L. Coney UC Riverside MICE CM32 – Glasgow – June 2012

Slides:



Advertisements
Similar presentations
January 14, 2004 TJR - - UPDATED 1/25/04 1 MICE Beamline Analysis Using g4beamline Including Jan 25 Updates for Kevin’s JAN04 Beamline Design Tom Roberts.
Advertisements

MOM Report Ray Gamet MICE Operations Manager University of Liverpool MICO 18 th May 2009.
MOM Summary 19/01/10 Water Now the ice has cleared I am able to get on the roof again. Could do with getting the conductivity readings fed back similarly.
DAQ WS03 Sept 2006Jean-Sébastien GraulichSlide 1 Wrap Up o Control and Monitoring o DDAQ o Interface between DDAQ and MCM o Infrastructure Jean-Sebastien.
Linda R. Coney – 24th September 2009 MOM Update End of Sept Run Linda R. Coney 05 October, 2009.
Online Reconstruction Update Linda R. Coney UCR Mar 25, 2010.
MOM Report Ray Gamet MICE Operations Manager University of Liverpool MICO 11 th May 2009.
MICO 22 nd February 2010 Terry Hart (MOM) - Decay Solenoid and Target - MICE Machine Physics runs - User Run Plans.
Online Reconstruction Update Linda R. Coney UCR Dec 17, 2009.
MICO Meeting, 1 st March 2010 Terry Hart (MOM) - Decay Solenoid - Targets - DAQ - March User Runs Plans - Suggestions.
Luminosity Monitor Commissioning MICE Collaboration Meeting March 2010 Paul Soler, David Forrest Danielle MacLennan.
Linda R. Coney – 24th April 2009 Online Reconstruction & a little about Online Monitoring Linda R. Coney 18 August, 2009.
Pierrick Hanlet MICO June 6, 2011 MICE Operations Manager Report.
MOM Report Paul Soler MICE Operations Manager University of Glasgow MICO May 5, 2009.
VC Sept 2005Jean-Sébastien Graulich Report on DAQ Workshop Jean-Sebastien Graulich, Univ. Genève o Introduction o Monitoring and Control o Detector DAQ.
MOM Report Linda Coney MICE Operations Manager University of California, Riverside MICO Meeting June 7, 2010.
TOF calibration Y. Karadzhov. Y. Karadzhov, MICE CM26 24 March Slide 2 TOF Calibration - Trigger TOF1 TOF 0 TOF 1 TOF 2 The blue line encloses the calibrated.
MOM Report Paul Soler MICE Operations Manager University of Glasgow MICO April 4, 2011.
MOM Report Paul Soler MICE Operations Manager University of Glasgow MICO April 19, 2010.
MICO 15 th February 2010 Terry Hart (MOM) - Decay Solenoid and Target - MICE Machine Physics runs - User Run Plans.
MOM Report Linda Coney MICE Operations Manager University of California, Riverside MICO Meeting May 24, 2010.
MICE Online Linda R. Coney UCR MICE CM30 Oxford July 2011.
Electrical & Control CM40 Daresbury Laboratory. CM40 Electrical Infrastructure Update RRM2 Latest Latest on Installation Progress Rack Allocations Racks.
1 Project Management Web Tools at the MICE Experiment Linda R. Coney – UC Riverside CHEP – May 2012.
Alan Grant OsC 30/4/ UK Project Finance & Schedule.
CM26 March 2010Jean-Sebastien GraulichSlide 1 Online Summary o The heplnw17 case o DAQ o CAM o Online Reconstruction o Data Base o Data Storage Jean-Sebastien.
MICE CM February 08Jean-Sébastien GraulichSlide 1 Detector DAQ Hardware Status o Introduction o Preliminary list o Plan for action o Summary Jean-Sebastien.
Physics Program and Runs: Autumn 2011 & Step IV V. Blackmore MICE Project Board, 08/03/12.
MOM Report Galina Vankova RAL, MICE Video Conference.
1 Operations Summary L. Coney – UCR MICE CM34 – Oct 2012.
1 The MICE Online Systems Linda R. Coney CHEP – May 2012.
1 Review of Recent Run L. Coney – UCR MICE CM34 – Oct 2012.
1 Online Summary and MICE Operations Linda R. Coney – UCR CM35 – 16 Feb 2013.
