Strategic and Integrated Stormwater Management Through Open Space Master Planning Celso Guitian, UMBC Matt Thomasson, RK&K Engineering Amelle Schultz,

Slides:



Advertisements
Similar presentations
Promoting Watershed-Based Stormwater Management for Linear Projects through the Green Highways Partnership Patrick Jeffers, U.S. Environmental Protection.
Advertisements

Introduction to Concurrency Management. What is Concurrency? Chapter , F.S. requires Comprehensive Plans to adopt a concurrency management system,
Integrated Water Management at a Rapidly Growing, Drought Prone Campus Sally Hoyt, Stormwater Engineer Cindy Shea, Sustainability Director The University.
Towards a Worcestershire Green Infrastructure Strategy WPEG, 5 September 2012 Marta Dziudzi Planning Policy Assistant Strategic.
Stormwater harvesting – standards, regulations and Industry practice Presentation to Recycle Water May 2013
Spruce Beetle Epidemic & Aspen Decline Management Response EIS Adaptive Implementation Process.
Implementing Committee Meeting May 15 th, 2014 New Braunfels MS4 program and the HCP 1.
Upper Providence Township Stormwater Management MS4 Program.
1 The Challenge Preserving forest cover, parkland and open space can help to meet needs for water quality, air quality, recreation and wildlife habitat.
Potomac Ridge Stormwater Management Project
NPDES Phase II Storm Water Regulations: WHAT MUNICIPAL GOVERNMENTS NEED TO KNOW.
DRAFT SUSTAINABLE COMMUNITIES CLIMATE ADAPTATION GUIDEBOOK Kate Marshall, SRA International, Inc. (703) ,
Capital Financial Plan and Physical Design Framework DRAFT Committee on Grounds and Buildings May 2010.
Stormwater Management 101: Implementation Options through Partnerships
Wiltshire Green Infrastructure Strategy. What is green infrastructure? The Wiltshire Green Infrastructure Strategy Wiltshire’s existing green infrastructure.
USDA Sustainable Landscape Partnership U.S. Forest Service Natural Resources Conservation Service Agricultural Research Service Agriculture Marketing Service.
Improving Your World. RS&H tradition began in 1941 Employee-owned company Six programs of client-focused services Multi-disciplined team of planners,
Linda K. McCarthy, Executive Director Missoula Downtown Association Missoula, Montana
Crafting Stormwater Programs Oregon Coastal Planners Fall Network Meeting October 9, 2008 Florence Event Center Alissa Maxwell, PE.
THE COST AND LEVEL OF SERVIC E PRESENTED BY: COURTNEY REICH, AICP ECOLOGICAL PLANNING GROUP Stormwater Management Programs for Local Governments.
Integration Of Stormwater Master Plans with Watershed Plans The Link between Flooding and Development September 23, 2008 Bob Murdock, P.E., CFM.
Ohio Balanced Growth Program Best Local Land Use Practices Development Incentives Kirby Date, AICP, Cleveland State University.
1 A Framework for Comprehensive Planning City of Sunset Valley.
New Stormwater Regulations “C.3” Provisions in effect Feb. 15, 2005.
Accomplish More Together Conservation Planning for Green Infrastructure: A Greenprint for Sustainability Michael S. Fishman, CWB, PWS Greg Liberman, CPESC.
Stormwater Retrofitting: The Art of Opportunity Prepared by the Center for Watershed Protection.
Best Practices in Addressing NPDES and Other Water Quality Issues in Highway System Management NCHRP 20-68A, Scan DOMESTIC SCAN PROGRAM Scan Overview.
Stormwater and C.3 Overview Tom Dalziel, Assistant Manager Contra Costa Clean Water Program.
Laguna Creek Watershed Council Development of the Laguna Creek Watershed Management Action Plan & It’s Relevance to the Elk Grove Drainage Master Planning.
Oregon Department of Transportation Stormwater Management Initiative: Meeting New Challenges Presented by: William Fletcher, ODOT February 5, 2008.
Post-Construction Requirements Design Challenges Dan Cloak, P.E.
Kitsap County Department of Community Development Updating Kitsap County’s Shoreline Master Program (SMP) – process overview, public outreach, involvement.
Understanding and Improving Walkable Caribbean Urban Heritage: St Georges, Paramaribo, Bridgetown and East Port of Spain.
An Overview of our Community’s Stormwater Management Program
New Development and Significant Development 12/21/20151 New Development & Significant Redevelopment.
Marin County Watershed Stewardship Program Marin County Department of Public Works.
EcoPRO Vision Trained, certified professionals will establish sustainable landscaping as the norm for homes, institutions, and public spaces, thus contributing.
Blue Springs High School Blue Springs, MO Project in the Design Phase Design Concept Award Hollis + Miller Architects 2009 Exhibition of School Planning.
Prevention not Intervention Developing a Sound Response to Erosion and Sediment Control Problems through the Planning Process.
T H E P O R T L A N D P L A N A Comprehensive Plan for Portland in 2040 September 2007.
Prepared by: Alex Fisch Planning Services Division.
Chapter 3 Facility Design and Construction. Chapter Objectives 1.Describe the process of facility design and construction 2.Demonstrate proficiency in.
Park Planning for the City of San Diego Robin Shifflet April 22, 2016 City of San Diego Planning Department.
Briefing regarding the new State General Stormwater Pollution Control Permit.
Interagency Coordination in Long Range Transportation Planning
Kennett Township land Stewardship Initiative
GREEN STREETS | GREEN JOBS | GREEN TOWNS INITIATIVE
Restoration and Regulation Discussion
Growth Management Amendments Land Use & Transportation
* Background Image Courtesy of Kansas State Alumni Association *
2006 Facilities Master Plan Update Cañada College
Data Architecture World Class Operations - Impact Workshop.
Welcome to the Green.Arkansas.gov Question & Answer Session
Restoration and Regulation Discussion
2017 Florida Redevelopment Awards Capital Projects/Beautification
INAC Water and Wastewater: Discussion on Current Policies and Processes Presented at: Circuit Rider Trainer Professional Association’s Annual General Meeting.
PENNSYLVANIA STORMWATER BEST MANAGEMENT PRACTICES MANUAL
Strategic Planning Update
FHWA Bicycle and Pedestrian Program
Building a Phase III WIP for Wastewater, Stormwater & Septic Systems
GIS Data Management for SHA’s Bay Restoration Program
Matt Tunnard, PE, Ford Land Donald Carpenter, Ph
Washington County Parks and Open Spaces
PREPARED BY: JOSHIMA V.M., UNIVERSITY OF NIZWA
GREEN INFRASTRUCTURE PLAN FOR (Permittee)
MDE’s Phase III WIP Inventory 2018 Fall Regional WIP Meetings
Green Infrastructure Planning Update
* Background Image Courtesy of Kansas State Alumni Association *
Restoration and Regulation Discussion
An example of identifying and meeting water policy needs
Presentation transcript:

