim of the assessment was to assess the impact of the 3 institutions MOHCDGEC, PO-RALG and MOFP in the flow of funds from national.
NATIONAL HYDROLOGY PROJECT
National Hydrology Project
Implementation of the IPS MDTF
BUDGET Process Change Description Type of Change Process
THIRD PARTY INSPECTION BY QUALITY SUPERVISION CONSULTANTS
NATIONAL HYDROLOGY PROJECT
Ministry of Water Resources, River Development and Ganga Rejuvenation
Ministry of Finance of the Republic of Azerbaijan
Implementation Arrangement under National Hydrology Project
National Hydrology Project
Gujarat National Hydrology Project Surface Water & Ground Water
Central Ground Water Board
National Hydrology Project
GROUNDWATER DEPARTMENT - KERALA
National Hydrology Project
BHAKRA BEAS MANAGEMENT BOARD
PUBLIC PROCUREMENT SYSTEM IN UZBEKISTAN
Details of SPMU (in position), Staff Strength etc
1st World Bank Mission under the National Hydrology Project
Status of Odisha Surface Water under NATIONAL HYDROLOGY PROJECT
City:- Corporation of City of Panaji
ANNUAL WORK PLAN & BUDGET ANDAMAN AND NICOBAR ISLANDS
PAB-MDM Meeting-National Informatics Centre (NIC)
SUSTAINABLE ENERGY INDUSTRY DEVELOPMENT PROJECT (SEIDP)
NATIONAL HYDROLOGY PROJECT
PAB Meeting on National Portal for Mid Day Meal Scheme
PRESENTATION ON THE FINANCIAL MANAGEMENT INFORMATION 3rd QUARTER IRO 2007/ FEBRUARY 2008.
Housing & Urban Development Department Government of Odisha
New Bedford Public Schools
ANNUAL WORK PLAN & BUDGET ANDAMAN AND NICOBAR ADMINISTRATION
Presentation transcript:

SPMU Details Sl. No. Post under NHP Name Designation 1. Project Co-ordinator Shri S. K. Sinha Executive Director (Civil) 2. Nodal Officer Shri S. B. Pandey Dy. Chief Engineer (Civil), Water Resources 3. Sr. Water Management Expert Shri Bijay Sarkar Dy. Chief Engineer (Civil), Engineering & Planning 4. Superintending Officer Shri S. K. Maji Superintending Engineer (Civil) & Manager, Reservoir Operations 5. Hydrologist Md. Nasim Ansari Executive Engineer (Civil) 6. Hydro-Met Instrumentation Expert Shri Dipankar Ghosh 7. Accounts Officer Shri Ramjee Pandey Dy. Manager (Finance) 8. Data-based Management Expert Shri Atul Kumar Singh Assistant Engineer (Civil) 9. Data Entry Operator Md. Abdul Rahman Jr. Clerk cum Typist Note: In addition to members of the SPMU (in position), there are 10 nos. of Officers / Staffs associated with NHP.

Status of Fund (Qtr. Ending 30th June, 2017) Rs. in Lakh Financial Year Funds Received Expenditure made Financial Progress 2016-17 30.87 6.08 20 % 2017-18 209.00 + 24.79* 233.79 14.85 Target Q1-58.45 15% in Q1 Expenditure made 6.08 Expenditure made in Q1 Fund Received *Balance of FY: 2016-17 which was revaluated for FY: 2017-18 Up-to-date Committed expenditure : Rs. 5 Lakh Bid document for Hydrology Control Room was sent to NPMU on 27.01.17. NOL was received on 22.03.17. NIT was floated on 14.06.17 and opened on 17.07.17. There was no response & it was re-tendered on 19.08.2017.