1 Operations Overview L. Coney UC Riverside MICE CM32 – Glasgow – June 2012.
1 MICE Running L. Coney – UCR MPB – 31 Oct Coney - MPB - 31 Oct 2012Outline Current Running Current Running Shift personnel training Shift personnel.
Linda Coney MC VC May 19, 2011 MICE Operations Manager Report.
RSLR mtg 28/3/2014 RLSR mtg Alan Grant. 2 RLSR mtg 28/3/ MICE Finances - Forward Look.
Goals & Status MICE CM 33 Thanks go out to the organizers: Paul Soler, Ryan Bayes and Valerie Flood.
Tracker Summary Alan Bross MICE CM October 10, 2007.
Click to add Text L. CONEY1 MICE Shifter Training June 2015.
Luminosity Monitor UKNF Meeting 7 June 2010 Paul Soler, David Forrest Danielle MacLennan.
Particle Production in the MICE Beamline IPAC10 Linda Coney, UC Riverside, Adam Dobbs, Imperial College London, Yordan Karadzhov, Sofia University The.
MICE FAC Alain Blondel 21 september   MICE The International Muon Ionization Cooling Experiment BRIEF STATUS OF MICE.
MICE CM35 Status and Goals Alain Blondel 1 WELCOME TO MICE CM35! – Status and Goals - Many thanks to Chris Rogers, Debbie Loader and Rose Hayes for taking.
1 KEK test-beam software progress Malcolm Ellis MICE Video Conference 4 th May 2005.
MICE Oversight Committee Meeting RAL, 24 April 2014 Paul Soler on behalf of the MICE Collaboration Status of MICE and Spectrometer Solenoids.
Linda R. Coney – 5 November 2009 Online Reconstruction Linda R. Coney 5 November 2009.
MICE Project Report Alan Bross (for Paul Drumm). Project Issues ● Key dates: – ISIS Synchrotron start-up scheduled for 1st August ● Shielded area around.
MICE CM28 Oct 2010Jean-Sebastien GraulichSlide 1 Detector DAQ o Achievements Since CM27 o DAQ Upgrade o CAM/DAQ integration o Online Software o Trigger.
OsC mtg 24/4/2014 OsC mtg Alan Grant. 2 OsC mtg 24/4/ MICE Finances - Forward Look.
1 Mice Collaboration Meeting CM33 Glasgow University 25 th – 29 th June 2012 STFC Daresbury Laboratory Electrical Infrastructure Report Authors : Ian Mullacrane.
Database David Forrest. What database? DBMS: PostgreSQL. Run on dedicated Database server at RAL Need to store information on conditions of detector as.
MICE CM39 St Catherine’s, Oxford, 26 June 2014 Paul Soler Instrumentation Global Commissioning Plan.
Tracker Cosmic Ray Test 2011 Linda R. Coney UC Riverside CM 29 - February 16, 2011.
Detector Summary Tracker. Well, as far as the tracker hardware is concerned, we are done. – Need to do the system test to make sure nothing has degraded.
MICE CM20 Alain Blondel 10 February The International Muon Ionization Cooling Experiment MICE CM20 Spokesmouse remarks.
MOM Report Linda Coney MICE Operations Manager University of California, Riverside MICE Video Conference May 20, 2010.
Technical Board Summary Alan Bross MICE CM17 CERN February 25, 2007.
MICE Online Group Linda R. Coney UCR MICE CM31 UMiss October 2011.
Coney - CM36 - June Online Overview L. Coney – UCR MICE CM36 – June 2013.
1 UK Project Finance & Schedule. Overview Finance  Budget Setting 2013/14  June Finance  Forward look to complete stepVI Schedule  Overview 2.
MICE Step IV Commissioning: Overview (March-April 2015) Milorad Popovic MAP 2015 Spring Collaboration Meeting.
Project Managers Report CM38 – Napa Roy Preece 24th February 2014.
Online & Operations Summary Linda R. Coney UCR MICE CM32 – RAL Feb 2012.
MICE Operations Scenario Run 1
The Muon Ionization Cooling Experiment: Controls and Monitoring
Controls & Monitoring in MICE
Chris Rogers, ASTeC, Rutherford Appleton Laboratory
Chris Rogers, ASTeC, Rutherford Appleton Laboratory
How to turn on MICE Step IV
Presentation transcript:

L. Coney UC Riverside MICE CM32 – Glasgow – June 2012 Operations Summary L. Coney UC Riverside MICE CM32 – Glasgow – June 2012

Operations Session Plenary Session – Tuesday AM Beam Line Optics – M. Leonova Operations Overview – L. Coney DAQ – Y. Karadzhov Controls & Monitoring – P. Hanlet MICE Timing & RF Phase – P. Smith Tracker Timing w/ISIS RF – E. Overton Standard Online Group Mtg – Wed at lunch

DAQ - Yordan New version of DATE and SL EMR boards finished (firmware not quite) New eventbuilder machines (miceraid 4/5) Ongoing/future System testing after many changes/upgrades New trigger system under development – VME board – reduce vulnerability of cable nest

Controls & Monitoring - Pierrick SS & FC standalone – Daresbury Target Control and user interface improved – Matt R. Additional capability to Tracker control – Matt R. Step I documentation of all PVs – Chris H. New Monitoring UPS, Server Rack, Network Rack, Power – Pierrick Target Info: ISIS current, Beam Loss, Beam position – Pierrick Run Status – DAQ monitoring – Pierrick Hall AC units – Pierrick Run Control – Pierrick Simplify operations Remove chance for user/shifter error

Controls & Monitoring - Pierrick Future Final SS and FC PS racks, Control Racks, Services, Monitoring Need go through single point to interface/prioritize/coordinate - Pierrick More Future RF Tuner – Pierrick LH2 Monitoring – Pierrick Proton Absorber – Pierrick

Timing – Paul S. and Ed O. MICE RF timing Tracker Timing with ISIS RF describe method to measure phase angles and amplitude of electric field in 8 MICE RF Cavities Chris R. wants better timing than TOF measurement to make TOF the limiting factor Assembling test bench Tracker Timing with ISIS RF Generate appropriate live window for trackers Done during single station run

Operations – L. Coney Focus on Step IV Staff shifts/take data – extensive running New shifter training instituted Better link between Analysis & Operations Modify/supplement MOM system New systems coming on line – safety, expert operation Relieve stress of overcrowded MLCR Consider option of “remote MLCR” How do? What functionality can be outside MLCR? Change daily walkthru – NOT need Hall access

Step IV Operations Continue: Improve: New equipment arriving Continue pre-run preparation Further simplify running Improve: Automate procedures g fewer errors Move from spreadsheet g only ConfigDB Increase Online Reconstruction capabilities Complete suite of detectors, Online analysis, Global reco New equipment arriving Need expertise – do we have a plan for support? Timing – with ISIS RF for tracker, plan for RF stages Modify procedures to include SC magnets and LH2 system How staff multitude of shifts?

Operations Needs Standardize & understand beamline settings How cooling channel B fields affect Operations? can we still control/monitor/operate the equipment? Handover/knowledge retention between MOMs still not ideal concerns regarding running in 2013 need permanent overarching position Systematic understanding/overview of MICE safety systems MOM position fleeting – lose track of what done

Conclusions Operations going well – we continue to improve for each run Feb CM Operations Needs: New magic spreadsheet New takeover of G4Beamline Proper training Documentation to be (remain) current Documentation of changes to procedure Much more to do – Step IV is rapidly approaching