Strategic and Integrated Stormwater Management Through Open Space Master Planning Celso Guitian, UMBC Matt Thomasson, RK&K Engineering Amelle Schultz, Ayers Saint Gross Architects & Planners Moderated by: Ted Brown, Biohabitats

Learning Objectives Understand the importance of an integrated approach to campus planning of stormwater management elements, open spaces and natural areas. Understand the benefit of using thoughtful landscape elements to improve water quality, protect downstream areas, define the character of open spaces, and reduce maintenance. Learn how innovative modeling techniques provide dynamic updating of the campus hydraulic model and how this translates to better asset management and compliance with increasingly more stringent environmental regulations.

Presentation Overview UMBC Campus – an innovative case study Project Overview Open Space Planning & Stormwater Management Integration Regulatory Agency Coordination Implementation – next steps to realize the plan

UMBC Campus an innovative case study Baltimore UMBC Washington BWI

UMBC Campus an innovative case study UMBC in Numbers Founded in 1966 520 acres 13,640 students 3.9 million SF of space 6,800 parking spaces $68 million in annual research

UMBC Campus Successful Outdoor Development

Environmental Challenges Fairly rapid and consistent student growth of 1-2% per year Since our last masterplan in 2009, we had undertaken nine major building projects – each experienced a certain degree of frustration with the environmental (stormwater) regulatory process. While we supported the goals of the regulatory agencies, the specifics of the regulations discouraged the quality of outdoor spaces that make a university campus successful.