Major Procurement Items in PIP in Rs. lakh Sl. No. Item Code Item Amount 1. A1.1.01 RTDAS for DVC 726.80 2. A1.1.02 Real Time Monitoring System for M & I Water Supply 250.00 3. A1.5.01 Construction of Water Quality Lab and its furnishing 300.00 4. A1.6.01 Water Quality Lab Equipments 5. A3.1.01 Construction of Hydrological Data Centre of DVC 6. A1.10.01 Integrated Reservoir Monitoring of 04 nos. of DVC’s Dams which are at Maithon, Panchet, Konar and Tilaiya in the state of Jharkhand 347.64 7. C1.2.01 Inflow Forecasting system and Stream Flow measurement for Damodar Basin upto outfall of Damodar River 8. C2.3.01 Sedimentation Survey of 04 nos. Reservoirs of DVC 80.00

Major Procurement Items in AWP 2016-17 Sl. No. Item Code Item Total Allocated Fund (INR lakhs) Amount kept in FY: 2016-17 Status 1. A1.5.01 Construction of Water Quality Lab and its furnishing 300.00 3.00 The fund was received in Feb., 2017. As such, administrative and technical sanction could not be arranged and NIT could not be floated. 2. A3.1.01 Construction of Hydrological Data Centre of DVC 250.00 “do”

Major Procurement Items in AWP 2017-18 Sl. No. Item Code Item Total Allocated Fund (INR lakhs) Amount kept in FY: 2017-18 Status 1. A1.1.01.01 RTDAS for DVC 726.80 200.00 Hydromet sites have been finalized in consultation with CWC on 21.07.2017 and the final bid document will be submitted by 31.08.2017 for prior review 2. A1.1.01.02 Procurement of server of RTDAS 10.00 Procured and installed successfully. In operation w.e.f. 20.07.2017. 3. A1.1.02.01 Procurement of Automated Pipe Flow Measurement sensors for Drinking /Industrial water supply for 40 nos. of consumers with GSM telemetry 250.00 75.00 Bid Document is under preparation and will be submitted to NPMU for prior review by 30.10.2017 4. A1.5.01.02 Construction of Water Quality Lab and its furnishing 300.00 50.00 Drawing & Estimation is under process. 5. A1.9.02.01 Operation & Maintenance of 09 nos. of existing hydrological sites of DVC 300 30.00 The said work has been finalized & awarded on 04.08.2017

Major Procurement Items in AWP 2017-18 Sl. No. Item Code Item Total Allocated Fund (INR lakhs) Amount kept in FY: 2017-18 Status 6. A3.1.01.02 Construction of Hydrological Data Centre of DVC 250.00 75.00 Date of NIT: 14.06.2017 Date of opening of technical bid : 17.07.2017 No Response NOL for retendering received : 09.08.2017 Date of opening : 16.10.2017 7. C1.2.01.01 Inflow forecasting system and stream flow measurement for Damodar Basin upto outfall of Damodar River 20.00 ToR is under preparation and will be submitted to NPMU for prior review by 31.08.2017. 8. C2.3.01.01 Sedimentation survey of 4 nos. Reservoirs of DVC which are Maithon, Panchet, Tilaiya and Konar 80.00 5.00 ToR is under preparation in consultation with CWC and work will be awarded by 31.12.2017.

Status of Bid Document for the major works approved in FY: 2016-17 and 2017-18 Sl. No. Item Expected Proposal Submission date (as per AWP) Expected Contract Award date Status 1. RTDAS for DVC 16.05.2017 25.08.2017 Optimization of Hydromet sites finalised on : 21.07.2017. Submitted to Director River Data Compilation Directorate, CWC with copy to NPMU on 27.07.2017. Proposed Bid document submission date : 31.08.2017. Proposed Expected contract award date : 30.01.2018 2. Procurement of Automated Pipe Flow Measurement sensors for Drinking / Industrial water supply for 40 nos. of consumers with GSM telemetry 12.06.2017 15.09.2017 Finalization of tech-specs in consultation with FloodKon. Proposed Bid Document submission date for prior review : 30.10.2017. Proposed Expected contract award date :28.02.2017.

Status of Bid Document for the major works approved in FY: 2016-17 and 2017-18 Sl. No. Item Expected Proposal Submission date (as per NPMU) Expected Contract Award date Status 3. Construction of Hydrological Data Centre of DVC 27.01.2017 28.04.2017 NIT floated on :14.06.2017. Technical bid opened on: 17.07.2017. No response NOL received on : 09.08.2017. Revised NIT date : 16.08.2017. Date of opening of technical bid : 16.10.2017. Proposed Expected contract award date : 30.12.2017. 4. Inflow forecasting system and stream flow measurement for Damodar Basin upto outfall of Damodar River 22.09.2017 18.12.2017 ToR is under preparation. To be submitted to NPMU on 31.08.2017. Proposed Expected contract award date : 30.04.2018. 5. Sedimentation survey of 4 nos. Reservoirs of DVC which are Maithon, Panchet, Tilaiya and Konar 12.09.2017 18.11.2017 ToR is under preparation in consultation with Watershed & Reservoir Sedimentation Directorate, CWC. Proposed Expected Contract Award date : 31.12.2017.

Status of various Studies/PDS DVC has not proposed any PDS in FY: 2016-17 & FY: 2017-18. However details of PDS proposed in PIP are listed below: Sl. No. Item Code Item Total Allocated Fund (INR lakhs) 1. C1.1.01 River Basin Assessment of Damodar Basin (include water availability study & Future water utilization) 220.00 2. C2.1.01 Water Quality Studies of Surface and Ground Water of Damodar Valley Catchment 75.00 3. C2.3.02 Studies of Flood Inundated Areas of Damodar Valley Basin 60.00 4. C2.4.01 Study for exploration of Conjunctive use of Surface water with Ground Water 65.00

Status of Data Entry in E-SWIS Presently DVC is not entering data in E-SWIS. Proposal for getting the user ID and Password was sent to NPMU on 17.08.2017. Once we get the User ID and Password DVC will be a part of E-SWIS.

Status of Hydromet stations The Hydromet Stations in respect of DVC has been finalized in consultation with Chief Engineer (CWC), LGBO, Patna on 21.07.2017 which was intimated to Director River Data Compilation Directorate, CWC and NPMU on 27.07.2017.

Status of State WRIS In PIP approved for DVC, none of the items of WRIS has been kept. Hence, it is not applicable to us.

Status of PFMS Presently DVC is not using Public Finance Management System (PFMS) for efficient & effective tracking of Grant-in-aid (fund) received from the MoWR, GoI for implementation of National Hydrology Project.

Issues To achieve the time-line for RTDAS, frame work agreement by NPMU needs to be finalized at the earliest. On advice of the MoP, GoI DVC has signed Memorandum of Understanding (MoU) for 2017-18 with the ministry for management and control of Reservoir Operation & irrigation with application of GIS technology. As per the time-line fixed in the MoU, tender for procurement of GIS software is to be finalized by the end of Mar’18. A provision of Rs 90 lakh has been made in the approved PIP for DVC which has not been proposed in the approved AWP of 2017-18. As such procurement of GIS softwares needs to be included in the AWP of 2017-18 to ensure finalization of Tender by Mar’18 as committed by DVC to MoP. Proposal to this effect has already been sent to NPMU on 20.08.17 for consideration. NPMU has been requested to include this item of works in AWP of FY 2017-18.

Way Forward DVC is preparing to achieve revised targets for works under NHP. We will complete all the works within the stipulated time frame. As per the approved annual plan 2017-18, total fund allocated is Rs. 537 lakh. First instalment of Rs. 209 lakh for FY 2017-18 was received in July’17. Fund available in FY 17-18 is Rs.234 lakh. Quarter wise expenditure plan for FY: 2017-18. Additional fund requirement in FY: 2017-18 over & above Rs. 184 lakh is Nil. Fund requirement in FY: 2018-19 is Rs. 303 lakh. Quarter Proposed Expenditure (Rs. in Lakh) Q1 14.85 Q2 10 Q3 50 Q4 109.4 Total 184.25