UMBC Campus Impact of Stormwater Management

Environmental Challenges Inconsistency in project response to site challenges Historic roadways and parking areas with little or no treatment of stormwater runoff Four streams running through the campus carrying runoff from upland areas Poor historic documentation of stormwater improvements

Environmental Opportunities Project Goals Develop a holistic, campus-wide approach to stormwater management Provide the university with an implementation plan that addresses our stormwater management responsibilities Partner with MDE to develop a management plan that will provide predictability when projects are reviewed for permitting Develop a tracking tool to coordinate management and maintenance programs

Environmental Opportunities Additional Project Goals To provide for a more unified campus environment, highlighting the unique character and setting of the university Establish a set of guidelines that will serve as a policy and visioning tool during planning and design of future projects Develop an Open Space Framework

Open Space Planning What are the advantages of studying our open space networks?

Why should we improve open space and pedestrian networks? Improves overall campus setting Enhance the University’s image as premier institution Contributes to improved wayfinding Humanizes the landscape for students, faculty, staff, and visitors Creates a sense of place with consistent materials and details Create meaningful gathering places throughout campus Integrates SWM into the campus landscape aesthetic

Existing Open Space Typologies Forested Areas Quadrangle Stormwater Management Facility Recreation Fields Plazas

Existing Open Space Typologies Forested Areas Quadrangle Stormwater Management Facility Recreation Fields Plazas

Existing Open Space Typologies Forested Areas Quadrangle Stormwater Management Facility Recreation Fields Plazas

Open Space Framework

Open Space Framework Major Pedestrian Spines

Existing Major Pedestrian Spine

“Integrates SWM into the campus landscape aesthetic” Proposed Major Pedestrian Spine

Existing Roof

“Integrates SWM into the campus landscape aesthetic” Proposed Green Roof

Existing Bioretention

“Integrates SWM into the campus landscape aesthetic” Proposed Bioretention

Existing mowed turf

“Integrates SWM into the campus landscape aesthetic” Proposed turf to meadow

Detail Studies

Design Guidelines Landscape Architecture Stormwater

Does your campus value the aesthetics of a landscape integrated with stormwater management? If not, do you have suggestions on how this might become more appreciated?

Open Space Planning & Stormwater Integration Cohesion among: Buildings Open Space Stormwater Management Working Landscapes that incorporate SWM What do you mean by cohesion between buildings and Open Space?

This is NOT a cohesive campus facility Perimeter fence Separates parking from buildings No passive/active use Not attractive Does not create much habitat Valuable campus footprint near buildings

Bio-Retention Facility & Courtyard in Traffic Circle SWM incorporated into landscape Valuable open space created Active use Attractive Utilized area within a traffic circle

Regulatory Agency Buy In Stormwater Intuitional Management Plan (IMP) Tracking of stormwater management credits Documented outflows at points of analysis from Campus More streamlined permit process for projects in master plan Regional/Campus approach to stormwater treatment Basis for MS4 Compliance

Watershed Model GIS Entire campus landcover modeled Two major points of discharge from campus Hydraflow Hydrographs 70+ existing SWM facilities 13 sub drainage areas Allows us to analyze SWM impacts by sub drainage area instead of project limits

Future Building Development Not limited to a hydrologic analysis of project area Impact to the overall campus drainage area SWM facilities outside of immediate project area Analyze the impact of standalone SWM projects Non-structural practices within a drainage area How do you keep the models up to date as the Master Plan is built out?

Stormwater Management Tracking Tool – Asset Management Updated GIS feature classes Revised land cover SWM facility data Drainage areas Storm drain pipe and structure data Permitting documents

Asset Management Strategy Design RFP A/E Team GIS Protocol Tool Requirements Design Construction RFP Detailed As-Built Survey Requirements Construction Detailed As-Built Survey (Construction) Construction Contractor Provides CADD As-Built A/E Team Completes GIS Protocol Tool Template UMBC Merges Changes Into GIS Model

So, we have a plan – what are the next steps? Regulatory buy-in (Approved MDE Institutional Management Plan) Use the open space design guidelines during project development to create consistency Require all A/E Teams to provide consistent reporting of calculations to insert into the GIS asset management tool

So, we have a plan – what are the next steps? Funding the improvements Ensure that each capital project contributes to our campus-wide goals and requirements Submitting a site improvement capital project to address both infrastructure upgrades and stormwater improvements Engage students through cleanups, education and class projects Conduct research to measure and track success

Strategic and Integrated Stormwater Management Through Open Space Master Planning Celso Guitian, UMBC Matt Thomasson, RK&K Engineering Amelle Schultz, Ayers Saint Gross Architects & Planners Moderated by: Ted Brown, Biohabitats